Peter Sharp CERN CMS Tracker 2008 1 Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 1 Simulation WG Summary There was no actual separate Simulation Working Group/sessions.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
ATLAS micromegas activities (MAMMA)
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/28/2012.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
The SLHC CMS L1 Pixel Trigger & Detector Layout Wu, Jinyuan Fermilab April 2006.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Organization, Proposal and Funding We hope to finish the revised proposal this week Need some cleanup I added a section on simulation needs – should be.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
Dr.F. Arteche EMC DEPFET Project: A general overview.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Micro channel cooling Milestones proposal. Year 1 1) Requirement system definition in operational condition. Technology constraints for DRIE on chip design.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Atlas: Upgrade Phase I Massimo Della Pietra.
Hybrid Pixel R&D and Interconnect Technologies
TK Upgrade report.
2S module geometry updates Module positioning concepts
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
MicroMegas Mechanical Meeting --- Cern April 2014
Overview and plans of the ITK Layout Task Force
Work packages status in Torino and perspectives
HERD Tracker Layout Considerations
HL-LHC upgrade at IPHC news
SVT – SuperB Workshop – Frascati Sept. 2010
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008

Summary of the Tracking Trigger Working Group The Initial CMS Silicon Tracking System Provides CMS with an unprecedented Tracking Capability At Super LHC it will be Mandatory to Provide CMS with Excellent Tracking Capability at but with the Additional Ability to Provide a Level 1 Triggering Capability It was Clear from Many Presentations that there Exist Many System Options for Implementing an Upgraded Tracker with Level 1 Triggering Capability and that it would Help Enormously to Evaluate these Options within a Single Straw Man Layout Peter Sharp CERN CMS Tracker

Summary of the Tracking Trigger Working Group Two Approaches for Providing a Level 1 Trigger were Discussed and it was Agreed to Focus on the Track Vector Approach It was Agreed to Focus on a ‘Long Barrel’ Design that in Addition to Providing Tracking with Triggering should also Minimize the Material in the Tracking Volume It was Agreed to Vigorously Pursue this Straw Man with the Objective of Optimizing all Tracking Systems for this Layout and to Review the Progress after One Year. Peter Sharp CERN CMS Tracker

Summary of the Tracking Trigger Working Group In Addition to Focusing the Activities of the Simulation Working Group and the Layout Task Force it was Agreed to Partition the Required System Developments into a Number of Work Packages, to Ensure that All System Developments were Coordinated and Optimized for this Layout A Number of Groups who were Not Involved in the Initial CMS Tracking System have Expressed a Strong Interest in Contributing and Playing a Leading Role in a number Work Packages. It is hoped that more Groups will join in Future Peter Sharp CERN CMS Tracker

Layout for the Tracking Trigger Project Peter Sharp CERN CMS Tracker  2.5

Scope of the Tracking Trigger Project Peter Sharp CERN CMS Tracker Sensors Front End Electronics Interconnection Technology On Module Processing On Rod Data Transmission On Rod Processing Off Detector Processing Power, Cooling, Mechanical Structures To Trigger Off Detector Data Transmission

Basic Units for Tracking Trigger Project Peter Sharp CERN CMS Tracker mm 2700 mm 100 mm 2 mm Power Unit ~12V in ~1.8V out C0 2 Cooling System Module Unit 100 * 100 * 2mm Sensors, FE Electronics, Interconnections, On module Processing On Rod Data Transmission Mechanical Structure

Basic Units for Tracking Trigger Project Peter Sharp CERN CMS Tracker On Rod Processing Off Detector Processing Trigger FED DAQ Off Detector Data Transmission Cooling System Power System

Work Packages for Tracking Trigger Project Module Design Sensor, FEE, Interconnection, On Module Processing, Construction On Rod Data Transmission Simulation, On Rod Processing and Layout, Off Detector Data TransmissionOptimization Off Detector Processing and FEDs and DAQ system Systems Powering and DCS System (Grounding and Shielding) Engineering Cooling System Mechanical Layout and Structures Peter Sharp CERN CMS Tracker

Peter Sharp CERN CMS Tracker Proposed Project Time Scales 2009Define and prove the Viability of All Systems within the New Straw Man and Review Progress 2010Optimize the Layout and System Developments in the light of the work in Prepare Demonstrators of all the Systems 2012Prepare the TDR for an Upgraded Tracker Peter Sharp CERN CMS Tracker

Summary of the Tracking Trigger Working Group This has been a Very Productive Working Group (~ 45) which has Converged on a Number of Important Decisions I would like to Thank Everybody who Contributed to Defining this Exciting and Very Challenging Project, especially those Groups Joining for the First Time I would like to Thank our Hosts at Fermi Lab for providing the Creative Environment that made this Possible Thank You Peter Sharp CERN CMS Tracker