Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.

Slides:



Advertisements
Similar presentations
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
Advertisements

M.C. Vetterli – WLCG-OB, CERN; October 27, 2008 – #1 Simon Fraser Status of the WLCG Tier-2 Centres M.C. Vetterli Simon Fraser University and TRIUMF WLCG.
Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
Ian Bird LHCC Referees’ meeting; CERN, 18 th November 2014.
Ian Bird LCG Project Leader LHCC + C-RSG review. 2 Review of WLCG  To be held Feb 16 at CERN  LHCC Reviewers:  Amber Boehnlein  Chris.
Sue Foffano LCG Resource Manager WLCG – Resources & Accounting LHCC Comprehensive Review November, 2007 LCG.
Collaboration Board topics Ian Bird CB Meeting; New York 19 th May 2012.
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Project Status Report Ian Bird Computing Resource Review Board 30 th October 2012 CERN-RRB
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
Tier 1 in Dubna for CMS: plans and prospects Korenkov Vladimir LIT, JINR AIS-GRID School 2013, April 25.
Resources and Financial Plan Sue Foffano WLCG Resource Manager C-RRB Meeting, 12 th October 2010.
16 October 2005 Collaboration Meeting1 Computing Issues & Status L. Pinsky Computing Coordinator ALICE-USA.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
Workshop summary Ian Bird, CERN WLCG Workshop; DESY, 13 th July 2011 Accelerating Science and Innovation Accelerating Science and Innovation.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
Ian Bird LHCC Referees Meeting; CERN, 12 th March 2013 March 6, 2013
Progress in Computing Ian Bird ICHEP th July 2010, Paris
Summary of RSG/RRB Ian Bird GDB 9 th May 2012
Ian Bird GDB; CERN, 8 th May 2013 March 6, 2013
24x7 Support Ian Bird GDB 9 th September The response times in the above table refer only to the maximum delay before action is taken to repair.
Ian Bird LHC Computing Grid Project Leader LHC Grid Fest 3 rd October 2008 A worldwide collaboration.
The LHC Computing Grid – February 2008 The Challenges of LHC Computing Dr Ian Bird LCG Project Leader 6 th October 2009 Telecom 2009 Youth Forum.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Ian Bird LCG Project Leader WLCG Collaboration Issues WLCG Collaboration Board 24 th April 2008.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
LHCb T2D sites A.Tsaregorodtsev, CPPM. Why T2D sites for LHCb  The T2D concept introduced in 2013  to allow non-T1 country sites to controbute storage.
Ian Bird GDB CERN, 9 th September Sept 2015
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Project Status Report Ian Bird Computing Resource Review Board 20 th April, 2010 CERN-RRB
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks John Gordon SA1 Face to Face CERN, June.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Data management demonstrators Ian Bird; WLCG MB 18 th January 2011.
Ian Bird LCG Project Leader Updating the Resource Planning for 2009/2010.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
WLCG Grid Deployment Board CERN, 14 May 2008 Storage Update Flavia Donno CERN/IT.
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 1 st March 2011 Visit of Dr Manuel Eduardo Baldeón.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
Ian Bird, CERN 1 st February Dec 2015
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
Top 5 Experiment Issues ExperimentALICEATLASCMSLHCb Issue #1xrootd- CASTOR2 functionality & performance Data Access from T1 MSS Issue.
Ian Bird LCG Project Leader Summary of EGI workshop.
Ian Bird LHCC Referees; CERN, 2 nd June 2015 June 2,
WLCG Accounting Task Force Introduction Julia Andreeva CERN 9 th of June,
Ian Bird, CERN WLCG Project Leader Amsterdam, 24 th January 2012.
T0-T1 Networking Meeting 16th June Meeting
Evolution of storage and data management
Ian Bird GDB Meeting CERN 9 September 2003
Project Status Report Computing Resource Review Board Ian Bird
Update on Plan for KISTI-GSDC
Proposal for obtaining installed capacity
The LHC Computing Grid Visit of Her Royal Highness
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
Project Status Report Computing Resource Review Board Ian Bird
Presentation transcript:

Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012

There have been several discussions of new proposals for additional Tier 1 sites – Korea (KISTI) for ALICE – Russia (Kurchatov Inst + Dubna) – all experiments – Mexico (UNAM) – ALICE – India (?) – ALICE, CMS First discussion on process held in CB last year Draft process documented – for discussion/agreement here Background

Pre-requisite is that any such proposal must be supported by the experiment(s) Balance between encouragement of new sites/resources and reaching high standards of existing Tier 1 services Process:  Prepare with MB a detailed plan that shows how the site will demonstrate required functionality, performance, reliability; timeline and milestones  Present plan to OB: OB recommends acceptance (or not)  Site can sign MoU as a candidate (provisional?) Tier 1  MB monitors progress on ramp up, reports to OB  When milestones achieved as agreed by MB, final report to OB to recommend full Tier 1 status Process

Most elements are described in the MoU addenda Candidate site must achieve MoU requirements in terms of – Level and performance of resources – see next – Quality and reliability of services: Set of services agreed with the experiments Provide agreed levels of support – as in MoU. Typically on-call support year round Availability and reliability: install agreed sensors, publish to WLCG monthly (as all other sites) Interface to WLCG accounting, provide accounting data to be published monthly Support for Tier 2s – in agreement with experiments. Data source and technical support for Tier 2s Requirements

Networking: – Eventually 10 Gb/s (+ alternate) as part of OPN for T0-T1 or T1-T1 – Proposal should describe how connectivity provided during prototyping, and the plan to achieve connecting to the OPN – Tier 2 connectivity via academic networks. Tier 1 normally expected to have good connectivity. Practical needs to be agreed with experiment(s) – as part of the usage model. Plan should describe this. Resources - 1

Must provide tape archive service. – Capacity needed for share of raw + other data – Must guarantee archive for life of the experiment – Specified in MoU Must show capability of accepting agreed share of raw data and writing it to tape at agreed rate – Plan should detail what this is Disk & CPU of significant fraction of experiment requirement – Typically ~10% (minimum 5%) of requirements expressed to RRB – Must be balanced with adequate internal networking to support expected workloads Resources - 2

Would a new Tier 1 imply existing Tier 1s could reduce their pledges? – Hopefully not: the goal is to increase resources Do new centres encourage experiments to increase requirements? – New centres help to fulfill needs – existing and desired NB we have added several Tier 2s without any discussion, or asking of these questions Questions raised

Does the OB agree to the process? Any additional details that should be specified in the proposals? Should we set a time limit? – i.e. to avoid a provisional Tier 1 never achieving the goal Requests: – KISTI now, Russia at next OB (tbd) – Mexico, India (tbd) Summary