ASFPM Conference – May 2010 1 Shifting Our Focus from Maps to Risk William L. Coulbourne, P.E. Applied Technology Council (ATC)

Slides:



Advertisements
Similar presentations
Mitigation is a mind set. Storage in the basement.
Advertisements

FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
“Not your parents flood program “.  – information for the National Flood Program.  – digital flood.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
How to Use This Presentation Sharing the benefits of flood insurance to both current and potential clients will help you grow your book of business. Use.
Hurricane Katrina Update: PD&R Assistance Dana Bres, P.E. Research Engineer Affordable Housing Research and Technology Division Office of Research, Evaluation.
Earthea Nance, PhD, PE, CFM Assistant Professor, University of New Orleans Research Associate, Dillard University-DSCEJ Presented at the HBCU Student Climate.
Springettsbury Township STORMWATER AND HOW IT AFFECTS YOU February 19, 2013.
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
3-D Flood Risk Visualization Beth Norton December 21, 2011.
> > > > Association of State Floodplain Managers.
Changes to the National Flood Insurance Program (NFIP) Ross Richardson Chief, Floodplain Management and Insurance FEMA Region 6 March 27, 2013.
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
Maine Association of Mortgage Professionals
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Flood Avoidance and Mitigation
& CRITERIA FOR MAXIMUM ELEVATION OF RESIDENTIAL BUILDINGS IN FLOODPLAINS William L. Coulbourne, P.E. Applied Technology Council
1 Floodplain Management SESSION 15 Risks to Human Settlements What Are Hazards? Prepared By Rod Emmer CFM, PhD Larry Larson, CFM, PE.
Hazard Mitigation Planning V Session Name: Hazard Mitigation Planning V Coastal Hazards Management Course Task 6.1 Prioritize the Geographic Planning Areas.
New Directions in Water Policy: Environmental Perspectives on NFIP, Floodplain Mapping and Federal Water Resource Policies David R. Conrad Sr. Water Resources.
How to Use This Presentation Flood insurance is a critical part of any mitigation plan. A better insured community is a resilient one. Use this presentation.
How to Use This Presentation Sharing the benefits of flood insurance to both current and potential clients will help you grow your book of business. Use.
Emergency Management Cycle. Planning Regulatory Requirement Per 44 CFR (a) (1) - For all disasters declared on or after November 1, 2004, all states,
Flood Mitigation for Structures in the Gulf Coast Region Norma Jean Mattei, Ph. D., P.E. University Of New Orleans Special thanks to: Chris Jones, PE and.
Floodplains and your Treatment Plant How Hurricane Katrina Is Changing Your Floodplain in Michigan Daniel Schechter, P.E. Greeley and Hansen 1.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
Living in the Floodplain Kate Barrier. Where were you in April 1975?
> $20 Billion 1993 > $100 Billion 2005 > $15 Billion 2008.
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling.
6 August 2009 Buffalo District Planning Conference Flood Plain Management 2050.
N AVIGATING THE T URN : F LOOD R ISK A SSOCIATED WITH L EVEES Sam Riley Medlock, J.D., CFM Association of State Floodplain Managers May 2011.
1 Floodplain Management 2050 Are Gilbert’s Adjustment Factors Sufficient? Larry A. Larson, P.E. CFM Association of State Floodplain Managers.
Mitigation can include structural and nonstructural efforts.
Risk Map Update FGCS Meeting Paul Rooney FEMA January 13 th, 2014.
Overview of Flood Program April Doug Bellomo, Director Risk Analyses Division Mitigation Directorate, FEMA.
The State of the NFIP and flood policies – A system of risk management - Is it Time for a Change? David R. Conrad Sr. Water Resources Specialist National.
Setback Levees: Hydraulic, Ecologic and Economic Benefits Tony Melone, PhD, PE, CFM 2011 ASFPM National Conference.
Large Scale Nonstructural Programs - Louisiana’s Comprehensive Master Plan for a Sustainable Coast – 2012 Update Association of State Floodplain Managers.
A Safe, Secure, and Sustainable Coast: A Current Snapshot of Nonstructural Mitigation along Coastal Louisiana ASFPM, San Antonio, TX May 20, 2012 Alessandra.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
Session 17Slide 17-1 Financing Risk Reduction Session 17 Slide Deck.
Flood risk, flood prevention and flood insurance in The Netherlands
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
Climate Impact on MEC’s Infrastructure –Attempt to Quantify NYC's Risks from Coastal Storm Surges in the Face of Global Warming and Sea-Level Rise. K.
Mike Buckley, PE Former FEMA Executive May 27, 2015 Istanbul, Turkey.
Catharine Cyr Ransom Principal The Accord Group. Stafford Act Structured approach to disasters Partnership between local, state, Federal governments Authority.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Windsor Heights Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
USACE Flood Risk Management and Silver Jackets Workshop Sandra K. Knight, PhD, PE, D.WRE Deputy Associate Administrator for Mitigation, FEMA August.
MW-AT E Addressing the Challenges of Recovery & Rebuilding from Hurricanes Katrina & Rita Rebuild Louisiana Housing Programs February 20,
December 16 th, 2009 Presented by Jennifer DiLorenzo, M.S., CFM Sustainable Coastal Community Liaison Developed in Cooperation with the ASFPM 1 Floodplain.
John Sebree Senior Vice President of Public Policy Flood Insurance Update Florida Senate Banking & Insurance Committee October 8, 2013.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
1 ODNR - Floodplain Management Program Ensure the wise management of Ohio’s floodplains Floodplain Management in Mahoning County August 16, 2016.
Prince George’s County Flood Forum March 23, 2017
Flood Damage Prevention Code Update
Flood Hazard Area, Flood Insurance and Stormwater Management
Flood in Austin - Economic losses assesment
Flood Risk and Climate Adaptation:
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Preparing for NFIP Reauthorization Washington, D.C.  September, 2016
Presentation transcript:

ASFPM Conference – May Shifting Our Focus from Maps to Risk William L. Coulbourne, P.E. Applied Technology Council (ATC)

ASFPM Conference – May Topics of Discussion  Background  Proposed modifications to our current approaches to floodplain management  Flood design information must include risk  Risk must reflect probability of the event  Need to consider mitigation measures in addition to elevation  All flood insurance is not equal  Conclusions and Recommendations

ASFPM Conference – May Background  Last 20 years we’ve experienced many major flood events  1993 – Midwest floods  1997 – Red River floods – ND/MN  2005 – Hurricane Katrina  2008 – Midwest floods  2008 – Hurricane Ike  2009 – Red River floods  NFIP has over 20,000 participating communities and 5.5 million policies  Represents $1 trillion in exposure  NFIP program is $19 billion in debt

ASFPM Conference – May Background  Current mitigation to reduce losses is really just:  Elevation  Relocation  There are currently many ways to “ignore” the property location  LOMR – remove the land from the floodplain  Levee – protected by a manmade structure  Adjacent to a ‘100-year’ floodplain and you are out  Live in a house built pre-FIRM, you’re subsidized

ASFPM Conference – May Background (and the smell test)  Mapping standards require flood plain delineations to 1/10 th ft. and then are shown on maps drawn to 1:600 – 1:700 scale (from paper titled: Demonstrating Floodplain Uncertainty Using Flood Probability Maps)  How much sense does that make?  Width of the boundary line could be 25 ft.  Conclusion I draw is the current strategy is not working

ASFPM Conference – May Considerations for the Program  Flood design must include risk – now the risk is “read” as all the same everywhere in the flood plain  Risk must reflect the probability of the event  The only feasible mitigation solution is elevation above the ‘design event’ – need more options  All flood insurance must be actuarial and represent the risk

ASFPM Conference – May Flood Design Must Include Risk  Risk = probability x consequences  Low risk = high probability x low consequences  High risk = low probability x high consequences  Not all development in the flood plain is equal (unequal consequences to the community)

ASFPM Conference – May Generic plot of risk

ASFPM Conference – May Possible Risk Levels  Very High Risk:  Property in coastal high hazard area  Economic impact is great if damaged  Affects more than 50,000 people  Recovery would require more than 3 mos.  Property is behind flood protection barrier not inspected within last 5 years  Iconic buildings could be flooded  Flood depths could exceed 5 ft, velocities 5 fps

ASFPM Conference – May Possible Risk Levels  High Risk:  Flood protection barrier inspected within last 5 years  Flood depths could be 3 ft but not likely to exceed 5 ft.  Important buildings could be impacted but community has plan for continued operations  Population affected 10,000 – 50,000

ASFPM Conference – May Possible Risk Levels  Moderate Risk:  Last floodplain study less than 2 years old  Flood depth will not exceed 3 ft.  Population affected less than 10,000  Property might be on fill and thus cut off by floods  No community-important buildings affected

ASFPM Conference – May Possible Risk Levels  Low Risk:  Property outside mapped flood plain  Flood depth less than 2 ft.  No property is isolated by flooding  Population affected less than 5,000  No community-important buildings affected

ASFPM Conference – May Example – Cedar Rapids, IA 2008

ASFPM Conference – May Example – Cedar Rapids, IA 2008 Very High Risk High Risk

ASFPM Conference – May Risk Must Reflect Probability  It seems that many floods in last few years are exceeding the mapped probability (1% annual chance)  Maybe these floods are not really 1% annual events but something greater  Maybe our standard is to low (Dutch – 10,000-yr recurrence interval)  Continued development in/near floodplains will continue to increase flood probabilities (always changing condition)

ASFPM Conference – May Need Options to Elevation  Elevate to what elevation?  100-year event?  500-year event?  Engineer to resist floods  Perhaps elevation is not economically feasible – but actuarial flood rates are feasible  Dry floodproofing?  Wet floodproofing?

ASFPM Conference – May Stop Encouraging Development  Areas behind flood protection structures should be classified High Risk  Properties elevated within the designated floodplain are “not out of the floodplain”  Some places should be no build areas – coastal high hazard areas, floodways, areas where flood velocity > 5 fps  Properties within flood boundaries are either insured or do not receive federal assistance if damaged

ASFPM Conference – May Floodplain or not?

ASFPM Conference – May All Flood Insurance is not Equal  Premiums should be based on risk – not just elevation +/- BFE or in/out of 100-yr floodplain  Premiums should be higher when closer to the flood source  Premiums should account for installed mitigation measures of all sorts

ASFPM Conference – May Conclusions & Recommendations  Making a shift from maps to risk-based floodplain approach will not be easy or fast  Making a shift is imperative if we ever need for this program to be self-sufficient  Must broaden the pool of flood insurance contributors at the same time that the basis changes to risk  Must have insurance be actuarial at the same time the basis changes to risk

Questions?