SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) NA2: TA system Monitoring.

Slides:



Advertisements
Similar presentations
ECOOP Data Management System (T2.2/WP2) Declan Dunne 13 th February 2008, Athens.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
EMODNet Lot 4 - Chemistry Overview, management and administrative issues Alessandra Giorgetti (OGS) with the contribution of Altenburger Alessandro, Brosich.
SeaDataNet A Pan-European Infrastructure for Ocean and Marine Data Management First Training Session – Ostende February Catherine Maillard.
Workpackage 0 (WP0): Management of project
11 MEDATLAS 2002: database and data management system for the long term monitoring of Mediterranean and Black seas EC-MAST Concerted Action (MAS3-CT /ERBIC20-CT
ESS VIP project on Validation
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Development plan and quality plan for your Project
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
NA8 Dissemination in SeaDataNet  Demonstrate the data, products and services of SeaDataNet infrastructure  promote them among potential users and data.
Status Report External Communication Task Group Eric Zimmerman Antwerp, BE, 12 May 2004 This presentation will probably involve audience discussion, which.
The MyOcean Concept P.Bahurel, project coordinator.
2-6th June 2003 WP6 MAMA project WWW WP6 MAMA WWW 4 rd MAMA Meeting ROME, 3-6th June 2003 IFREMER coordinator Responsible
7 th TTG meeting – Trieste – 3-4 March, 2015 SeaDataNet tools, new developments IFREMER : M. Fichaut, A. Briand, M. Larour, T. Loubrieu, V. Tosello ALTRAN.
MERSEA Remote – Sensing Ocean Portal Brest Nov 2005 WP2.6 - DIP2 Project Status < Observing Systems < Remote Sensing.
-III Outlook How To Topics CS-3505 Outlook form Office 2003 Wb_ -II.ppt.
Needs for Data and Information Managing living and non-living resources, monitoring environmental changes in the sea and protecting the marine environment,
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
EU/MAST-MATER database ( ): A reference database of high quality multidisciplinary data collected within the framework of a major international.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Task 1. Project management and executive planning of activities Задание 1. Управление проектом и планирование выполнения работ М.А. Коробейникова Marina.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
SEADATANET Kick-Off Meeting Heraklion 8-10 June 2006 National Institute of Geophisics and Volcanology, Italy (INGV) SEADATANET Joint Reasearch Activities.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Processus de Rabat / Rabat Process Session 4: Monitoring the Roadmap of the Dakar Strategy MEETING ON THE STRENGTHENING OF POLITICAL DECISION-MAKING BASED.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
IODE Ocean Data Portal - ODP  The objective of the IODE Ocean Data Portal (ODP) is to facilitate and promote the exchange and dissemination of marine.
OBSERVATIONS & PRÉVISIONS CÔTIÈRES SeaDataNet annual meeting, Madrid, March 2009 How to prepare data for integration in SeaDataNet.
COGAIN Kick-Off Tampere, Finland WP 9: Management Stina Boedeker
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Speaker I Organism I adresse mail GA & BPW I Heraklion I Crete – Greece WP 1: A common stategy P. Morin, D. Durand, P. Farcy and.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Welcome to SeaDataNet Technical Task Team Meeting + a few basic questions that the co-ordinator expects to get a preliminary answer before the Kick-Off.
Task 2.1: Software Specifications Markus Kissler-Patig.
Tinus Pulles & Justin Goodwin Guidebook Revision Elements for a Maintenance Plan Consultants view.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
4.5 Perform Integrated Change Control
1 1 Arctic and North Seas Products Coordinated by IMR P17, Helge Sagen JRA 8.
EMODNET Preparatory Actions Progress meeting for ur-EMODNET preparatory actions, 24 November 2009 Presentation of Progress Chemical Lot Alessandra Giorgetti.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
Research and Innovation REPORTING and PAYMENT (in practice) v
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Data management dedicated for assessing and modeling of the Mediterranean and Black Seas ecosystem changes (SESAME integrated project). Isaac Gertman,
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
1 SeaDataNet Project Kick-off Meeting Training and Capacity building Vladimir Vladymyrov IOC Project Office for IODE Peter Pissierssens IOC/IODE Greece,
Metadata V1 By Dick M.A. Schaap – technical coordinator Oostende, June 08.
Reiner Schlitzer Alfred Wegener Institute for Polar and Marine Research Data Quality Control and Visualization with Ocean Data View 4.
Reiner Schlitzer Alfred Wegener Institute for Polar and Marine Research Ocean Data View and itsRole in SeaDatanet and its Role in SeaDatanet.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Validation of Metadata XML files SeaDataNet Training, June 2008 Presented by with contributions from Karen Vickers (BODC) Presented by Michèle Fichaut.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) SeaDataNet Overview and.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
BENCH-CAN Coordination
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
WP6. Quality Plan 6.2 Develop a monitoring, evaluation, and quality plan Edited by September, 2017.
DataGrid Quality Assurance
OCTOPUS – SeaDataNet Format conversion tool
Flanders Marine Institute (VLIZ)
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
REPORTING and PAYMENT (in practice)
Jennifer Stradtman, Director, Technical Barriers to Trade
BioMedBridges – Work Packages 2 & 12
Data Migration Assessment Jump Start – Engagement Kickoff
AMICI WP1 – Management, coordination and dissemination
Presentation transcript:

SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) NA2: TA system Monitoring Data Flow from TAs for remote Data Access and Products Catherine Maillard, Michèle Fichaut, Gilbert Maudire Kick-Off Meeting, June , Heraklion, Greece

SeaDataNet 2 Kick-off Meeting June , Heraklion, Greece Objective of the tasks Management of the TA system: organization, monitoring,control and assisytance from the project office  Ensure that each functional element of the system is working according to the specifications  Assess the overall data/meta-data/products availability  Undertacke/anticipate actions to solve any problem

SeaDataNet 3 Kick-off Meeting June , Heraklion, Greece Description of work Tasks:  NA2.1 : coordination and organization of the system control procedures (access rights, control of the system elements availability, log book, risk assessment)  NA2.2: implementation of the system control procedures and following up of the log book -> automatic continuous controls after delivery of JRA2 system Milestone : V1 available February 2008  NA2.3: Control of the coherency of the data exchanged in the system and their conformity with the QC protocol (including the checks for duplicates)  NA2.4 : Help Desk with , web site for dissemination of common software and documentation Participants  All TA data platforms + IOC and ICES for the control of data availability and tests

SeaDataNet 4 Kick-off Meeting June , Heraklion, Greece NA2.3: example of Data Flow for products preparation (From MEDAR/MEDATLAS, M. Fichaut)

SeaDataNet 5 Kick-off Meeting June , Heraklion, Greece NA2 Deliverables for the first 18 months DeliverableForeseen delivery date Responsibles Draft of system organization Oct 2006P1 + Steering Committee Benchmark data sets extracted from the system (BMD1) Oct 2006All TA leaders System organization scheme and log book validated (V0) Feb 2007P1 + Coordination Group Contribution to First Annual Meeting and report Feb 2007P1 + TA Benchmark data sets extracted from the system (BMD2) Aug 2007All TA leaders

SeaDataNet 6 Kick-off Meeting June , Heraklion, Greece NA2.4: Assistance and Help Desk provided by SeaDatanet Project office Mailing lists Disk space to disseminate/share documentation and software:  BSCW site for working documents and software: With read and write permission Opened to partners and authorised persons (advisers) only  Web site for published documents: Private directories for contractual documents Public directories for publications, ppt presentations etc..  ftp site for inport and export data, products etc.. User desk contact:

SeaDataNet 7 Kick-off Meeting June , Heraklion, Greece Software tools already available Medatlas translator to  ODV import format  Argo NetCDF Java code, portable on Unix, Windows platforms On BSCW soon (aslo here with Michèle)

SeaDataNet 8 Kick-off Meeting June , Heraklion, Greece Mailing lists

SeaDataNet 9 Kick-off Meeting June , Heraklion, Greece Website

SeaDataNet 10 Kick-off Meeting June , Heraklion, Greece TA Link

SeaDataNet 11 Kick-off Meeting June , Heraklion, Greece Brest Project Office