MODULE 2 Operate the Propane Liquid Supply System.

Slides:



Advertisements
Similar presentations
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
Advertisements

Preferred Utilities Manufacturing Corp.
Forktruck LP Gas Safety
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Propane Refueling Procedures. Information on Propane  Propane (C3H8) is a hydrocarbon that is sometimes referred to as Liquefied Petroleum Gas (LPG)
1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
Passive Leak Detection Operation Training October 2014.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
L. P. Gas Changing Tanks. Introduction L.P. gases belong to a family of chemical compounds known as hydrocarbons. This means they are made up of hydrogen.
INSTRUMENTATION AND CONTROLS FOR SAFETY
Identifying Equipment & Procedures Used on Propane Transports
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Zone Valves.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Boiler Mountings.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
MODULE 7 Bulk Plants.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
LNG Hazards.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
MODULE 6 Injecting Methanol and Evacuating Containers.
Designing and Installing Exterior Vapor Distribution Systems
NFPA 31 Standard for the installation of Oil- Burning Equipment
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
MODULE 8 Filling Cylinders.
Student Book © 2004 Propane Education & Research CouncilPage Purging Vapor Distribution Lines & Appliances Purging is the controlled displacement.
MODULE 2 Bobtail Equipment and Systems.
Portable Hydraulic Access and Rescue System
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
MODULE 6 Vehicle Parking, Servicing, and Security.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
MODULE 3 Bobtail Equipment and Systems.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Flammable Liquids Directorate of Training and Education
Installing DOT/ICC Exchange or Stationary Cylinders
Flammable and Combustible Liquids
Firefighting equipment
Essentials of Fire Fighting Maintenance and Testing Responsibilities
Compressor Operating Instructions
Presentation transcript:

MODULE 2 Operate the Propane Liquid Supply System

Module 2 – Operate the Propane Liquid Supply System In this module, you will learn to: Identify and safely open the valves in the liquid supply lines leading from the storage tanks. Avoid unintentionally closing (slugging) an excess flow valve. Reopen an excess flow valve to resume liquid delivery. Detect suspected contamination of stored propane. Avoid potential problems when operating with multiple storage tanks of different diameters. Know when it is necessary to shut down and secure the liquid supply system, and follow the proper procedure to do so.

LESSON 1 Open the Liquid Supply Line

Open the Liquid Supply Line

Liquid Outlet Valve Configurations

Emergency Shutoff Mechanisms ESV must be capable of being closed. Automatically by thermal (fire) actuation. Manually from a remote location. Manually at the valve. Open Position Closed Position

Emergency Shutoff Mechanisms Mechanical Latch Pneumatic Latch

Emergency Shutoff Mechanisms Fusible Elements – Built into ESV

Emergency Shutoff Mechanisms Fusible Elements – Remote Manual Close

Emergency Shutoff Mechanisms Remote Open and Close ESV with Pneumatic Operator Internal Valve with Pneumatic Operator

Emergency Shutoff Mechanisms A bulk plant must have an emergency shutdown system with: A mechanical or pneumatic connection to the internal valve, or to an approved ESV, in the liquid line in each storage tank. One or more emergency remote shutdown stations, each with a mechanism to manually close storage tank shutoff valves. An emergency remote shutdown station must be located between 25 and 100 feet from the transfer location.

Operating a Manual Shutoff Valve Multi-turn Globe valves Gate valves 90° turn Ball valves

Precautions Before Opening Valves

Open the Supply Line to the Pump

Discovery – What’s in Your Plant?

Lesson 2 How an Excess Flow Valve Works in a Liquid Line

Lesson 2 – How an Excess Flow Valve Works in a Liquid Line Purpose - limit the flow of propane in the event of an unsafe condition. – Hose rupture or separation. – Pipe breakage. – Someone opening a hose end valve not connected to a container. Found at: – Liquid outlet of propane storage tank. – Where the pipe diameter is reduced. – Sometimes at transfer points.

What Makes it Close?

How to Open It Close the closest downstream manual valve. Wait patiently for the excess flow valve to open - you may hear it click. Open the valve SLOWLY to avoid a sudden increase in flow.

Check for Understanding

Lesson 3 Detecting Contamination in Stored Propane

Lesson 3 – Detecting Contamination in Stored Propane Potential hazards include: Excessive pressure - discharge through pressure relief valve. Malfunction of fuel systems in propane-powered vehicles. Incomplete combustion in a forklift engine, contaminating air inside a plant. Health risk from release of contaminants into the atmosphere. Temperature/Pressure Relationship

Temperature/Pressure Relationship for Propane Exact composition may vary. Pressure at any given temperature is predictable for a particular composition with a particular specific gravity.

Other Clues Abnormal odor A frost line on the container Corrosion on brass or other yellow metals Oily material appearing when a hose is disconnected.

Lesson 4 Operate with Multiple Storage Tanks of Different Diameters

Lesson 4 – Operate with Multiple Storage Tanks of Different Diameters Filling Levels Aligned Filling Levels Not Aligned

Check Your Understanding See page 13 of student guide for Module 1 quiz.

Lesson 5 Shut Down and Secure the Liquid Supply System

Lesson 5 – Shut Down and Secure the Liquid Supply System When is Shutdown Necessary? Shutdown Procedure: – Make sure hose end valves are closed with dust caps or plugs installed. – Close liquid valve at storage tank outlet. – Close liquid and vapor return valves. – Secure transfer hoses. – Close and lock cabinets, gates or valves.

Case Study – Securing the Liquid Supply System

Summary Liquid supply systems vary. All must have valves that serve the following functions: – Excess flow valve. – Emergency shutoff valve. – Manual shutoff valve. – An internal valve may serve all three functions. An ESV must be capable of manual, remote and thermal shutoff. A pump should have a bypass line to return excess liquid to the storage tank. Always open the last valve slowly to avoid slugging an excess flow valve. When operating with multiple storage tanks of different diameters, extra care is required when their maximum permitted filling levels are not aligned. Any time a propane liquid supply system will be left unattended it must be shut down and secured.