M. Takahashi, 21 January, 2016 Station Acceptance (SA)

Slides:



Advertisements
Similar presentations
inFire HTC speed Furnace Webinar
Advertisements

Heavy Concrete Construction Formwork
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Installation. Indoor Unit Installation Typical Installation.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
Power supplies  Will need power supplies to power :  APDs  PMs  Silicon PMs  Signal amplifiers.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Next Act Wall: 3 Different Panels All wood is 2x4 unless otherwise specified.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Cable Feed Thru Proposal William Sands May 11, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
CONSTRUCTING A FIVE CABIN LATRINE
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
21/07/20061 Preparation of Station Acceptance Rig.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
Testing the possibility of detecting the light emitted by the PPS.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
Pouch Stacker & Boxer DR Mark Smith October 8,
T. Matsushita 1 Waveguide length with 3D model Internal waveguides The shortest = 1.5 m The longest = 2.6 m Others depending on the spacing Front face.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
BM&N STS ladders assembly in VLHEP
Preparation for Station Acceptance Test
Test box for ProtoDUNE SP – Integration Test
Teacher training resource: Robotic Assembly
Visit for more Learning Resources
ADAGIO.
What is Work? Chapter 4.
Physics 109 Lab Room 3124 Chamberlin Hall Power Outlet Configuration
Plan The next question would be ... but how do we get the drawings from the 3D object? This will be explained over the next few pages. Take a look at.
Teacher training resource: Robotic Assembly
Testbeam status report
Presentation transcript:

M. Takahashi, 21 January, 2016 Station Acceptance (SA)

11/05/2006 Imperial College London 2 Space Source X-Y stage Station and source holders Light-tight box with patch panel waveguides, connectors (Readout and DAQ System) What we need

11/05/2006 Imperial College London 3 Station acceptance (SA) test carried out at Imperial College Rm537 (former CMS crystal lab) –allocated for MICE –still needs to be cleared out… (some CMS crystal-related things will be removed shortly, so there will be enough space for TA test) Basement –enough space but people from other experiments would enter The apparatus will sit on top of a table for easy access At least one yellow light in the room over the light-tight box Space

11/05/2006 Imperial College London 4 Sketch of SA Setup patch panel to controller to VLPC garage position station holder + jig Station remains at a fixed position defined by the jig Source held by an extended arm firmly attached to the X-Y stage … scan across the station from the top surface stage

11/05/2006 Imperial College London 5 Radioactive sources at Imperial HEP (consultation with Mark Raymond) Co-60 (~1MeV) –available but not recommended… –the stage and the source holder have to support the shield  would have to go for strength rather than precision Co-57 (122keV) –would be ok but not enough activities (months to arrive if we order) Am-241 (60keV) –sufficient supply Source

11/05/2006 Imperial College London 6 Programmable X-Y stage to move the source across the station plane (with flexibility for other future purposes) Stage –strength or precision? (because the source will be held on an extended arm, the stage needs to survive a large enough torque) Supplementaries: –motor –controller –linear encoder? (measures the actual position) Cost: stage+ motor + linear encoder + controller ~2k x 2+ ? + ~500 x 2+ ~1k = 7k GBP (better estimate due to arrive in few days) It will take 2,3 months to arrive X-Y Stage

11/05/2006 Imperial College London 7 Station & Source Holders station holder + jig stage Jig + holder for the station similar to those used for the assembly jig bolted onto the base of the light box Holder for the source arm + leg firmly attached to the stage hold source ~few cm above doublet layers ~40cm ~20cm adjustable  ~5cm source holder ~5cm

11/05/2006 Imperial College London 8 Light box (needs to be ordered) >= 70cm(d) x 130cm(w) x 60cm(h) (doors on the front face) Heavy base with bolt holes Holes on the side walls –for patch panel: ~15cm x 25cm –for the stage controller cables: ~ Ø10cm with some kind of light seal Patch panel Light-tight Box and Patch Panel actual hole on the box bolt connector holes O-ring type sealing? light box front face

11/05/2006 Imperial College London 9 Internal waveguides –lengths: same for all for simplicity and flexibility 1m –connections to the station: probably better to connect them outside the light box (station held at 20cm, connectors still reachable if necessary) External waveguides ~1m Waveguides

11/05/2006 Imperial College London 10 Discuss if the plan is good enough and feasible + finalise the details Which source and stage?  place an order Reference measurement for the source Position survey system (doing this from data is enough?) Independent measurement of the station position/orientation with respect to the source To Do

M. Takahashi, 21 January, 2016 END