Prof. Yuan-Shyi Peter Chiu

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Sequencing algorithms for multiple machines
Production and Operations Management Systems
FLOW SHOPS: F2||Cmax. FLOW SHOPS: JOHNSON'S RULE2 FLOW SHOP SCHEDULING (n JOBS, m MACHINES) n JOBS BANK OF m MACHINES (SERIES) n M1 M2Mm.
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Operations Scheduling
ISE480 Sequencing and Scheduling Izmir University of Economics ISE Fall Semestre.
Scheduling.
Operations Scheduling
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
Scheduling Chapter 19.
Spring, Scheduling Operations. Spring, Scheduling Problems in Operations Job Shop Scheduling. Personnel Scheduling Facilities Scheduling.
Production Scheduling
Chapter 2: Model of scheduling problem Components of any model: Decision variables –What we can change to optimize the system, i.e., model output Parameters.
5. Operations Scheduling
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
1 IOE/MFG 543 Chapter 6: Flow shops Sections 6.1 and 6.2 (skip section 6.3)
1 Set # 3 Dr. LEE Heung Wing Joseph Phone: Office : HJ639.
1 By: Prof. Y. Peter Chiu Materials Management Scheduling ~ HOMEWORK SOLUTION ~
1 By: Prof. Y. Peter Chiu Scheduling ~ HOMEWORK SOLUTION ~
1 Set # 4 Dr. LEE Heung Wing Joseph Phone: Office : HJ639.
Scheduling.
Material Management 2010 Mid-Term Exam-#2 Solution By: Prof. Y. Peter Chiu 5 / 2010.
Air Traffic Control School Case Presentation – Dec. 2, 2010 Stephen Damian, Frank Trudo, Andrew Zuroski.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
OPERATIONS SCHEDULING AND SEQUENCING
Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Operational Research & ManagementOperations Scheduling Introduction Operations Scheduling 1.Setting up the Scheduling Problem 2.Single Machine Problems.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling (Part II) Mohd Zaidan bin Abdul Aziz B
Extensions of the Basic Model Chapter 6 Elements of Sequencing and Scheduling by Kenneth R. Baker Byung-Hyun Ha R1.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
1 Operations Scheduling Act I – The Single Machine Problem General problem: given processing times, setups times, due dates, and job flows on machines.
1 Short Term Scheduling. 2  Planning horizon is short  Multiple unique jobs (tasks) with varying processing times and due dates  Multiple unique jobs.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
Shanghai Jiao Tong University Dept. of Industrial Engineering Production Planning and Control Professor JIANG Zhibin Department of Industrial Engineering.
1 Operation Scheduling- II The Multi-Machine Case Look! There are two machines.
1 Material Management Class Note # 3-B ~ Multiple product EPQ analysis ~ Prof. Yuan-Shyi Peter Chiu Feb
Outline Introduction Minimizing the makespan Minimizing total flowtime
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Earliness and Tardiness Penalties Chapter 5 Elements of Sequencing and Scheduling by Kenneth R. Baker Byung-Hyun Ha R1.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
1 By: Prof. Y. Peter Chiu POM Chap-8: Scheduling ~ Homework Problems ~
Scheduling.
11 -1 Chapter 12 On-Line Algorithms On-Line Algorithms On-line algorithms are used to solve on-line problems. The disk scheduling problem The requests.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
1 Job Shop Scheduling. 2 Job shop environment: m machines, n jobs objective function Each job follows a predetermined route Routes are not necessarily.
Operations Scheduling
CHAPTER 8 Operations Scheduling
The basics of scheduling
OPERATIONS SCHEDULING AND SEQUENCING
Introduction to Scheduling Chapter 1
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
IE 3265 – POM R. Lindeke Spring 2005
Presentation transcript:

Prof. Yuan-Shyi Peter Chiu Materials Management 2017/4/26 Material Management Class Note # 5 SCHEDULING Prof. Yuan-Shyi Peter Chiu Feb. 2012 Dr. Yuan-Shyi Peter Chiu

◇ § S1:Introduction Materials Management 2017/4/26 Dr. Yuan-Shyi Peter Chiu

§ S1:Introduction ◇

◇ § S5:Characteristics of Job Shop Scheduling Materials Management 2017/4/26 ◇ § S5:Characteristics of Job Shop Scheduling Dr. Yuan-Shyi Peter Chiu

◇ § S5:Objectives of Job Shop Management IT IS IMPOSSIBLE TO OPTIMIZE ALL 7 OBJECTIVES SIMULTANEOUSLY.  CUSTOMER Service Quality vs.  Plant Efficiency / Cost

◇ § S6:Flow Shop vs. Job Shop ... ...   (1) FLOW SHOP job M/C M/C M/C M/C M/C 1 2 3 4 m     .  ... n Assembly Line different M/C = different operations. (2) JOB SHOP job M/C M/C M/C M/C M/C ... 1 2 3 4 m   .  n {1, 3, 4, 1, m} {2, 4, 2, m-1} PROBLEMS are extremely complex. All-purpose solution algorithms for solving general job shop problems do not exist.

◇ § S6:Flow Shop vs. Job Shop ... ...   (3) Parallel processing vs. Sequential processing JOB M/C M/C M/C M/C ... 1 2 3 m Sequential   .  n JOB M/C M/C M/C M/C    1 3 2 m 1 3 Parallel processing ... 2 m 1 3  .  n 3

◇ § S7:Indicators of Performance Evaluation job 1 t1 = 25 sec. (1) FLOW TIME job 1 t1 = 25 sec. job 2 t2 = 13 sec. job 3 t3 = 21 sec. . (2) MEAN FLOW TIME

◇ § S7:Indicators of Performance Evaluation (3) MAKESPAN:F[n] TIME REQUIRED TO COMPLETE ALL n jobs Minimizing to the Makespan is a common objective in multiple - m/c sequencing problem. (4) TARDINESS max ( F[i] - D[i] , 0 ) where F[i] : Completion time of job i. D[i] : Job i ’s Due Date. Example : Job F[i] D[i] Tardiness 1 3 10 0 2 7 12 0 3 14 13 1 4 16 13 3

◇ § S7:Indicators of Performance Evaluation (5) LATENESS F[i] - D[i] Job F[i] D[i] Lateness 1 3 10 -7 2 7 12 -5 3 14 13 1 4 16 13 3 (6) MINIMIZING AVG. TARDINESS MAX. TARDINESS ARE COMMON SCHEDULING OBJECTIVES.

◇ § S8:Notation ti ; di  Wi = Fi - ti  Fi = Wi + ti Ti = max[Li , 0]   Li = Fi - di Ti = max[Li , 0] Ei = max[-Li , 0] Tmax = max {T1 , T2 , … , Tn} → SPT minimizes Mean flow Time. Mean waiting Time. Mean lateness. → EDD minimizes maximum lateness Lmax ~ Tmax. Lmax = max {L1 , L2 , L3 , … , Ln} 3 1 0 -3 -3 -2 -1 0

◇ Common Scheduling Rules for single machine: FCFS Shortest Processing Time (SPT) (3) Earliest Due Date (EDD) (4) CRITICAL RATIO (CR)

Example 8.2 – An example of priority rules (1) Plane 1 2 3 4 5 t[i] 26 11 19 16 23 F[i] 95 11 46 27 69 makespan = 95 SPT = {2, 4, 3, 5, 1} = 49.6 (2) Plane 1 2 3 4 5 t[i] 26 11 19 16 23 # of Passengers 180 12 45 75 252 # of Passengers per minute 6.9 1.1 2.4 4.7 10.9 49 95 84 65 23 F[i] 432 564 552 507 252 # of Passengers {5, 1, 4, 3, 2}

(3) ARRIVAL TIME = DUE TIME. 100% 90% % Passengers 76% 45% 23 49 65 time 20 40 60 80 100 (3) ARRIVAL TIME = DUE TIME. (4) PRIORITY e.g. continuing flights. low fuel level. carrying precious or perishable cargo.

◇ § S9:EDD Scheduling § S10:Moore’s (1968) algorithm minimizes the maximum lateness. ◇ § S10:Moore’s (1968) algorithm minimizes the number of Tardy jobs. Step1:Sequence by earliest due date i.e. d[1] ≦ d[2] ≦ d[3] ≦ …≦ d[n] Step2:Find the 1st tardy job in the current sequence, say job i. IF None exists go to Step 4 Step3:Consider jobs [1], [2], …, [i] Reject the job with largest tj .and Return to Step2. Step4:Current sequence + rejected job(In any order.) Applications:chef, runway, preparing exam. garage, dock.

Example 8.3 Ti = { max ( F[i] - D[i] , 0 ) } > 0 Job# 2 3 1 5 4 6 × 1 × Job# 2 3 5 4 6 di 6 9 20 23 30 ti 3 4 10 8 6 Fi 3 7 17 25 31 × × 5

Example 8.3 2 3 4 6 di 6 9 23 30 ti 3 4 8 6 Fi 3 7 15 21 Done! 2 - 3 - 4 - 6 - 5 - 1 1 - 5 2 3 4 6 5 1 di 6 9 23 30 20 15 ti 3 4 8 6 10 10 Fi 3 7 15 21 31 41

§. S10.1: Class Problems Discussion Chapter 8 : # 3, 4, 5 p.413 30, 32(a),(b), 34 p.449-450 Preparation Time : 15 ~ 20 minutes Discussion : 15 minutes

◇ § S11:Lawler’s Algorithm : Precedence min. max. gi(Fi) 1 ≦ i ≦ N gi(Fi) = Fi – di = Li min. max. Lateness. gi(Fi) = max (Fi – di , 0) Tardiness. … next to LAST LAST

◇ Example 8.4 JOBS: 1 2 3 JOB 1 2 3 4 5 6 ti 2 3 4 3 2 1 di 3 6 9 7 11 7 4 5 6

◇ Example 8.4 Total Processing time of all jobs is 15 JOBS 3 5 6 v = { 3, 5, 6 } Total Processing time of all jobs is 15 min iv min iv {gi(Fi)}= {Fi-di} = min {15-9 , 15-11 , 15-7} = min {6 , 4 , 8}= 4 ∴ JOB # 5 is scheduled last. (6th) JOBS 3 v = { 3, 6 } 6 Total Processing time is 13 min iv {gi(Fi)}= min {13-9 , 13-7}= min {4 , 6}= 4 ∴ JOB # 3 is scheduled last. (5th) So far, { … , 3 , 5}

◇ Example 8.4 JOBS 2 v = { 2, 6 } 6 Total Processing time is 9 min iv {gi(Fi)}= min {9-6 , 9-7}= 2 ∴ JOB # 6 is scheduled last. (4th) So far, { … , 6 , 3 , 5} JOBS 2 v = { 2, 4 } 4 Total Processing time is 8 min iv {gi(Fi)}= min {8-6 , 8-7}= 1 ∴ JOB # 4 is scheduled 3rd ∴ So far, { … , 4 , 6 , 3 , 5} JOBS → ∴ { , 2 , 4 , 6 , 3 , 5} JOBS → ∴ { 1 , 2 , 4 , 6 , 3 , 5} 2 1

◇ ∴ maximum tardiness is 4 days. Example 8.4 Job# ti Fi di Ti (Tardiness) 1 2 2 3 0 2 3 5 6 0 4 3 8 7 1 6 1 9 7 2 3 4 13 9 4 5 2 15 11 4 ∴ maximum tardiness is 4 days.

◇ §. S12: Class Problems Discussion Chapter 8 : # 6, 7, 8, 9 p.419 10 # 37, p.451 Preparation Time : 10 ~ 15 minutes Discussion : 10 minutes

◇ § S13:n job on m M/C’s … … … … (1) n JOBS Must BE PROCESSED ON 1 M/C’s n …….. 3 2 1 1 ……..(n-2) (n-1) n ∴ there are n! possible ways. (2) “n” JOBS Must BE PROCESSED ON “m” M/C’s n …….. 3 2 1 n!      .……. n! …….. n!   ∴ there are (n!)m possible ways. #12 p.428 M/C M/C1 M/C 2 … … … … M/C m

§ S14:Permutation schedules – characteristics It provides better system performance in terms of both total flow time ( makespan ) and average flow time ( ). mean IDLE time? (B) SCHEDULING n Jobs on 2 M/C’s : if each Jobs must be processed in the order M/C-1 then M/C-2. Results: The permutation schedule will minimize “makespan” and minimizes “ ”. (C) Theorem 8.2: (p.422) The optimal solution for scheduling n jobs on 2 M/C’s is always a permutation schedule. F F

§ S15:2 jobs on 2 M/C’s All Possible Schedules for Two Jobs on Two Machines. (B) Assumes that both jobs must be processed first on M/C#1 then on M/C#2. makespan idle flow time 9 6 10 Machine 1 I J Machine 2 I J Machine 1 J I Machine 2 J I Machine 1 J I Machine 2 I J Machine 1 I J Machine 2 J I 4 5 9 1 5 6 1 5 6 10 4 5 9 10

◇ § S16:Permutation Schedules - Definition *Permutation Schedules = Same Sequence on both (all) M/C’s Total # of permutation schedules is exactly n!

◇ § S17: Johnson’s Rule 2 M/C’s TO MINIMIZE THE MAKESPAN (1) Definition: M/C-A M/C-B Jobs must be processed first on M/C-A then M/C-B Ai : Processing Time of Job i on M/C-A Bi : Processing Time of Job i on M/C-B Job i procedes Job i+1 if min (Ai , Bi+1) < min (Ai+1,Bi) 2 M/C’s

◇ (2) Working Procedures for Johnson’s rule: 1. List the values of Ai & Bi in 2 columns. 2. Find the smallest remaining element in the 2 columns. If it appears in column A then schedule that job next. If it appears in column B then schedule that job last. 3. Cross off the jobs as they are scheduled. Stop when all jobs have been scheduled. An easy way to implement Johnson’s Rule

◇ Example 8.5 Five jobs are to be scheduled on two machines. The processing times are Jobs Machine A Machine B 1 5 2 2 1 6 3 9 7 4 3 8 5 10 4

Example 8.5 (A) (B) makespan=30 1 4 9 18 28 0 1 7 15 17 25 28 32 (A) if using SPT in Ai then obtain the above 2-4-1-3-5 _____________________________________________________ IF BY JOHSON’S ROLE TO MINIMIZE THE MAKESPAN OR TOTAL FLOW TIME. Rule: Job i precedes job i+1 if MIN(Ai,Bi+1)<(Ai+1,Bi) in 2-4-3-5-1 order A #2 #4 #3 #5 #1 B #2 #4 #3 #5 #1 1 4 13 18 28 0 1 7 15 22 23 27 28 30 (B) makespan=30

§ S18:n jobs on 3 M/C’s ◇ (A)Objective : To minimize total flow time (“make span.”) it is still true that a permutation schedule is optimal. (B) But it is not necessarily optimal for the case of F’ . (C) 3 M/C’s can be reduced to 2 M/C’s (then using Johnson’s Rule to solve it) if min Ai≧max Bi or min Ci≧max Bi “either one” of these conditions be satisfied. then define

◇ Example 8.6 Consider the following job times for a three-machine problem. Assume that the jobs are processed in the sequence A-B-C M/C’s Jobs A B C 1 4 5 8 2 9 6 10 3 8 2 6 4 6 3 7 5 5 4 11 Min Ci=6 Max Bi=6 ∴ Min Ci ≧ Max Bi let

◇ Example 8.6 Using Johnson’s Rule 5-1-4-2-3 M/C’s Jobs A’ B’ 1 9 13 1 9 13 2 15 16 3 10 8 4 9 10 5 9 15 Using Johnson’s Rule 5-1-4-2-3

5-4-1-2-3 ◇ Example 8.6 5-1-4-2-3

◇ §. S18.1: Class Problems Discussion Chapter 8 : # 13, 14 p.428 38, 40 p.451 ◆ Preparation Time : 10 ~ 15 minutes Discussion : 10 minutes

◇ § S19:more on 3 M/C’s problems and If neither ﹛min Ai ≧ max Bi Nor min Ci ≧ max Bi ﹜ Then Using and Will usually give “REASONABLE” but possibly “SUBOPTIMAL” result. Simplifying 3 M/C’s problems 2 M/C’s. (B) TO MINIMIZE “MAKESPAN” OR “TOTAL FLOW TIME” A PERMUTATION SCHEDULE IS OPTIMAL ON 3 M/C’s

◇ § S20:Akers’ procedures for solving 2 Jobs on m M/C’s problems Draw a cartesian coordinate system. Job 1 on X-axis Job 2 on Y-axis mark off the operation times on X & Y axis (2) BLOCK OUT AREAS for each M/C’s (3)Determine a path from origin to the end of the final block. move: The path with minimum vertical distance is “Optimal”.

Example 8.7 ◇ A regional manufacturing firm produces a variety of household products. One is a wooden desk lamp. Prior to packing, the lamps must be sanded, lacquered, and polished. Each operation requires a different machine. There are currently shipments of two models awaiting processing. The times required for the three operations for each of the two shipments are JOB 1 JOB 2 Oper. Time Oper. Time (A) Sanding 3 A 2 (B) Lacquering 4 B 5 (C) Polishing 5 C 3

◇ 2B 1A 2C 1B 1C 2A Example 8.7 Fig. 8-8 p.426 maximize the diagonal movement = min. horizontal vertical

◇ Fig. 8-9 p.426 Example 8.7

◇ Example 8.8

◇ Example 8.8 C B D A A1 →B1 →C1 A2 A2 ↓ C1 D2 Job 2 (BOB) 10 8 6 4 12 14 16 18 (16,14) (16,11) (7,11) A1 →B1 →C1 A2 A2 ↓ C1 D2 C2←D1←D1 ←D2 C2 B2 Time=16+1+3=20 C Job 2 (BOB) B D A Job 1 (Reggie) A2 →D2 →B2 →C2 →C2 →C2 →C1 →D1 A1 A1 A1 B1 Time=16+4+3=23

◇ §. S21: Class Problems Discussion Chapter 8 : # 15,16 p.428 39 p.452 Preparation Time : 25 ~ 30 minutes Discussion : 20 minutes

◇ The End § S22:Parallel processing on identical M/C’s. Materials Management 2017/4/26 ◇ § S22:Parallel processing on identical M/C’s. SPT → minimize mean flow time. LPT → minimize total flow time, or makespan. ( longest ) The End Dr. Yuan-Shyi Peter Chiu

Materials Management 2017/4/26 Scheduling Preview : Chap. 8 [ pp.413~442 ] Problem: # 5, #32(a),(b), #7, #8, #10, #37, #40, #39, #14, #15, #16 Dr. Yuan-Shyi Peter Chiu