Supplier Quality Improvement

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Contractor Desktop Electronic Bid System Training.
MAJOR REPAIRS AND ALTERATIONS
Final/Shipout Inspection Approved for Public Release.
How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
ISR Systems Supplier Basic Training ISR Space & Defense Supplier Quality.
PPAP Requirements Training
First Article Inspection Report
HACCP Manager Software™
Quality Assurance System
SUBSAFE Approved for Public Release
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
First Article Inspection
Advance Ship Notices Training Presentation for Supply Chain Platform: BAE Systems July 2012.
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Chapter 11 Record-Keeping Procedures. Objective In this module, you will learn: u What kinds of records are needed in a HACCP system u When to record.
AKTAU, SEPTEMBER 2012 WESTERN KAZAKHSTAN INVESTMENT FORUM PRESSURE VESSELS.
Setting Up Alerts and Dashboard Links. When you first start using the Active Orders system, you will need to establish the settings for two types.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
Welding Drawings. Why welding drawings? Drawings are needed to share information with others involved in the project. –Owner –Architect and Engineer –
Documentation Traceability and documentation is required.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
Metal Fabrication Quality and conformity of our products 2015.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
Click here to begin HOW TO FIND RESEARCH THESIS HOW TO FIND RESEARCH THESIS.
SMART Agency Tipsheet Facility List This document focuses on setting up facilities within an agency. Total Pages: 7 Facility Profile Contacts Operating.
How the NCSX Project Does Business
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
HOW TO FIND RESEARCH PROJECT PAPER HOW TO FIND RESEARCH PROJECT PAPER Click here to begin.
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
New Generation Foods: Receiving Anna Fortenberry.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
– Supplier information
Chapter 11 Record-Keeping Procedures.
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
First Article Inspection
ISR Systems Supplier Basic Training
First Article Inspection Report (FAIR) Training
Supplier Connect (SCx) Training Material –. Invite New Supplier &
CDRL E003 CFAT REPORT TEMPLATE
Supplier Connect (SCx) Training Material
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Quality clause RES-71 on MDA purchase orders (DFARS )
SQA01 Guidance Material: FAI Review
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
First Article Inspection
ISO 9000:2000 “Cracking the Case”
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
BS EN 10204:2004 Metallic Products – Types of inspection documents
BS EN 10204:2004 Metallic Products – Types of inspection documents
ELECTRICAL DISCHARGE MACHINING Special Process Instruction
Civil/Structural Engineering
Presentation transcript:

Supplier Quality Improvement Cert Package Examples August 2012 David T. Hutton Supplier Quality Engineer

Purchase Order

Purchase Order Quality Requirements Company Name & Address Purchase Order Example Line Item Qty Part Number Drawing Rev Quality Details Yes /No for Source Inspection

Purchase Order Quality Requirements Source Inspection Requirements are indicated By the X in the box for Yes/No And if Yes then one or both the Govt and or Northrop Grumman Requirement For Source Inspection for Both Govt and NGES-MS Source Quality Code 68 Source Inspection Mark pages according to the proprietary level of information as described in Company Procedure J103 (or remove)

Purchase Order Quality Requirements Quality Details Yes /No for Source Inspection

Quality Code 10 Requirements

Supplier As Built Configuration Certification Quality Code 10 Requires completion Of QCM-229 As Built Configuration Form Complete this form When required By Purchase Order, Include the Serial, Drawing Rev, QN’s RN’s, this is to be Signed by a Company Representative and Delivered with Data Package. Quality Code 10 As Built Configuration

Quality Code 22/23 Requirements

Specific Test Report Requirement Cert Marking Requirements Quality Code 07 Quality Code 22 Certificate Of Material Test/ Quality Code 23 Heat Report Add Find No NOTE: When multiple C of C For heat reports and Material Test Reports place the Find No. on each page of the Cert as well as the information Shown. Quality Code 22 Material Test Report

Specific Test Report Requirement Cert Marking Requirements Quality Code 07 Cert for Chemistry Of Material Supplied Quality Code 22 Add Find No Quality Code 22 Material Test Report

Specific Test Report Requirement CERT for Material Test Example 2 Quality Code 22 Cert Marking Requirements Quality Code 07 Add Find No Certs Must be signed Quality Code 22 Material Test Report

Specific Test Report Requirement Quality Code 22 Chemistry Cert Con’t. DFAR 252.225-7014 Alt 1 Specialty Metals Clause Cert Marking Requirements Quality Code 07 Add Find No Verification and Cert Of Location of melting Country Quality Code 22-Chemistry and DFAR Compliance

Quality Code 66 Requirements

Special Process Requirement Cert Marking Requirements Quality Code 07 Quality Code 66 Welding Certification of Compliance Quality Code 85 Name and Address Of Supplier Here Welder Signature Quality Code 66 Welding, Quality Code 85 C of C

Special Process Requirement Name of Company Cert for NDT Quality Code 66 Cert Marking Requirements Quality Code 07 Cert Must be signed Quality 66 and 85 for NDT

Quality Code 74a Requirements

Recording Inspection Results In Accordance with QSR-3 Cert Marking Requirements Quality Code 07 Quality Code 74a And QCM-35 Form Used to document As inspected drawing Requirements as Specified in Quality Code 74a. Quality Code 74a and QCM-35 Form

Quality Code 85 Requirements

Certification of Conformance Cert Marking Requirements Quality Code 07 Quality Code 85 Certificate of Conformance Name and Address Of Supplier Quality Code 85 C of C