Harbor Center Project. Condition 1.a Bayside Accessway The entire southern portion of the bayside lateral accessway shall be a minimum of ten feet wide.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

7 | Means of Egress (Life Safety Code)
Southern California Eelgrass Mitigation Policy NMFS, USFWS, and CDFG (1991) Effective compensation for impacts (90% success) Basis for consistent recommendations.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
The Effect of Observing Environment on Temperature in North China Plain Area Jianxia Guo 1, Xin Li 2 1. Meteorological Observation Center of CMA, Beijing,
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
Sandbagging Techniques
IHSA New Administrators’ Workshop Attendance Scholastic Standing Coaches Certification Tournament Assignments.
Stairways & Ladders
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
1 FUME HOOD SAFETY Environmental Energy Technologies Division Safety Topic July 12, 2012.
Appendix K Phase 2 HGB Mid Course Review Average Minimum and Maximum Temperatures from at 9 Weather Stations in East Texas and West Louisiana.
1.  Falls are the leading cause of death in construction  Falls from as little as 4 to 6 feet can cause serious lost-time accidents and sometimes death.
February 2007 Commercial Vehicle Drivers Hours of Service Module 10: Oil Well Service Vehicle Permits.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
Kitsap County Shoreline Master Program Update Task Force Work Group Meeting August 16, 2011.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Isles of Lake Hancock Homeowners Association, Inc. District 1 July 28, 2015.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
Fisheries and Oceans Canada Fish Habitat Management Program Intervention to the Nunavut Water Board on the Doris North Gold Project Cambridge Bay August.
Student XXX BCT 480 Hazard Recognition Site Report November 15, 2004
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
Bricke Murfree Murfree & Murfree, PLLC Attorneys-at-Law 805 South Church St., Suite 21, Murfreesboro, TN Phone:
FEBRUARY 21, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPELLANT/APPLICANT: CHANTEL PRESTON.
And other issues. The General Contract Form is included in every solicitation requiring insurance. The general requirements of the contract.
Standing TSA/Addendum Process Importance of TSAs Why are TSAs important? – Planning safety into the job minimizes surprises and slow downs, thereby improving.
LECTURER’S EMPLOYEE ORGANIZATION (LEO) REVIEW PROCESS.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Longitude and Time.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Josephine Axt, Ph.D. Chief, Planning Division Los Angeles District July 10, 2013.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Another important habitat within the City of Newport Beach is coastal sage scrub (CSS). Although CSS has suffered enormous losses in California (estimates.
Commission Procedures The Evolution Presented to the California Fish and Game Commission by Commission Staff on February 11, 2015.
Excellent Public Schools Act of 2013 Instructional Collaboration Day II January 3, 2014.
(ConocoPhillips Company, San Luis Obispo County) Slide 1 Project Location.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Mayor’s Office on Disability City and County of San Francisco Discussion of Common Design and Construction Errors.
CALIFORNIA COASTAL COMMISSION HEARING JUNE 12, 2013 ITEM W17A A-6-PSD SUNROAD ENTERPRISES EAST HARBOR ISLAND, SAN DIEGO Reuben E. Lee (REL) Restaurant.
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
Starling of Palm Coast Assisted Living Facility Tier 2 - Technical Site Plan Review PLDRB Hearing on March 16, 2016.
SECTION 8 - RACKING (BRACING) AND SHEAR FORCES STUDENT HANDOUT
Public Access No public access currently available through site due to site constraints, including steep topography.
OSHA’s NEW Walking-Working Surfaces 1910
Stairways & Ladders
OSHA’s NEW Walking-Working Surfaces
Youth Employment Laws.
Fumigation Updates Presented by: Blanca Enriquez-Pratt
Stairways & Ladders
Stairways & Ladders
Subpart M Fall Protection.
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
Facilities Maintenance Extension
EFFORT REPORTING TRAINING
Assembly District Election Meeting Training
2019 Governor’s Cup PRESHIFT CONTEST Roof Control Plan
Section 8: SIGNS.
Presentation transcript:

Harbor Center Project

Condition 1.a Bayside Accessway The entire southern portion of the bayside lateral accessway shall be a minimum of ten feet wide with the exception of eight feet wide noted on the plans at the mid section of the project.

Condition 1.b Shading of eelgrass No part of any bayside lateral accessway, floating dock, other structure, or boat docking area shall be located vertically above any existing eelgrass bed, or portion thereof, as identified on the Applicant’s Site Plan.

Condition 1.c Pre- and Post-construction surveys …no earlier than days and no later than 30 days prior to the commencement of construction. The survey shall be submitted to the Executive Director. for review as part of the final plans. If additional eelgrass is identified that would be directly shaded by the proposed project, then the report shall identify remedial measures to offset such reduction within the eelgrass beds at a ratio of 1.2:1 in line with the specifications for mitigation of eelgrass habitat as provided for in the Southern California Eelgrass Mitigation Policy.

Condition 1.c Pre- and Post-construction surveys Annual reporting shall continue for at least three two years. or until all eelgrass beds to be protected are supporting eelgrass as documented in two consecutive annual reports, whichever is later.

Condition 1.d Building heights The top of the awnings shall be no more than 14 feet in height. The façade improvements shall not increase in height beyond the existing building height.

Condition 2.c Floating Dock Signs discouraging the public from walking on the docks during daylight hours are prohibited.

Condition 2.c Floating Dock The gate may have a latch, but shall be open to the general public during at least daylights hours (i.e., one hour before sunrise to one hour after sunset). A sign informing the public of coastal access, including times, shall be located on the bayside lateral accessway side of any installed gate. Any and all other barriers to walking on the gangway or dock, such as ropes or gates, are prohibited.