Ship Sheets Overview Gordon Rizor September 1, 2015.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Preparation of the Self-Study and Documentation
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Surface Maintenance Engineering Planning Program
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
NOTE This file contains the PowerPoint presentation for the significant changes to the JFMM with the exception of the Nuclear Addendum section (Part II.
Surface Ship Sustainment
Distribution Statement A : Approved For Public Release; Distribution is unlimited 1 A testcase framework for the PLCS-IF Ben Kassel Naval Surface Warfare.
ASSIST: Next Generation Making a New ASSIST a Reality CIAC Conference - San Diego, CA April 22 and 23, 2010 Shawn Brick, Glenn Dunkle, Bob Quinn.
Jim White, PMW 240T September 2012
November Northrop Grumman Ship Systems 14th annual International Integrated Program Management Conference Washington D.C.
Trademark Fee Cost Analysis TPAC Briefing June 9, 2009.
Project Execution.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
This file contains the PowerPoint presentation for the significant changes to the JFMM. It has been designed to work with a Word document file that provides.
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
Personal Property Training Webinar Untimely Notifications PPMB Found Certification Fair Market Value Loan Agreement Creating Vehicle Agreement Asset User.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
ODADAS/DMH Consolidation: State and Local Relationship Items Meeting #1 August 13, 2012.
D.R.E.A.M Task Force Distributed Resource Energy/Ancillary Market Task Force August 2015 Meeting.
This file contains the PowerPoint presentation for the significant changes to the JFMM applicable to all Volumes with the exception of the Nuclear Addendum.
1 Defense Technology Cluster June 27, DTC Meeting – 6/27/2006 □ Introductions □ DTC Activities  TCATS Package Status  SATAI Cluster Meeting.
Naval Sea Logistics Center (NSLC)
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Mega Rust 25 June 2015 RDML Larry Creevy
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Presented by: Don Lehner NAVSEA TMDE Program Fleet Review May 2009 CNSL Consolidated TMDE Readiness Assessment (CTRA)
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
DCAMS Simple Casualty Knowledge Management
Board of Inspection and Survey 1 RDML Mike Smith President, Board of Inspection and Survey (PRESINSURV) 25 June 2015 Mega Rust 2015.
ASNE (Tidewater Section) INSURV Brief G. B. Sanford Deputy 21 SEP 05.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative IT Governance Subcommittee Working Session.
Next Generation ISEA Roadmap
IICWG VI Applied Science & Research Standing Committee Open Action Items for IICWG-7 Co-Chairs Lars-Anders & Breivik Dean Flett.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
A PRACTICAL APPROACH TO STRATEGIC PLANNING Mitch Everton Saturday, November 23 4:15-5:30.
Surface Ship Maintenance and Modernization
UNCLASSIFIED – FOR OFFICIAL USE ONLY 1 NFOSES Wednesday, 1 October U.S. Naval Academy Agenda and Desired Effects Community Break Out Sessions.
Surface Maintenance Engineering Planning Program Update
ASNE Dinner Brief RDML Bill Galinis 26 February 2014.
DOD STANDARDIZATION CONFERENCE
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
USS PAUL HAMILTON FY 16 Extended Dry-Docking Selected Restricted Availability Dry Dock Availability Competition Area: Coast Wide – West Coast Rough Estimate.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
Personal Property Training Webinar Untimely Notifications PPMB Found Certification Fair Market Value Loan Agreement Creating Vehicle Agreement Asset User.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Surface Ship Maintenance and Modernization Contracting Strategy
SEA 05D Overview “Who We Are & What We Do” Eric Lind 14 Sep 2016
Cybersecure Machinery Control Systems and Networks Department Overview
Preparation of the Self-Study and Documentation
NOTE This file contains the PowerPoint presentation for the significant changes to the JFMM. It has been designed to work with a Word document file that.
Module 1 Configuration Status Accounting (CSA)
Project Integration Management
Proposed Revision of: NSTM 631 Rev
Cybersecure Machinery Control Systems and Networks Department Overview
Industry Day Brief Michael Zekas (Acting)
CEOS Work planning Steven Hosford, ESA/CNES, CEO
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) As of 9 Mar.
ST1 Maintenance & Modernization Summit
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Executive Project Kickoff
Cost Reduction of Shock Application Project Overview for NSRP Panel Meeting July 16, 2019 Kristi Carroll and John Walks.
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) As of 9 Mar.
Presentation transcript:

Ship Sheets Overview Gordon Rizor September 1, 2015

Agenda Requirement Overview Ship Sheet and Requirement Sheet Overview Ship Sheets Timeline POM 18 Takeaways - Ship-specific requirement for a specific availability at a point in time defined by a ship sheet. - Technical Foundation Paper (TFP) forms the basis for a ship sheet. - A ship sheet contains the following adjustments/considerations: Configuration differences/errata. (PCMS, Shafts) C+90 deferral from previous avail(s) SSEOC Review for condition-based repairs Maintenance Backlog (Tanks, corrosion, etc.) Operational & modernization schedule Applicable lessons learned - Duplicate requirements reconciled

Requirements Overview Ship-specific requirement for a specific availability at a point in time defined by a Ship Sheet. Technical Foundation Paper (TFP) forms the basis for Ship Sheets and the BAWP. A Ship Sheet contains the following adjustments/ considerations: Configuration differences/errata. (Passive Countermeasure Systems, Shafts) C+100 maintenance deferrals from previous avail(s) SSEOC Review (Tanks, corrosion, CSMP, etc.) TYCOM Alterations Program Alterations to support Duration Analysis Duplicate requirements reconciled Ship Sheet Requirement Total Availability Requirement Technical Foundation Paper Requirement - Ship-specific requirement for a specific availability at a point in time defined by a ship sheet. - Technical Foundation Paper (TFP) forms the basis for a ship sheet. - A ship sheet contains the following adjustments/considerations: Configuration differences/errata. (PCMS, Shafts) C+90 deferral from previous avail(s) SSEOC Review for condition-based repairs Maintenance Backlog (Tanks, corrosion, etc.) Operational & modernization schedule Applicable lessons learned Duplicate requirements reconciled What does errata mean? What is UNK backlog (RESET) What is CMP? Total depot-level requirement for a specific availability

Technical Foundation Paper TFP 36-9 O-FRP White Paper Notional Requirements documented in OPNAVLTR 4700

Ship Sheet & Requirement Sheet

Ship Sheet Overview Availability Information Programming Requirements Miscellaneous

Requirement Sheet Summary Job description with associated Man-Days organized by SWLIN. One Requirement Sheet per CNO avail

Ship Sheets Timeline

POM 18 POA&M # TASK DESCRIPTION RESPONSIBLE DATE 1 STAR Board Face to Face Review (REV “E") - DRAFT WLA SURFMEPP Complete 2 DoN 17 - Program Alteration Fielding Plans Final Provided to SURFMEPP – NLT PARMS 3 Availability Duration Scorecard – June SEA 21 / SURFMEPP 4 Finalize DoN 17 Integrated Workload Agreement (REV “F)/POM 18 Ship Sheet REV “0” 5 POM Surface Fleet Availability Scheduling Team (FAST) Kick Off FLEETS 6 Finalize POM 18 Ship Sheet Schedule FLEETS / SURFMEPP 7 POM 18 Kickoff at OPNAV OPNAV 8 OPNAV to provide POM 18 NSA list 9 Complete Surface FAST Rev 1 17-Aug-15 10 Kick-off TYCOM Reviews 11 Final DoN 17 / SEWMMP briefed to FM BoD / SEWMMC FLEETS/ OPNAV 12 Provide FAST / Ship Sheet (REV “A”) TYCOM 13 Finalize input from TYPE DESKS 31-Aug-15 14 STAR Board Telcon Update (REV “B”) 09-Sep-15 15 Re-rack DDG 51 Modernization fielding plan based on latest schedules SEA 21 16-Sep-15 16 Surface FAST Brief to FM BoD 20-Sep-15 17 Duration Analysis (Availability Duration Scorecard) SEA 21/ SURFMEPP 25-Sep-15 18 STAR Board Telcon Update (REV “B1”) 01-Oct-15 19 FAST: FMPMIS Availability Schedule for Modernization FLEETs 20 Update POM 18 Fleet MOD Input ISO REV "B2“ PARMS/ TYCOM 02-Oct-15 21 Program Alteration Fielding Plans Completed 22-Oct-15 22 STAR Board F2F Review (REV “B2”) 23 Ship Sheet submission to OPNAV via TYCOM / FLEETs (REV “C”) 29-Oct-15 24 POM 18 Final Data Due Date OPNAV N43 10-Nov-15 25 POM 18 Integrated Inputs to OPNAV (Maintenance & Modernization) (REV “D”) SURFMEPP/ PARMS 01-Dec-15 26 SEWMMC Review OPNAV N96 15-Dec-15 27 Update NDE with Maintenance/MOD Requirements (REV “E”) 31-Dec-15 28 Validate integrated model OPNAV N95 / N96 15-Jan-16 29 SPP 15-Feb-16

TYCOM Review Schedule If necessary: AFDL, DDG 1000 SHIP CLASS DATE TIME STATUS LCC 19 Monday, August 17 1700 – 1800 ET Resched: YOKO/SASEBO Review PC 1 Tuesday, August 18 0800 – 0900 ET Complete MCM 1 1000 – 1100 ET LCS 1/2 Wednesday, August 19 1300 – 1400 ET LHD 1/8 & LHA 6 Thursday, August 20 1400 – 1500 ET LPD 17 Tuesday, August 25 LSD 41/49 Wednesday, August 26 1100 – 1200 ET CG 47 DDG 51 Thursday, August 27 1300 – 1500 ET YOKO/SASEBO 1700 – 1830 ET If necessary: AFDL, DDG 1000 Follow-on meetings as necessary end of Sep/early Oct. Opportunity for TYCOM to review and provide feedback

SSEOC ITEM/FIELDING PLAN Fielding Plans CLASS OF SHIP SSEOC ITEM/FIELDING PLAN CG DDG DDG-1000 LCC-19 LCS LHA-6 LHD-1 LHD-8 LPD-17 LSD MCM PC CSMP X DEFERRALS CORCON TANKS AND VOIDS GTG RESILIENT MOUNTS   LPD-17 TASK FORCE LPD-17 ASW/FM VALVES MCM DIESELS SONAR CONNECTORIZATION PC CLASS DIESELS CG ACB 12 MK99 DDG BERPS SAB NUTS RUDDER BRNG ASSESSMENT RUDDER SEAL OVERHAUL DDG SHAFT BEARING CLEARANCES DDG SLAD HPAC OVERHAULS LPD FM CLEANING VENTILATION CLEANING DIESEL MAINTENANCE STRATEGY (MPDE/SSDG INSPECTION) DC 8010 PESC CORRECTION CG PCMS CORRECTION TOMODACHI RADCON BOILER STRENGTH AND INTEGRITY SUPPORT LUBE OIL HEATERS CLASS ADVISORY BELOW THE WATERLINE ASSESSMENTS LPD 17 BULWARK REMEDIATION LPD 17 CALEY BOAT DAVIT OVERHAUL LPD 17 VCHT CLEANING MAIN AND AUX CONDENSER EXPANSION JOINT REPLACEMENT STEAM VENTILATION ISEA ASSESSMENT

Takeaways POM 18 requirements being worked through end of end of September CSMP JCNs for DFS’s Estimates for JCNs JCNs screened to anticipated avails Deferred/Reprogrammed Work Identify work being deferred from current/upcoming avails Identify big ticket items or class wide issues for consideration

Questions?