Preliminary Design Review (PDR)

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

University of Florida PDR Presentation. Vehicle Design Diameter: 5.86 Length: 135 Static Stability Margin: 1.4 Total Weight: 23.6 lbs.
UF Hybrid Rocket Teams Mile High Club Brought to you by Chris Leonard, Ty Morton, Alex Aueron, Sam Darr, and Josh Childs.
CAP Model Rocketry Program.  1. MATERIALS. I will use only lightweight, non-metal parts for the nose, body and fins of my rocket.  2. MOTORS. I will.
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
Preliminary Design Review University of Colorado Boulder NASA Student Launch
U NIVERSITY OF F LORIDA T HE M OST I NTERESTING R OCKET IN THE W ORLD.
P RELIMINARY D ESIGN R EVIEW University of North Dakota Frozen Fury Rockety Team.
Critical Design Review NASA University Student Launch Initiative University of Nebraska–Lincoln
Student Launch Project Preliminary Design Review January 10, 2014.
Illinois Space Society Tech Team USLI CDR Presentation.
U NIVERSITY OF F LORIDA PDR P RESENTATION. O UTLINE Project Organization Vehicle Design Payload Design Recovery System Simulations Future Work.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Illinois Space Society Tech Team USLI FRR Presentation.
CDR Clear Lake's Team Rocket 2929 Bay Area Blvd. Houston, TX
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
PDR DETAILED SLIDES Charger Rocket Works University of Alabama in Huntsville NASA Student Launch Kenneth LeBlanc (Project Lead) Brian Roy (Safety.
Student Launch Project Flight Readiness Review April 21, 2014.
Science Fiction. Rocket flight Centre of Mass or Centre of Gravity (CM or CG) Centre of mass is the mean or central location of all the mass of an object.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Safety ► The safety officer for the entire team is Maia Madrid. ► During launch we will follow NAR safety rules and regulations. ► We will follow standard.
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
University of Arkansas Senior Project- When Pigs Soar.
STUDENT LAUNCH PRELIMINARY DESIGN REVIEW PROJECT ADVANCE.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
University of Florida Rocket Team Critical Design Review Presentation.
Critical Design Review Presentation Jan. 20, 2011.
University of Arkansas Senior Project- When Pigs Soar.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Project Ares University of Central Florida NASA Student Launch 1/28/2015.
The Rocket Men Project One Giant Leap. Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom Body Tube Length-
D EPARTMENT OF M ECHANICAL AND A EROSPACE E NGINEERING HIGH POWERED ROCKETRY CLUB PDR PRESENTATION 1.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
Model Rocketry Saturn Phase
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
Critical Design Review Presentation Project Nova.
PLANTATION HIGH PDR PRESENTATION Team 1. VEHICLE DIMENSION & MATERIALS.
Critical Design Review Presentation Alabama Rocket Engineering Systems (ARES) Team The University of Alabama.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
1 Science of Flight The Aerospace Environment Model Rocketry.
Preliminary Design Review Clear Lake High School Team Rocket.
Planetary Lander PDR Team Name
Project Aegis Preliminary Design Review Team Members:
Preliminary Design Review Presentation
Preliminary Design review
College of Engineering
2018 First Nation Launch - Flight Readiness Review
November 7, 2014.
Development and Principles of Rocketry
Sounding Rocket PDR Team Name
November 7, 2014.
Sounding Rocket CDR Team Name
Final Readiness Review
Plantation High SL team 1
Target Altitude Safety Document
Presentation transcript:

Preliminary Design Review (PDR) Project Nova Preliminary Design Review (PDR)

Static Stability Chamber Vehicle Overview Nose Cone Avionics Section Booster Section Main Parachute Tube Coupler Fins Shock Cord Drogue Motor Avionics Bay Shock Cord Payload Bay Static Stability Chamber

Vehicle Dimensions Length: 108 in Diameter: 5 in Mass: 55.2 lbm Material: Nose cone – Fiberclass Body – Fiberglass Fins – Fiberglass 18 in 41 in 108 in

Vehicle Dimensions Number of fins: 4 Root chord: 7 in Tip chord: 3.352 in Height: 4 in Sweep length: 2.309 in Sweep angle: 30°

Static Stability Margin CG Location: 66.655 in CP Location: 77.468 in Stability: 2.16 cal 66.348 77.468

Static Stability Margin

Static Stability Margin If the final weight of the rocket falls below the optimal weight, a chamber has been placed within the rocket where steel discs will be placed. This chamber was placed near the current CG position to avoid large changes in the stability. Stability Chamber Motor

Vehicle Justification The vehicle has been designed to reach a target altitude of 15,500 feet. Its goal is to descend at a controlled rate allowing the camera payload to survey the ground and identify hazardous landing areas. Using the two criteria's above, the vehicle was designed around: Motor Aerodynamics Payload deployment Payload size

Motor Selection - Comparison Total Impulse (lbf-s) 2712.60 2490.30 Average Thrust (lbf) 488.80 581.20 Length (in) 39.76 Diameter (in) 3.86 Loaded Weight (lbm) 25.04 25.31 Propellant Weight (lbm) 13.50 14.59

Motor Selection Justification: Using the values for typical mass increases experienced from PDR to final design, an estimated allowable mass increase was calculated using the two rocket motors. This allowable mass increase would be the maximum mass increase before the vehicle would no longer be able to achieve its target altitude.

Motor Selection – Justification (N2600) 0% Mass Increase 25% Mass Increase 33% Mass Increase Total Mass – Liftoff (lbm) 55.50 69.38 73.82 Propellant Mass (lbm) 14.59 Total Mass – Burnout (lbm) 40.61 54.41 58.83 Apogee Achieved (ft) 16301 13759 12904 Stability (cal) 2.21 The values for apogee achieved and stability were calculated using OpenRocket.

Motor Selection – Justification (N2600) The values for total mass at liftoff and apogee achieved at those masses were plotted against each other. A trendline was plotted against these values to provide an equation for calculating an estimated value of mass allowed to achieve 15500 ft.

Motor Selection – Justification (N2600) Using the equation, a total mass value was calculated. The optimal mass margin allowed is 6% for this motor. Optimal: 6% Total Mass – Liftoff (lbm) 58.70 Propellant Mass (lbm) 14.59 Total Mass – Burnout (lbm) 44.11 Apogee Achieved (ft) 15611 Stability (cal) 2.21

Motor Selection – Justification (N2200) The same calculations and simulations were performed using the N2200 motor. The optimal mass increase allowable was estimated to be 23%. Current 25% Mass Increase 33% Mass Increase Optimal: 23% Total Mass – Liftoff (lbm) 55.20 69.00 . 67.90 Propellant Mass (lbm) 13.50 Total Mass – Burnout (lbm) 41.70 55.50 59.52 54.40 Apogee Achieved (ft) 17393 15304 14387 15517 Stability (cal) 2.22

Motor Selection Based on the calculations made in the previous slides, the motor that will provide the best performance for our launch vehicle is the Cesaroni Technologies N2200. Possible Dealers: What’s Up Hobbies (Stocton, CA) Wildman Rocketry (Van Orin, IL)

Aerodynamics The total drag coefficient ranges from 0.41 at a Mach number of 0.3 to 0.59 at Mach 1.03, the simulated highest Mach achieved by our vehicle.

Simulated Performance Velocity off rod (7 ft): 57.7 ft/s Max velocity: 1133 ft/s Max acceleration: 260 ft/s2 Apogee: 15517 ft T/W ratio: 7.20 Time to apogee: 31.1 s

Simulated Performance The stability of the rocket in a 5mph horizontal wind is shown below. The vertical orientation decreases from 90°at launch to 55°at apogee.

Simulated Performance The drift of the rocket was calculated under five wind speeds: 0, 5, 10, 15, and 20 mph. Wind Speed (mph) Drift (ft) 34 5 1453 10 3042 15 4631 20 6677

Construction of Airframe AutoClave layup Fiberglass construction Male vs. female molds

Dual-Deployment Recovery System Stages Drogue Deployment at Apogee Main Deployment at lower, set altitude Landing Electronics Altimeter Connections

Benefits and Disadvantages Reduces Drift Avoids Initial Deployment at High Speed Disadvantages Possibility of Simultaneous Deployment Higher Risk of Failure

Safety Advisor Christopher Short Certified Class 3 Operator NAR/TRA Advisor Will purchase, store, and transport materials Installs engines on site when ready to test Guides Team in practicing proper safety procedures throughout the project

Safety Officer Jacob Herrera Briefs Team on proper safety procedures before each lab meeting Ensures proper MSDS are on site Inspects first aid kit and restocks if needed Inspects lab machinery to ensure its functionality Organizes bi-monthly safety meetings to address any documented incidents and effectiveness of safety techniques

NAR/TRA Procedures NAR high powered rocket code will be reviewed by Team MSDS are available to ensure materials are used properly Members are provided with proper lab attire and emergency safety equipment

Purchase, Store, Transport, and Use Logistics Christopher Short has a workshop that is used for personal rocket projects that he has volunteered for Project Nova Chris is experienced with high powered rocketry and the purchasing methods for energetics He will transport and store the materials used in Project Nova

Test Sites Locations Phoenix Missile Works in Sylacauga, AL Southeast Alabama Rocketry Society in Samson, AL Team will abide by the safety regulations of each club Chris Short will inspect each rocket prior to on site RSO evaluation

Hazard Briefing and Safety Acknowledgement All Team members will be briefed on possible dangers and risks before working Team will be taught to practice the proper safety procedures and precautions that are associated with high powered rockets A Safety Acknowledgement form was signed by all members stating they will comply with proper safety procedures and applicable local/state/federal laws

Emergency Procedures Weather Fire Injury In case of severe weather, the lab and the halls outside of the lab are designated shelter areas Fire All members have been briefed on the evacuation procedures in case of fire Injury A first aid kit is brought on site and emergency service contacts are kept on the lab door

Payload 1, SLS Technology Requirements Analysis of ground hazards On-board processing Real-time transmission Justification Sophistication and development of unmanned technologies

Design Camera – CPU interface Data structures Program analysis Transmission to ground terminal

Redundancy Separate from other electronics Complete power redundancy

Payload 2, Boost Phase Analysis Requirements Structural and dynamic analysis of systems during boost Justification Importance of engine characteristics Value of in-flight data Importance of boost-phase

Motor Analysis / Extrapolation  

Electrical System Risk to Electrical System Proposed Analysis Incidental damage Proposed Analysis Accelerometer data

Stain Gauges and Pressure Transducers Computer-based Analysis Payload Requirement Design Feature Verification Method Air-Frame Analysis Stain Gauges and Pressure Transducers Computer-based Analysis Propulsion Analysis Thermocouple at Nozzle Electrical Systems Electronics Bay Temp. & Accelerometer

Payload 3, Environmental Effects Requirements: Analysis of Supersonic flight on vehicle paint / coatings The payload will determine the suitability of NeverWet, a commercially available waterproofing material, for use in aerospace applications

Justification Corrosion and Wing Icing are widespread, expensive, and potentially dangerous hazards facing the aerospace industry A waterproofing material that can withstand transonic effects could be suitable for use on wing surfaces to prevent wing icing on spars and struts to prevent water based corrosion

Procedure NeverWet will be applied to the nose cone of the rocket A material that changes color when wet will be applied under the coating of NeverWet Water will be applied before the flight to ensure proper application and after to determine if degradation of the material occurred

Additional NeverWet Info Aerosol Spray Application System with separate base and top coats Dry Heat Resistance is 230F 30 minutes until drying occurs (12 hours to full cure) Care will need to be taken due to flammability hazards Skin contact and inhalation will be avoided

Conclusion Review Design Safety Moving Forward Questions