. PANC Annual Conference May 16, 2012 Progress on the California RPS.

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Advertisements

Investigating a Higher Renewables Portfolio Standard In California Power Association of California Symposium May 20, 2014 San Francisco, CA Nancy E. Ryan.
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
The Green Rush Implementing Renewables in California Dave Ashuckian, P.E. Deputy Director Division Of Ratepayer Advocates Power Association of Northern.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
Containing the Cost of California’s RPS Yuliya Shmidt, Senior Analyst February 2, 2012.
CALIFORNIA’S PROGRESS IN RENEWABLE ENERGY November 2012 Michael Picker Senior Advisor to the Governor for Renewable Energy Facilities.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Topics to Cover Interconnection Process Overview
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
Charles Hosken, General Manager Imperial Irrigation District
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
1 Introduction, scope, context Terminology, high-level approach Methodology, Inputs, Assumptions –Portfolio development –Discounted core –Environmental.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
OSC Meeting April 27, Transmission Cost Allocation Overview.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Leading the Way in Electricity SM SOUTHERN CALIFORNIA EDISON ADVANCED TECHNOLOGY California Senate Hearing on PIER March 1, 2011 SCE Assessment of State.
Transmission Planning at the California ISO September 10, 2015.
1 Encouraging Solar Development in California Commissioner Mark Ferron California Public Utilities Commission July 13, 2011.
California Takes Charge: Policies and Incentives for Energy Storage February 11, 2015 Rebecca Feuerlicht, SGIP Project Manager, Center for Sustainable.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Integrated Planning & Environmental Affairs Energy Agencies in California.
March 2012 CONFIDENTIAL AND PROPRIETARY CA REC Market Update FOR.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Resource Adequacy for Distributed Generation January 27, :15 am to 12 noon Energy Division staff discussion Megha Lakhchaura.
Jason Marks Commissioner, NM PRC May 21, 2010 New Mexico Regulatory Context Southwest Renewable Energy Transmission Conference.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Resolutions E-4168 and E-4157 Southern California Edison (SCE) requests approval of contracts with a new wind facility and a new solar photovoltaic facility.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
Renewable Power: Status and Issues 2011 Integrated Energy Policy Report Proceeding September 14, 2011.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
SDG&E Generation Additions Jim Avery Chief Development Officer.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
LS Power LS Power is a power generation and transmission group
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
LNBA Subgroup: Avoided Transmission Value
Forecasting and Operations CAISO Case
Energy Storage System Drivers and Use Cases for Energy Storage Systems
Independent Energy Producers (IEP) Steven Kelly, IEP Policy Director
Presentation transcript:

. PANC Annual Conference May 16, 2012 Progress on the California RPS

2 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Progress on the California Renewable Performance Standard Utilities confident about meeting 33% Renewable prices have dropped dramatically Transmission is being constructed The Large Generator Interconnection Process has been reformed – again The grid is accommodating utility-scale solar

3 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Historical Renewable Procurement by CA IOUs Renewable Procurement Has Increased Substantially Source: CPUC filings. Note: are historical, 2011 and on are projections based on March 2012 CPUC Compliance Filings.

4 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Historical MPR and Solar Contract Signing By Solicitation Year Renewable Energy Prices Have Decreased Substantially Source: MPR values from CPUC through 2011 MPR. Percentage of PV contracts above and below MPR, by solicitation year, from April 2012 CEC. Note: MPR reflects the next year’s MPR (i.e MPR value reflects MPR for a project with a 2012 COD). Represents both CSP and PV. (1) 2004 MPR value reflects peaking MPR. (1) ,736 3,563 2,668 2,262 1, MW Solar Solicited

5 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Transmission upgrade Approval statusRenewable Potential Online ISOCPUCMWTWh/Yr 1 Carrizo-MidwayLGIANOC effective Sunrise PowerlinkApproved 1, Eldorado-IvanpahLGIAApproved1, Pisgah-LugoLGIANot yet filed*1, Valley-Colorado River ApprovedApproved** 4, West of DeversLGIANot yet filed TehachapiApproved 4, Tehachapi Wind/Solar Diversity N/A 1, Cool Water-LugoLGIANot yet filed South Contra CostaLGIANot yet filed Borden-GreggLGIANot yet filed Path 42ApprovedNot yet filed1, Other-Outside of ISO GridN/A 3, Total 22, TWh/year needed in ISO area to meet 33% goal: - reflected in 2010/2011 Transmission Plan 44 * Large Generator Interconnection Agreement ** Petition to modify CPCN pending. Transmission underway to meet 33% RPS in 2020 Total cost = $7.2 billion Page 5

6 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. 2008: Generator Interconnection Process (GIP) Reform 1 –Increased cost to apply and stay in process –Network Upgrade costs & timing studied in cluster rather than serial process –Only large projects (>20 MW) can achieve Full Capacity Deliverability 2010: GIP Reform 2 –Combined SGIP & LGIP into a single interconnection procedure –Introduced CAISO deliverability options for all projects, including Small and previously Energy Only projects –Coordinated with the Transmission Planning Process (TPP) for 33% Renewable Procurement Goals 2012: TPP-GIP and GIP Reform 3 –Holistic GIP and TPP to approve upgrades with ratepayer funding –Aligning the interconnection process with the TPP resource portfolios –Structure GIP study process to produce realistic results even with extreme interconnection queue volume –Full Capacity Deliverability would be awarded to projects with environmental permits, PPAs and financing, or willing to pay for major upgrades without reimbursement. Progress on Transmission Interconnection Reform

7 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Agua Caliente – Supporting Grid Integration Quote from the North American Electric Reliability Corporation’s Integration of Variable Generation Task Force (IVGTF): “As VERs [Variable Energy Resources] increasingly augment and/or supplant conventional generation, the reliable operation of the grid will depend increasingly on the reactive power control, active power control and other contributions from VERs. The new reliability standards should require that VERs adequately mimic or replace the capabilities that are lost when VERS supplant conventional generation.” Agua Caliente Controls include –Reactive Power and Voltage Control –Low Voltage Ride-Through –Low/High frequency Ride Through –Active Power Control Additional features such as frequency regulation and inertial response possible, but require production curtailments IVGTF Draft Report: Special Reliability Assessment: Interconnection Requirements for Variable Generation, March (p 15)

8 First Solar Confidential & Proprietary 5/8/2010 | © Copyright 2010, First Solar, Inc. Obstacles to a Successful RPS Program Too many sub-programs: RAM, FiT, Small PV, UOG Is integration a problem? Are rates a problem? California going it alone