Lithium Hydride Absorber Program C. M. Lei March 17, 2008.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Injection Molding MFG 355.
HEATING AND PLUMBING FEF
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Application of Steady-State Heat Transfer
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
LiH Absorber for MICE Alan Bross May 31, LiH Absorber in Cooling Channel  LiH absorbers are now the “baseline” for the initial 4D cooling u Replaced.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
1 AATC, Inc W. Catalina Dr. Phoenix, AZ USA AATC PRESENTATION – INVESTMENT CASTING PROCESS (2 OF 3 – PRESENTATIONS – REVISION.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Dr. G. Appa Rao Defence Metallurgical Research Laboratory
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
Design Progress Allen Ellis 18-September
June 12, 2003FDR Race Track Test Coil1 Final Design Review Racetrack Test Coil James H. Chrzanowski (PPPL) and Oak Ridge National Laboratory June 12, 2003.
IPod analyses Paul, Ethan, Niels. Casing: Plastic cover Dual injection molding ▫White cover ▫Transparant layer on top of this Advantages ▫Lower part cost.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
Lithium Hydride Absorber Program Update Alan Bross.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
NFMCC Meeting 3/12/06 A. Bross LiH Absorbers Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
LiH Absorber R&D Alan Bross January 26, LiH Absorber in Cooling Channel  LiH absorbers are now the “baseline” for the initial 4D cooling u Replaced.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
LARP Collaboration Meeting Racetrack Coil Fabrication
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Exercises for Q1. Insulated copper tube A thin walled 10 mm copper tube is used to transport a low-temperature refrigerant with a temperature that is.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
TUTORIAL 1 7/3/2016.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Ti/SS transitions A.Basti INFN-PISA*
LARP Phase II Secondary Collimator RC1
Spectrometer Solenoid Fabrication Status and Schedule
Far Detector Activities Late 2017 – Early 2018
MICE Coupling Coil Update
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Jet A – Thermal Oxidation Test Training Memphis Refinery Lab
Acrolab Ltd. – Copyright 2003 – Improving Processing of Rubber
Presentation transcript:

Lithium Hydride Absorber Program C. M. Lei March 17, 2008

LiH Absorber Program2 An instrumented LiH disc (30 cm diameter, 4 cm thick) for measuring the thermal conductivity will be made. Two LiH discs (50 cm diameter, 6.5 cm thick) will be made as absorbers for use in MICE Step III.1 (first cooling measurement – no RF, 1 disk between upstream and downstream spectrometers) LiH Discs LiH Disk inside the Spool piece CalorimeterCerenkov Detector Time-of-flight Detector Solenoid

LiH Absorber Program3 Y ‑ 12 National Security Complex will be sub-contracted to fabricate these discs. It is located in East Tennessee, adjacent to Oak Ridge National Laboratory. A facility maintains the nation’s uranium and lithium technology base. Y ‑ 12 National Security Complex

LiH Absorber Program4 LiH Discs Fabrication Produced by Hot Isostatic Pressing Produced using existing mold design Tested by chemistry X-Rayed by Radiography to ensure no voids Machined to size Dimensional inspection Coated with epoxy completely (needed to be finalized) Packaged in drum type container Shipped to FermiLab by Fed-X HIP: the simultaneous application of heat and high pressure. A high temperature furnace is enclosed in a pressure vessel. Work pieces are heated and an inert gas, generally argon, applies uniform pressure.

LiH Absorber Program5 Manufacturing Drawings for the Discs 12 Blind holes for housing thermo-couples

LiH Absorber Program6 The Set Up of the Thermal Test Stainless steel base structure High temp glass ceramic High temp low k gasket 1” copper tube with heaters 12” dia steel ring Machined LiH disc Thermocouples X12 Foam board & gasket Flexible cooling tube

LiH Absorber Program7 The Set Up Ready for the Thermal Test

LiH Absorber Program8 A Couple of Quick Checks Heat Sink Check: A coil of Parflex flexible thermoplastic polyethylene tubing, (¼”OD, 0.04” wall) was wrapped around the steel ring; Chiller temperature was set at -10C; Steel ring temperature was at -1C. Heat Source Check: 3 kapton flex heaters with R=157 ohms were glued to the inside of the copper sleeve evenly; +123C was achieved on sleeve surface at applied voltage of 30V

LiH Absorber Program9 The Hardware Ready to take the Disc Glove bag with inert gas flowing during the handling and testing processes

LiH Absorber Program10 The MICE Energy Absorber The absorber is fastened by two M8 screws and nuts first. Carbon-fiber Clamp Shells LiH Disc (~ 10 kg)

LiH Absorber Program11 The Supporting Tube Carbon fiber tubing 8 mm OD, 1 mm wall M8 threaded insert to be glued with the tubing (aluminum or G10)

LiH Absorber Program12 Conceptual Installation This absorber is lowered down through the slot of the ss spool piece

LiH Absorber Program13 Conceptual Design of the End Cover A saddle with a level platform may be developed to provide a reliable vacuum seal Carbon-fiber tubing Blind cover with carbon fiber tubing attachments (FNAL Design?)