VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.

Slides:



Advertisements
Similar presentations
P3- Represent how data flows around a computer system
Advertisements

O. Stézowski IPN Lyon AGATA Week September 2003 Legnaro Data Analysis – Team #3 ROOT as a framework for AGATA.
Production and Costs.
EBSCOhost Collection Manager Search Profiles Tutorial support.ebsco.com.
ISupplier eInvoicing solution, user guide delivering the benefits.
1 Australian Newspapers Digitisation Program Development of the Newspapers Content Management System Rose Holley – ANDP Manager ANPlan/ANDP Workshop, 28.
External Sorting Problem: Sorting data sets too large to fit into main memory. –Assume data are stored on disk drive. To sort, portions of the data must.
IS 426: Information Systems Construction in Modern Society Downloading and exploring oracle development environments.
Introduction to Parallel Programming MapReduce Except where otherwise noted all portions of this work are Copyright (c) 2007 Google and are licensed under.
AFISS, ◊ Tel: (519) ◊ ◊ ◊ Web: ◊
Chapter 6: User-Defined Functions I Instructor: Mohammad Mojaddam
Cost Behavior Analysis
1 Machine Architecture and Number Systems Topics Major Computer Components Bits, Bytes, and Words The Decimal Number System The Binary Number System Converting.
Understanding the CORBA Model. What is CORBA?  The Common Object Request Broker Architecture (CORBA) allows distributed applications to interoperate.
What to do for a Financial year end And When to do it.
C R O P S T O I N D U S T R Y WP4 TaskS 4.1 & 4.2 Task leader: ICCEPT Crops2Industry “Non-food Crops-to-Industry schemes in EU27” Calliope Panoutsou &
1 History of compiler development 1953 IBM develops the 701 EDPM (Electronic Data Processing Machine), the first general purpose computer, built as a “defense.
Machine Architecture CMSC 104, Section 4 Richard Chang 1.
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Creating Report Templates.
EMEA Media Centre “Content Lifecycle – a Greenfield approach” 7 September 2011.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Activity 1 Record and edit your voice using Audacity 1.Download Audacity (a free and open source audio editing software from
22.1PPS t/a Carnegie et al; Accounting: Financial and Organisational Decision Making © 1999 McGraw-Hill Book Co. Aust. ACCOUNTING Financial and Organisational.
T. Bowcock Liverpool Sept 00. Sept LHCb-GRID T. Bowcock 2 University of Liverpool Successes Issues Improving the system Comments.
The Control Panel is the starting point when you wish to load files into Blackboard. Students cannot see this panel, unless they know your password of.
Developing an Algorithm
© 2012 Whamcloud, Inc. Whamcloud and Quality Chris Gearing & Mike Stok Software Engineers Whamcloud, Inc Lustre User Group Austin TX April 2012 Version.
Services for Object Storage and Preservation March 2008 All content in these slides is considered work in progress. In no way does it represent an absolute.
Includes the following resources: Windows Azure 3 small compute instances 3GB of storage 250,000 storage transactions SQL Azure Two 1GB Web Edition.
THE CHURCH-TURING T H E S I S “ TURING MACHINES” Part 1 – Pages COMPUTABILITY THEORY.
MCSE Guide to Microsoft Windows Vista Professional Chapter 5 Managing File Systems.
Adaptive Mining Techniques for Data Streams using Algorithm Output Granularity Mohamed Medhat Gaber, Shonali Krishnaswamy, Arkady Zaslavsky In Proceedings.
Lecture 15- Parallel Databases (continued) Advanced Databases Masood Niazi Torshiz Islamic Azad University- Mashhad Branch
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
Thursday, 17 Jan Day 4 9:00-9:15a.25 hrs Overview of the day 9:15-10:45a 1.5 hrsMichael/Andy/Adam Recap and Prioritization of Functional / Workflow Implications.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
MediaCentre RFP Where we are, Where we are going.
[IT INFRASTRUCTURE OVERVIEW] Paul Ashurst Executive Director, EIS Global Network Services IT Corporate.
MediaCentre Planning Workshop Wednesday January 16 th, 2013.
C++ Programming: Program Design Including Data Structures, Fourth Edition Chapter 6: User-Defined Functions I.
Denes Talosi 20/03/2013.  Content Processing  Coordination  Non-Linear  MC-CE Op Gap analyzes.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
Presentation Preparation Overview The format will be as follows for all of the sessions will be as follows – First third of the slot will be a presentation.
Lesson 11: : Inbound Purchase Orders & Requisitions.
Chapter 3: User-Defined Functions I
Clearly Visual Basic: Programming with Visual Basic 2008 Chapter 16 I’m on the Inside; You’re on the Outside.
DATA MANAGEMENT CONTENT ORGANIZATION AND MEDIA IDENTIFICATION John Doe Executive Vice President Digital Division.
Production and Costs. Economic versus Accounting Costs Economic costs are theoretical constructs which are intended to aid in rational decision-making.
C++ Programming: From Problem Analysis to Program Design, Fourth Edition Chapter 6: User-Defined Functions I.
MediaCentre Project Transition Planning/Support 18 January 2013.
VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.
Agenda – Madrid 3/25/13 Content Processing Today – Ingest – Content Prep – Delivery Insourcing Plans – Molinare (sp?) Content Identification Business Case.
14/03/2007A.Minaenko1 ATLAS computing in Russia A.Minaenko Institute for High Energy Physics, Protvino JWGC meeting 14/03/07.
Programming Logic and Design Fifth Edition, Comprehensive Chapter 7 Using Methods.
CONVEYOR IDLERS CORP 3340 Financial Requirements Presented by: Commercial Finance Date: Thurs 22 October 2015.
PHP: Further Skills 02 By Trevor Adams. Topics covered Persistence What is it? Why do we need it? Basic Persistence Hidden form fields Query strings Cookies.
METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 3.1: Agriculture: work in progress in growing crops.
Copyright © Cengage Learning. All rights reserved.
(1) Organize information processing centers environment, the various functions and details Electronic Data Processing (EDP): can refer to the use of automated.
Day 4 – pre-class prep Process Modeling Data flow diagrams :
Chapter 6: User-Defined Functions I
Chapter Three Process Costing.
Contract Marketplace Online Shopper Training
Customer Online Ordering
Introduction to Transaction Processing
Concurrent Version Control
Activity 1 Record and edit your voice using Audacity
Writing a Complete Program
Final Review 27th March Final Review 27th March 2019.
Presentation transcript:

VOLUMES

RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day assumed an overall 30/70 SD/HD content split, 900 GB of data per day. To be added to this figure is that for the circa 100 hours of supplier commercials content per annum, equating to around another 7 GB of data per day. This gives a total input data volume to the store of 907 GB per day.

RFP Summaries Assuming a window for acceptance of distributor programme content of 30 days and that distributor content would not be staged to data tape storage during this period, this implies a storage volume for incoming content only of circa 30 TB.

RFP Summaries The same disk storage will be used for: – storage of work in progress content supporting programme QC and versioning operations – source content for promotions – work-in-progress content for non-linear – browse proxy content for the whole operation.

RFP Summaries Data volumes input in connection with the initial automated QC pass of received distributor masters will be as per above (900 GB/day). Assuming the transcoded / transwrapped distributor masters will also be subject to automated QC, this will require that approximately the same volume of data will need to be input again(900 GB/day), giving a total of 1.8 TB per day.

Input to the transcode farm responsible for content normalisation to and for the production above at 907 GB per day.

How CineShare is currently used Output volumes from this transcode farm will be similar to input volumes with the addition of % to account for the generated browse content, say 1,000 GB per day.

Assumed that browse proxy content for use within SPTN will be persistent. Use could be made of the data tape storage to stage browse content that was older then, perhaps, 3 years. A browse proxy will exist for each item of TX ready content. A storage volume of 28 TB per annum is calculated for SPTN in-house browse.

To these figures for SPTN's internal browse proxy volumetrics, should be added figures for the separate browse proxies needed to support production of language localisation content (language tracks and subtitles). Production of these additional proxies could generate a further 25 GB per day (based on 12,000 programmes per annum requiring localisation). If to be persistent, this would require a storage volume of 10 TB per annum for reference browse. It is suggested that browse proxies would be staged to data tape after 60 days

Pessimistically, weassume every channel also requires a B version, resulting in further 900 GB per day of new programme content being output from QC/Version edit. This gives a total output of programme content from the QC / Version edit process of 1,800 GB per day. Assuming this content would remain held on the MAM-managed disk storage for 30 days, this implies a storage volume for newly created programme versions only of circa 55 TB

With 9,201 input hours of programme content for the London-channels, and assuming a shot selection ration of 10% using MAM/browse, this equates to a transfer volume of 64 GB per day from the MediaCentre to the London production workgroup. Volumes of finished promotions being returned equate to 4 GB per day.