AUTOMATIC DAM WATER LEVEL CONTROLLER USING BELLOWS VALVE PROJECT TEAM.

Slides:



Advertisements
Similar presentations
Pneumatic Principles.
Advertisements

Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
BRYAN YOUNG Preventative Maintenance Working With Safety.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee February 8, Performance Report William.
January 6. January 7 January 8 January 9 January 10.
Moonbuggy Rear Suspension Analysis ME450: Computer-Aided Engineering Analysis Department of Mechanical Engineering, IUPUI Instructor: Dr. Koshrow Nematollahi.
Their Strengths and Limitations. 1. Practically – available for free 2. More detail as there are more categories of crime than with the British Crime.
1984 National OSHA Record 6486 accidents. 516 injuries. 90 deaths.
Drawing of the Insurance Process tom bakos consulting, inc. ©2004.
PORTABLE GENERATOR Dimensions: 25.88” x 21.13” x 24.75” Weight: 147 lbs. UPC: *AS RATED BY ENGINE MANUFACTURER MODEL: PM ©2007 POWERMATE.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Jessie Holderman Beth Madsen Adam Oster. Agenda Project learning Specifications Axiomatic design Comparisons Proposed designs Questions Source:
2 3 Common methods used to identify hazards include:  Workplace inspection  Process or task analysis  Review and analysis of past workplace accidents.
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
TWO WHEELER SELF SIDE STAND
TRAINING MODULE FOR CAR RESERVATION PROGRAM VERSION CREATED FOR NORTH ARKANSAS COLLEGE (FOR INTERNAL USE ONLY) THIS IS AN AUTOMATED SLIDE SHOW AND.
OVERVIEW May 26, Overview Automate the performance management and compensation processes Integrate employee data between
Patrick Lazar, Tausif Shaikh, Johanna Thomas, Kaleel Mahmood
Chapter 17 Preview Section 1 Electric Charge and Static Electricity
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
By the end of this chapter, you should:  Understand the properties of an engineering requirement and know how to develop well-formed requirements that.
ELECTRICITY. Electric Current  Currents are the rate that electricity flows thru a wire  2 types of currents:  Alternating Current (AC) electricity.
Batthyány Lajos Grammar School, Nagykanizsa “The kind of thinking that has got us into this situation is not the kind of thinking that will.
Proposal for Geodatabase on 5 Mile Dam Soccer Complex Daniel Cohen – Project Manager Samuel Boesch – Assistant Manager Mathew Riggan – GIS Consultant.
Registering a systematic review on PROSPERO. PROSPERO: International prospective register of systematic reviews Web based Free to register Free to search.
Refrigeration Plant Design – Progress Report 1 Kevin W. Hunter MANE-6980 Engineering Projects.
Unit 4: Women and Water Module: Environmental Justice and Freshwater Resources.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
ORENDA AEROSPACE CORPORATION PROGRESS REVIEW MEETING THE CANADIAN HARD CHROME ALTERNATIVES TEAM (HCAT) JOINT PROGRAM HVOF PROCESS DEVELOPMENT, EVALUATION.
ENTC-370PROF. ALVARADO1 Fluid Mechanics LAB: Actuator Constructions and Component Identification.
Environmental Health Community Survey Results. EH Survey Statistics Total surveys = 23 ◦ Collected at Tribal Earth Day 2008.
Oak Communities by A. G.. Introduction Have you ever heard of an oak community? An oak community is like a small village. It consists of one or several.
A UTOMATIC DRUNKEN DRIVER AND DROWSINESS DETECTION SYSTEM Student’s Name with USN No. Guide Name HOD Name College Name, Dept.
Newmont’s Safety Journey. Behaviors Systems Involvement.
1. INTRODUCTION 2. CONCENTRATED SOLAR POWER 3. PARABOLIC TROUGH 4. SOLAR PANELS 5. PHOTOVOLTAICS 6. PV SYSTEM 7. ADVANTAGES & DISADVANTAGES 8. STORAGE.
SunSatFriThursWedTuesMon January
Progress presentation
That’s Nice! But it is not Maintenance Excellence. Life Cycle Engineering The Nation’s Premier Provider of Maintenance Solutions.
Dream Team Project Selection 1st Inertia Magnetic Induction Charging System Most of us have seen the flash lights that are powered by shaking them a few.
Presentation Title Presented by Joe Blow Industrial Purge Valve Training.
07 December 2011 Faronics UK Green IT Survey. Would you consider yourselves to be a 'green' organisation in terms of IT efficiency?
CODES FOR VESSELS/HEAT EXCHANGERS Avinash Nayak. (46) Shrikantkumar Padhy (47) Jitendra Patil (48) Manoj Patil (49) Ganeshprasad Pavaskar (51)
Lead Pipe Disposal. Overview Background and Project Requirements Top 5 Designs Detailed Final Design Social and Environmental Factors Testing of Design.
Ag Engineering I UNIT C: SAFE WORK PRACTICES A. Safety Color Codes 1. Green – safety equipment and first aid supplies 2. Red – fire safety equipment.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Effect of Altitude Related Parameters on Wear Rates in Common Aerospace Materials December 15, 2009.
Fluid Power Systems And Fundamentals
Types of Bronze alloys Super Metal Industries
Safety Department Fire Drills.
The World Bank Land and Poverty Conference is glad to welcome poster session presenters. You have been selected by the land conference team to present.
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Safety Measures in Super Power and High Power Transmitters in
Friction Welding Welding Technology/ 3.5 Friction Welding.
Audio Recording on Access Vehicles
DID YOU KNOW DRIVING A VEHICLE IS ONE OF THE MOST POTENTIALLY DANGEROUS THINGS YOU DO ON A DAILY BASIS. Avoid hazards by checking your vehicle before.
Welcome.
WELCOME.
Soldering Iron Project ELEC163
مناهــــج البحث العلمي
A 6 mm cable with a length of 15 m has been installed
Audio Recording on Access Vehicles
RV Safety Alarms Education Test LP Gas Alarms / Detectors
Upcoming Title III Events
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
AUTOMATIC VEHICLE CHECKING SYSTEM
ME Session #5 Selection of term projects
Business Services Update Board of Education Workshop December 6, 2016
Actuators Chapter 17 Lesson 5.
Pulling Your Shades.
Presentation transcript:

AUTOMATIC DAM WATER LEVEL CONTROLLER USING BELLOWS VALVE PROJECT TEAM

The objective of this project is to control the water level in dam using bellows valve. If water level increases the desired level then it will valve open. If it decreases the desired level then it should turn off the valve automatically.in this project automatic dam control using bellows valve

INTRODUCTION NEED FOR AUTOMATION : Nowadays almost all the automobile vehicle is being atomized in order to product the human being. The automobile vehicle is being atomized for the following reasons.

 To achieve high safety  To reduce man power  To increase the efficiency of the vehicle  To reduce the work load  To reduce the vehicle accident  To reduce the fatigue of workers  To high responsibility  Less Maintenance cost

commons.wikimedia.org Dam_with_water.jpg

BigDam(E).gif ibrary.thinkquest.or g

LITRATURE SURVEY ^^ Ramakrishnan, Uma; Santosh, J. A. ; Ramakrishnan, Uma & Sukumar, R. (25 January 1998). "The population and conservation status of Asian elephants in the Periyar Tiger Reserve, Southern India ^^ Mathew, R.O.Y. (7 December 2011 The hidden control defines a hidden field and is rarely used. No field is rendered in the dialog and the control itself does not have any properties of its own. The only relevant generic property is defaultValue.

Cast steel PM 25 to ANSI 300 – 1/2 to 12 inches Straight-through or Y-pattern design Easy operating handwheel with safe operation at all working temperatures Energy-saving bell of chrome nickel steel with air cushion between bell and housing Bellows of chrome-nickel steel

Working progress: December :we have select the project title January: Materials collecting February: Abstract,project details collecting through internet March: Record work and fabrication will be submitted.

battery Sensing unit Dam Bellows valveExit

Approximate details s.nopartsquantity 1Bellows valve1 2Sensing unit1 3Dc battery1 4Aluminum rod2

Purchasing details S.NoDatePartsQuantity 13/1/2012Aluminum rod2 226/1/2012Dc battery1 310/2/2012Sensing unit1