Implementing an Adaptive Capital Improvement Program

Slides:



Advertisements
Similar presentations
Global nutrition clusters information management strategy and tools.
Advertisements

1 GIS for Water Maximizing the Benefits of GIS Susan Ancel - Director Water Distribution and Transmission EPCOR Water Services Inc. Geospatial World Forum.
ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
1 AASHTO - FHWA Peer Exchange on Asset Management and Performance Management July 26-27, 2010.
The implementation of the eWISA Water Care Assistant Flip Human Water Care Works Elize Marè.
17 th Annual New Mexico Infrastructure Finance Conference Integrated Planning and Funding for Utilities Development and Maintenance of the ICIP Program.
Integrated Analysis of Transportation Network with Pipeline System Vulnerabilities Berrin Tansel 1, Xia Jin 1, Kollol Shams 1, Bahareh Inanloo 1, Albert.
Community Water Supply Resources Implementation Strategy Lane Auditorium Albemarle County Office Building September 13, 2007.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
MBTA State of Good Repair Database
CITY OF NORTH PORT US41 CORRIDOR UTILITIES MASTER PLAN US 41 Utility Corridor Study Presentation April 27, 2010.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Overview of Key Rule Features
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Chapter 3 Asset Management. 2 Asset management Asset management = infrastructure management Infrastructure management = Capital management = Asset management.
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Chapter 20 The Budgeting Process.
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
© 2003 IBM Corporation July 2004 Technology planning for not-for-profit organizations IBM volunteer name Title, organization.
Lecture(1) Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Leveraging MS Project in an Integrated Portfolio Management Solution MSPUG- Phoenix Chapter.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Department of General Services Strategic Capital Asset Management (SCAMP) “You Can’t Manage What You Can’t Measure” COUNTY OF SAN DIEGO.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
hydroAMP asset management framework
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
1 Community Asset Management Program (CAMP) Asset Management GFOA Presentation April 3, 2007 Step 3 Visioning Step 4 Design Step 5 Pilot/Rollout “As Is”,
Clean Watersheds Needs Survey (CWNS) 2012 Gap Approach Option June 22, 2010.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Energy Policy Act - BLM Cadastral Support Strategy 1 CADASTRAL PLANNING CADASTRAL SERVICES Consultation for Effective and Efficient Land Management: National.
NASA Marshall Space Flight Center Facilities Engineering Management Office Facilities GIS and Data Integration October 2007 – Rocket City GeoSpatial Conference.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
South Fork improvements program – a mid-program report
8th Oct 2015 DIRECTOR BUSINESS DEVELOPMENT, WATER, INDIA PMP, C. ENG. MICE, MIET RAJESH PATWARDHAN SMART SOLUTIONS – ENERGY AND WATER.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
NC AWWA-WEA 95th Annual Conference
Planning for the Future: Superintendent’s Acceleration Agenda Phase II: Strengthening Operations Presentation to the Boston School Committee May 8, 2008.
6-1 Manufacturing Systems ERP Background Designed to re-order inventory using re-order point –Adapts production to customer orders –Increased flexibility,
KING COUNTY BRIDGES AND ROADS TASK FORCE Roads Services Division Financial Review September 16, 2015.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
1% Sales Tax Commission Board Meeting June 3, 2015.
The process of identifying and controlling the risks is called Risk Management.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Asset Degradation Modelling at Townsville Water
Enterprise Resource Planning, 1st Edition by Mary Sumner
Introduction to Management Accounting
Overview of the CoJ Water & Sanitation Master Plan
2017 Fee Calculation Methodology – A Case Study
Duffin Creek WPCP Optimized Renewal Planning & Decision-Making
Capital Improvements Planning
City of Fernley City Council Meeting
Enterprise Resource Planning, 1st Edition by Mary Sumner
Capital Improvement Plans
Southwest Section AWWA 2018 – Baton Rouge, LA
Capital Planning.
Presentation transcript:

Implementing an Adaptive Capital Improvement Program NC AWWA-WEA 95th Annual Conference Implementing an Adaptive Capital Improvement Program Katy Weidner, Black & Veatch

Acknowledgements Co-Authors Courtney Driver, City of Winston Salem Kevin Laptos, Black & Veatch Kent Lackey, Black & Veatch

Agenda Adaptive Capital Planning Winston-Salem’s Adaptive CIP Overview of the Master Plan Goals for Developing the iCIP Tool How the iCIP Tool Works

Adaptive capital planning

Adaptive Capital Planning Focus on Asset Management & Optimization rather than Expansion Need for cost-effective assessments Address worst condition assets first Risk based prioritization Planning for Growth alongside of Budgeting for Maintenance

CIP Prioritization - Old approach Traditional CIP Static CIP Report Time and situation constrained Not risk-based Not adaptable Adaptive Capital planning

Factors that can affect Planning Growth Rates Asset Condition Outside Factors Pictures for final presentation? Maybe cycle through

Winston-Salem’s Wastewater System Master Plan

City/County Utilities Commission – Collection System Overview 1,724 miles of sewer main 49 Pump Stations Two Treatment Plants Muddy Creek (21 MGD) Elledge (30 MGD) Three Major Sewer Basins 9

Wastewater System Master Plan Evaluate collection system capacity in three major basins Prioritize Capacity improvements 30 year Master Plan (2011 – 2041) Future Treatment Alternatives Evaluation Collection System Asset Evaluation Wastewater System Evaluation Capacity Driven Projects Condition Driven Projects CIP Projects 10

Developing the cip Projects Capacity Driven Projects Flow Projections Field Surveys and Flow Monitoring Hydraulic Model for Base and future Years Condition Driven Projects Facility Inspections Pipeline Prioritization Criticality Ratings based on consequence of failure Condition Scores evaluated based on available data, modeling results, and age of pipe

Asset Management approach to system planning Provides a comprehensive and coordinated Master Plan CIP

…But How final is the “final” CIP? What if… A routine pipeline inspection reveals a pipe failure at the location of a future capacity project? OR A 2020 DOT project includes tearing up and repaving the road at a sewer crossing in the 2030 CIP. Does it make sense to move forward the project? All of the project or maybe just the road crossing? We need to compare alternatives and update the CIP!

Adapting the cip using the iCIP tool

Customizing iCIP for Winston-Salem Evaluating Current Needs Critical Capacity Driven Projects Long-Term and Short-Term Budgeting Tools Increased functionality for Cost Estimating, Project Scheduling, and Cash Flow and Spend Plans Data Collection Plan Evaluating Future Needs Asset Condition Database Prioritize Inspection and R&R budgets 15

Adaptive approach to CIP Prioritization Three Components Asset Prioritization – Leverage GIS Inventory and updated condition data to prioritize projects (GIS) Asset Costing – Dynamic update costs based on project changes to scope and schedule (Excel) CIP project identification (iCIP)

Adaptive CIP Integrate the CIP spreadsheet with the iCIP GIS Inventory 26 April 2017 Adaptive CIP Integrate the CIP spreadsheet with the iCIP GIS Inventory 17 Black & Veatch

iCIP - GIS interactive Capital Improvement Planning Built on top of ArcGIS (Esri Add-in) Open architecture, Esri-based enhanced by B&V Integrate CIP with existing GIS Inventory Risk and Capacity Based Prioritization iCIP Cost estimating tool Elevate awareness with graphic displays Risk- and capacity-based prioritization Integrate with existing GIS asset inventory Geographic interface Adapt to changing budgets and priorities Dynamic budgeting and reporting 18 18

How iCIP works for Winston - Salem

Project Summary Window

Assets Window

Project Details Window

CIP Excel spreadsheet Summarizes Scope and Performance Triggers 26 April 2017 CIP Excel spreadsheet Summarizes Scope and Performance Triggers Calculates detailed Cost Opinions Project Phasing, Cash Flow and Encumbrance iCIP Tools in excel Black & Veatch

Hidden Cells contain the data used for cost estimates 24 Hidden Cells contain the data used for cost estimates

Unit Cost Assumptions Linked to Detailed Costs for easy updating 25 Diameter Material Installation Material cost Total Unit cost MH 6 DIP (Force Main) 35 26 61 2000 8 EVCP 80 38 118 3000 10 100 45 145 12 150 47 197 4000 15 53 203 6000 16 200 57 257 18 64 264 21 72 272 24 83 283 8000 27 Flowtite GRP SN46 250 125 375 30 128 378 36 155 405 12000 42 176 426 48 300 198 498 54 224 524 15000 60 557 66 286 586 323 623 25 Linked to Detailed Costs for easy updating

Phasing is Based on the Start Year and Project Duration 26

Adjusting cash flow

Adaptive CIP An Adaptive CIP can… Leverage risk-based prioritization and/or capacity assessments Immediately see results of decisions graphically Easily integrate with existing and updated GIS asset inventory Provide tools to adapt to changing budgets, asset conditions and priorities 28

In closing… An Adaptive CIP can respond to… Growth – Whether a recession slows growth or a housing boom in an unforeseen area accelerates growth, CIP projects can “slide” to when they are needed. Condition – Prioritization scores can be continually updated and used to allocate resources efficiently Outside Factors – Updates can be made to take advantage of developer projects, transportation projects, etc 29

Thank you for attending this presentation! any questions? ? Thank you for attending this presentation! 30