Proposal for Upfront Tariff Fixation for Re- Development of Berth Nos. 8, 9 and Barge Berths.

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

PORT OF LAKE CHARLES. CITY DOCKS 11 USAID/USDA approved transit sheds 13 Ship Berths 1.3 million square feet waterfront storage 600,000 square feet of.
Development of the port of Poti by strategic investor in the post-crisis world by Andrii Kuzmenko Poti Sea Port Corp. – an APM Terminals company.
Growing prosperity through trade Kenya Ports Authority Media Workshop Port Management Models.
1 TRF Limited TRF is capable of offering complete design, engineering, manufacturing, erection and commissioning solutions for material handling.
Complex processing industries --- Iron & Steel industries.
Port of Santos Cargo Statistics Port of Santos - Trade Statistics / June 2010.
1 TRF Limited Products. 2 TRF Limited Grab Duty Level Luffing Cranes are in operation at Mumbai ports. The largest Grab Level Luffing Crane is designed.
TRANSPORTATION MANAGEMENT
KUIPERS SHIPBUILDING B.V. NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V. VISION: CREATE LOGISTICS ALTERNATIVES. ECONOMICALLY AND ENVIRONMENTALLY.
Domestic Water Carriers. Significance of the Industry Transport roughly 14% of total national freight 26.5% of total domestic ton-miles Employ close to.
Chapter 6 Water Carriers.
Restrictions LOA244 m Draught11 m Air Draught18 m.
The right balance between profit and protection. The Plan Choose the amount you want to invest. You can choose the death benefit between 2 options: Option.
A Study on Future Multipurpose Vessel for the Northern Baltic Sea Golam Mortuja LAIVA 2025 Espoo.
1. Dev. of Marine Liquid Terminal Facilities consisting of two berths 300m, each on North side of existing Jetty and a SPM in KPT waters at OOT Vadinar.
MTBMA - Transportation Program Jim Dwyer Maryland Port Administration Nov. 20,
Lumsden Point Development
SHIPPING,TRADE TRENDS AND THEIR IMPACTS ON PORT INFRASTRUCTURE
CHAPTER 9 PORT TARIFFS. INTRODUCTION Port Tariff : Is the reward / payment payable to the port authority for the rendering of a service. Pricing – depends.
Business Logistics Management, Vogt/Pienaar/de Witt
Public Private Partnership in Ports By A.K. Mohapatra Secretary Department of Shipping.
Chapter 8 Water Carriers and Pipelines
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
The Port of Baltimore Glossary Activity Produced by.
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA SPACES AND IN BLACK SEA REGION AS A WHOLE SPEAKER capt. Zhivko Petrov - Director of Directorate.
Management of Transportation
OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) For Apr’ %
Indian Ports – Key Sector Trends 21 st January 2010.
Port Equipment Products Grab duty Level Luffing Kangaroo Crane
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
COECLERICI Italian business mission to Indonesia May 7th Alberto Simeone, President Director Coeclerici Indonesia.
Dry Bulk Terminals vs. Offshore Transshipment ICHCA International Conference “ Changes to Trade & Shipping in the 21 st Century ” Busan, S. Korea May 2008.
Paper on Paper on “ Ease of doing business in Dry Bulk Sector- Highlight current issues and suggest possible solutions” Presented by Mr. M K Palanivel.
OPERATIONAL PERFORMANCE MAY’12 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2011 – 12) For May %
TRACECA PROJECT «Development of the multi-modal complex in SE “SCPI” using the 3 rd basin of the Sukhoy estuary»
Discovering Maritime Transportation. Significance of the Industry  Transport roughly 14% of total national freight  26.5% of total domestic ton-miles.
OPERATIONAL PERFORMANCE JUNE’12 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2011 – 12) For June %
Earning Enhancing Schemes Sanjay Upreti PAM. Rolling Stock Assets Locomotives Diesel Electric Steam Total Wagons Coaches
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
ISO 9001, ISO & OHSAS THE SETTING  Opened to commercial shipping7 th October 1933  Initial capacity3 berths (1.3 LT)  Premier port of the.
1PAGE Outline of the presentation Transnet organisational structure Business overview of TNPA Major investment and infrastructure plan Major investment.
Investment Project Construction of corn transloading terminal in the port Yuzhny.
ISO 9001, ISO & OHSAS THE SETTING  Opened to commercial shipping7 th October 1933  Initial capacity3 berths (1.3 LT)  Premier port of the.
CCCC-FHDI Engineering Co., Ltd.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Minerals and Fossil Fuels of Pennsylvania By: Name Here.
DRY BULK CARGO HANDLING. TYPES OF CARGO 1.FOOD GRAINS 2.FERTILISERS 3INDUSTRIAL RAW MATERIALS 4.SUGAR.
1 Heavy Lift handling in Shanghai On Mar. 19 th, 2014 GSL refreshed our Heaviest Cargo Record! Cargo dimension and weight: 2 pieces each: x 5.7 x.
Shanghai – Constantza – Budapest
By Andie Lasser.  Reprocessing used materials reduces energy needs for many manufacturing processes  Recycling used aluminum cans requires only five.
Serving the National Economy. There are nine main commercial and industrial ports in Saudi Arabia with a total of 193 berths. Dammam Diba Jeddah Jizan.
The most important informations about the port It was established in the 10th century It is one of the most important ports in Poland and one of the.
Port of Koper overview 280 ha of port area
Contents  Port Side handling of containers  Issues  New Levels of service standards.  Increasing Terminal Capacities.
RECENT REFORMS IN THE PORT SECTOR 3rd February, 2017 Rajat Sachar
RIGA CONTAINER TERMINAL Corporate Presentation
MUUGA CONTAINER TERMINAL.
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA
TARIFF AUTHORITY FOR MAJOR PORTS
RORO?.
Stockyard Equipment Products Stacker Reclaimers Barrel Reclaimers
PPP MODEL IN DRY BULK & LIQUID: SUCCESS OR FAILURE ??
12thJune, 2016 Science City, Kolkata.
TRANSFORMATION AGENDA FOR MAJOR PORTS
RIGA CONTAINER TERMINAL Corporate Presentation
The Port of Baltimore Glossary Activity Produced by.
Bellringer.
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

Proposal for Upfront Tariff Fixation for Re- Development of Berth Nos. 8, 9 and Barge Berths

Background The Port intends to take up development of the existing Berth No. 8, Berth No. 9 and barge berths as multipurpose cargo berths on PPP basis. The total berth front available after shifting of liquid handling from berth 8 and dismantling MOHP from berth 9 and barge berth area would be 950m.

2013 Guidelines The proposal has been formulated as per the guidelines for determination of tariffs for projects at Major Ports, The proposal contains the proposed Reference Tariff and Performance Standards. The Reference Tariff will be the highest tariff fixed for the commodity under the 2008 guidelines. In case this is not available, tariffs are to be determined by applying the principles of 2008 guidelines. As there is no comparable berth in this port nor in any other port due to the difference in optimal capacity and Capital Cost, the principles of 2008 guidelines have been applied.

The Proposal Mechanised Coal / Coke / Limestone / Gypsum Terminal at Berth No.8 Multipurpose General Cargo Berth for handling Minerals / Steel Coils & Products / Agro Products / Fertilisers / Others / Containers at Berth No. 9 Mechanised Iron Ore / Bauxite / Other Ores & Minerals Berth at Berth 9A. The PPP operator would have the freedom to handle any cargo of his choosing.

Berth No. 8 The optimal capacity of the terminal is 5.46 MTPA considering two Stacker cum Reclaimers and Grab Unloaders. The area available for the storage of cargo is around 7.9 Ha. The total capital cost is Rs crores which broadly consists of the following :

Total Cost of Berth and Dredging – Rs crores. Total Cost of Civil and Structural Works - Rs crores. Total Cost of Handling Equipments - Rs crores. Berth No. 8

Berth No. 9 The optimal capacity of the terminal is 4.18 MTPA. The area available for the storage of cargo is around 5.46 Ha. The total capital cost is Rs crores which broadly consists of the following :

Berth No. 9 Total Cost of Berth and Dredging – Rs crores. Total Cost of Civil and Structural Works - Rs crores. Total Cost of Handling Equipments - Rs crores.

Berth No. 9A The optimal capacity of the terminal is 9.58 MTPA. The area available for the storage of cargo is around 5.81 Ha. The total capital cost is Rs crores which broadly consists of the following :

Berth No. 9A Total Cost of Berth and Dredging – Rs crores. Total Cost of Civil and Structural Works - Rs crores. Total Cost of Handling Equipments - Rs crores.

Tariff Structure The total Revenue Requirement determined is recoverable through levy of the following charges : Berth Hire Charges Cargo Handling Charges Storage Charges beyond Free Period Miscellaneous Charges The Scale of Rates for levy of the above charges is as follows:

Berth Hire Charges Sl. No. Vessels Rate per GRT per hour or part thereof (Rs.) Foreign Vessel Coastal Vessel 1.All Vessels at Berth No All Vessels at Berth No All Vessels at Berth No. 9A

Cargo Handling Charges CargoCargo Handling Charges Foreign (Rs. per Tonne) Coastal (Rs. per Tonne) Mechanised Handling 1Coal / Coke Limestone Gypsum Others Iron Ore Bauxite Other Minerals Semi Mechanised Handling 1Minerals Steel Coil & Products Agro Products Fertilisers Others Containers per TEU per TEU

Storage Charges after Free Period First 7 Days8 th to 14 th Day 15 th Day Onwards Storage at Berth No. 8 1Coal / Coke Limestone Gypsum Others Storage at Berth No. 9 1Minerals Steel Coil & Products Agro Products Fertilisers Others Containers (per TEU) Storage at Berth No. 9A 1Iron Ore Bauxite Other Minerals

Miscellaneous Charges Sr. No. Particulars Rate per Tonne/TEU or part thereof (Rs.) 1Miscellaneous Charges at Berth No per Tonne 2Miscellaneous Charges at Berth No per Tonne 3 Miscellaneous Charges at Berth No. 9A1.37 per Tonne

Thank You