Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.

Slides:



Advertisements
Similar presentations
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Advertisements

Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
Update of achievable beam characteristics at injection in LHC H.Bartosik, C.Bracco, O.Brüning, C.Carli, K.Cornelis, H.Damerau, R.Garoby, S.Gilardoni, B.Goddard,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Plans for ions in the injector complex D
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
FCC-ee: coupling impedances and collective effects
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Introduction to LHC beam production in PSB and PS
Sunday/Monday & :30 Stable beams. Fill #1851.
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
Generation of Higher Brightness Beams for LHC
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
Collective effects in the SPS and LHC (longitudinal plane)
CERN-SPS horizontal instability
Summary of session 9: "LHC Injectors Upgrade"
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Presentation transcript:

Some ideas for/from the SPS LIU-SPS team

Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages compared to aC coating, in terms of work, risk, radiation, vacuum,... –and we have to make scrubbing work for LHC Some “exotic” ideas for scrubbing (JMJ, GA, BG, KC, ES) – some maybe also interesting for LHC –Filling SPS, with 8 batches of 25 ns beam, at 26 GeV/c –5 ns spacing for scrubbing with high (nominal?) bunch intensity –“Slip-scrubbing”, using longitudinal displacement as proposed for bunch merging to sample all bunch spacings (but maybe poor duty cycle), or recapture to give 5+20 or ns spacing –Deliberate deregulation of PS splitting to increase odd-even bunch intensity modulation, and enhance ecloud –Deliberate presence of 5-10% of uncaptured beam, seen in past to enhance ecloud effect Many potential issues for the different ideas... Filter, then simulations and MD of most promising ideas Deadlines for aC coating decision...

longitudinal transfer SPS -> LHC? Longer bunches at transfer? –Need to blow up longitudinal emittance in SPS to overcome longitudinal coupled bunch instabilities –Also expect longer bunches at transfer for low gamma T optics Increases capture losses in LHC - what are allowable limits? –Determined by injection losses and beam loss on collimators at start of ramp Should consider all mitigation measures –Abort gap/injection cleaning –Injection BLM sunglasses –BLM thresholds and shielding May be possible to significantly increase present limits, (although anyway with 25 ns some degradation is expected) Other routes? –400 MHz in SPS or buncher cavities in TLs do not seem feasible. –200 MHz in LHC? –Bunch by bunch longitudinal damper in SPS/LHC? –Identification and removal of impedance sources?

Other ideas? Bunch merging in SPS/LHC: if limited by single bunch intensity at 26 GeV/c or injectors for 50 ns (Elena) Different working points; mitigate resonance crossing from space charge/eCloud – being studied in context of Q20 optics, plus Q26 (Hannes/Yannis/Benoit) Low gamma T (as a universal panacea): increase instability thresholds...still many issues to address (multibunch, RF volts, longitudinal transfer to LHC,...) (Hannes/Yannis) Alternative filling patterns for LHC if limited by total SPS current: e.g. 3 batches with 4/3 bunch intensity gives ~60% better luminosity in LHC, assuming 2592b can be injected c.f. 2808

reserve

RF power (beam loading). Total SPS intensity to between 2.2 and 2.9 A (1.7 – 2.3 e11 for 25ns, e11 for 50 ns). This performance available after 2018 LS2 eCloud: badly affects 25 ns beam With mitigation hope to remove effect for “much higher” 25 ns bunch intensities (value?). For 50 ns beam should be possible to scrub with 25 ns and not be limited (signal x10 lower for same bunch intensity). HBW FB to combat eCloud instability, but not incoherent emittance growth (is this well understoof in simulation?) TMCI: 1.6e11 for Q26 and 3e11 for Q20 (~zero Q’). Other mitigation includes HBW FB and higher chromaticity (plus ongoing impedance effort) Emittance/intensity Q26 assumed to be  [um] ≈ 2  N[e11] – measured only with Q20 optics: find  [um] ≈ 0.8  N[e11]. Would imply 1.6 um for 2e11 per bunch, or 2.7 um for 3.5 e11 Heating of MKE kickers: should be “cured” after LS1. Other mitigation includes running with lower duty cycle LHC beam except for LHC filling Longitudinal coupled bunch instability (onset 2e10 p+/b) requires 800 MHz system for Landau damping, plus controlled emittance blowup through cycle. Very delicate – not obvious that larger emittance can improve. May improve with Q20 but needs more voltage. Could be important limitation – 200 MHz in LHC, or HBW long damper in LHC. Known SPS limitations

2011 news from MD Nominal 25 ns beam 4 batches accelerated to 450 GeV with low losses and about 1.15e11, 2.5 – 2.8 um. Latest MD results without strong indications of eCloud – WS results checked since and confirmed. DB 50 ns accelerated to 450 GeV, 1.6e11 p+/b and 2 um, 4 batches, low capture losses (3%) - eCloud seen (<25 ns). SB 50 ns single batch for comparison, 450 GeV, 1.45e11 p+/b, 3 um, low capture losses (3%). Some limitations from (un-serigraphed) MKE heating for 25 ns beam 50% duty cycle. No major issues with ZS. Q20 single bunch accelerated to 450 GeV, for 3e11 p+, 2 um (limited by PSB), losses <10 % and longitudinal instability above 2.5e11. Emittance/intensity limit with Q20, in range 1-3e11 of  [um] ≈ 0.8  N[e11] (not including effect of bunch lengthening). SPS contribution? eCloud: suppression with clearing electrode demonstrated (as for aC), but increased eCloud seen with 50 ns double batch (ultimate current)