Lecture 20 Production Activity Control (Revision)

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Chapter 17 Scheduling.
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Operations Scheduling
1 Session 15 Production Activity Control PAC in the MPC System –Shop Floor Control –Vendor Scheduling Production Activity Control Techniques –Basic Data.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 16 Scheduling.
Operations Scheduling
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Chapter 17 Scheduling Brian – THE JEANS SUPPLY CHAIN IMAGE GOES HERE
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Production Scheduling
Short-Term Scheduling
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
Operations Management
Roberta Russell & Bernard W. Taylor, III
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 13 Scheduling To Accompany.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Lecture 13 Production Activity Control
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 6 th Edition Chapter 17 Roberta.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Basics of Supply Chain Management
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
Lecture 14 Production Activity Control (Continued) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming.
Production Activity Control
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling Operations
Inputs and Outputs to Aggregate Production Planning
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Production and Operations Management
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Lecture 20 Production Activity Control (Revision) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus, Stephen N. Chapman, Ph.D., CFPIM, North Carolina State University, Lloyd M. Clive, P.E., CFPIM, Fleming College Operations Management for Competitive Advantage, 11th Edition, by Chase, Jacobs, and Aquilano, 2005, N.Y.: McGraw-Hill/Irwin. Operations Management, 11/E, Jay Heizer, Texas Lutheran University, Barry Render, Graduate School of Business, Rollins College, Prentice Hall

Objectives Production activity control Gantt chart Critical ratio scheduling Finite loading Scheduling Assignment method Sequencing Slack Johnson's Rule Monitoring Advance planning and scheduling Scheduling procedure Employee Scheduling

Production Activity Control PAC in the MPC System Shop Floor Control Vendor Scheduling Production Activity Control Techniques Basic Data Gantt Charts Priority Scheduling Finite Loading Process Design Impact on Scheduling Batch Manufacturing – Work Orders Repetitive Manufacturing – JIT

Production Activity Control in the MPC System

Basic Data

Routing Data and Operation Setback Chart

Gantt Charts _____________________________________________________ The incoming orders at Tom's Sailboard follow different routes through the shop but all orders must stop at each of the three work centers in the plant. The table below shows all tasks for four jobs that arrive over 5 days and need to be scheduled at the company. It is currently November 10 and Tom works a seven-day week. _____________________________________________________ Arrival Job/WC Processing time (days) Order date routing WC 1 WC 2 WC 3 (B)iff Nov. 10 1-3-2 1 3 1 (G)riffin Nov. 10 2-3-1 2 2 2 (H)erbie Nov. 12 3-2-1 3 1 2 (K)errie Nov. 14 2-1-3 1 3 1 Assume that the new material for all orders is in stock and that a first-come/first-served sequencing rule is used at all work centers. All three work centers are idle as work begins on orders B and G on November 10.

Tom’s Sailboard Construct a Gantt chart depicting the processing and idle times for the three work centers for these four jobs. Arrival Job/WC Processing time (days) Order date routing WC 1 WC 2 WC 3 (B)iff Nov. 10 1-3-2 1 3 1 (G)riffin Nov. 10 2-3-1 2 2 2 (H)erbie Nov. 12 3-2-1 3 1 2 (K)errie Nov. 14 2-1-3 1 3 1

Tom’s Sailboard How many days does each job wait in queue for processing at work center 2? The determination of how long jobs wait at work center 2 is as follows: B and G are processed immediately at work center 2, order K must wait 1 day (11/14) and order H waits 4 days (11/12, 11/13 at WC3) and (11/16 and 11/17 at WC2).

Priority Sequencing Rules First Come, First Served Shortest Operation Next Earliest Due Date Order Slack: (Time Remaining until Due Date – Sum of Remaining Setup and Run Time) Slack per Operation Critical Ratio: (Due Date-Now)/(Lead Time Remaining) ________________________________________ Lead Time Remaining includes setup, run, move and queue time for all remaining operations.

__________________________ Knox Machine The jobs below are waiting to be processed at the P&W Grinder at the Knox Machine Company. (There are no other jobs and the machine is empty.) __________________________ Machine processing Date job arrived Job due Job time (in days)*__ at this machine date__ A 4 6-23 8-15 B 1 6-24 9-10 C 5 7-01 8-01 D 2 6-19 8-17 *Note: This is the final operation for each of these jobs. ___________________________________________________________

Knox Machine: Solution The production manager has heard about three dispatching rules: the Shortest Operation Next Rule, the First-Come/First-Served Rule, and the Earliest Due Date Rule. In what sequence would these jobs be processed at the P&W grinder if each rule was applied? The shortest operation next rule: B-D-A-C The first-come, first-served rule: D-A-B-C The earliest due date rule: C-A-D-B Machine processing Date job arrived Job due Job time (in days)*__ at this machine date__ A 4 6-23 8-15 B 1 6-24 9-10 C 5 7-01 8-01 D 2 6-19 8-17 *Note: This is the final operation for each of these jobs.

Knox Machine: Solution If it's now the morning of July 10 and the Shortest Operation Next Rule is used, when would each of the four jobs start and be completed on the P&W grinder? (Express your schedule in terms of the calendar dates involved, assuming that there are 7 working days each week.) P & W Grinder Job B D A C Date 7/10 7/11 7/12 7/13 7/14 7/15 7/16 7/17 7/18 7/19 7/20 7/21

Critical Ratio Scheduling Eight weeks remain for constructing the a 50­foot yacht. Assume that each week consists of 5 work days, for a total lead time of 40 days. The work required to complete the yacht comprises 10 operations, 4 days for each.

Yacht Project Example On Tuesday morning of week 3, 3 of the 10 operations had been completed and the yacht was waiting for the fourth operation. What's the critical ratio priority?

Yacht Project Example What's the critical ratio priority if only 2 of the 10 operations are completed by Tuesday morning of week 3?

Finite Loading

The Bundy Company The Bundy Company produces for three products (A, K, and P). Each order goes through the same three machine centers, but not necessarily in the same sequence. Each order must be finished at a machine center before another can be started. Orders cannot be split. The shop works a single eight-hour shift five days per week. Assume that the time to move between machines is negligible. each machine center is operated eight hours per day. All three machines are currently available for scheduling, and no further orders will arrive.

The Bundy Company Processing time Machine at machine center center ___(in days)____ Order Order routing 1 2 3 due date A 3-1-2 1 3 2 14 K 2-3-1 3 1 3 12 P 3-2-1 2 3 4 10 Note: Order due dates are fixed based on the shop calendar. It is now 8:00 A.M. Monday (day 1), Monday of next week is day 6, etc.

The Bundy Company Using the horizontal loading procedure with earliest-due-date priority sequencing rule, prepare a Gantt chart showing the production schedule for the three orders above.

The Bundy Company Using the vertical loading procedure and the shortest-operation-next priority sequencing rule, prepare a Gantt chart showing the production schedule for the three orders above.

Scheduling

What is Scheduling? Last stage of planning before production occurs Specifies when labor, equipment, and facilities are needed to produce a product or provide a service

Scheduled Operations Batch Production Process Industry Aggregate planning Master scheduling Material requirements planning (MRP) Capacity requirements planning (CRP) Process Industry Linear programming EOQ with non-instantaneous replenishment Mass Production Assembly line balancing Project Project -scheduling techniques (PERT, CPM)

Objectives in Scheduling Meet customer due dates Minimize job lateness Minimize response time Minimize completion time Minimize time in the system Minimize overtime Maximize machine or labor utilization Minimize idle time Minimize work-in-process inventory

Shop Floor Control (SFC) Schedule and monitor day-to-day job shop production Also called production control and production activity control (PAC) Performed by production control department Loading - check availability of material, machines, and labor Sequencing - release work orders to shop and issue dispatch lists for individual machines Monitoring - maintain progress reports on each job until it is complete

Loading Process of assigning work to limited resources Perform work with most efficient resources Use assignment method of linear programming to determine allocation

Assignment Method Perform row reductions Perform column reductions subtract minimum value in each row from all other row values Perform column reductions subtract minimum value in each column from all other column values Cross out all zeros in matrix use minimum number of horizontal and vertical lines If number of lines equals number of rows in matrix, then optimum solution has been found. Make assignments where zeros appear Else modify matrix: subtract minimum uncrossed value from all uncrossed values add it to all cells where two lines intersect other values in matrix remain unchanged Repeat steps 3 and 4 until optimum solution is reached

Assignment Method Initial PROJECT Matrix 1 2 3 4 Bryan 10 5 6 10 Kari 6 2 4 6 Noah 7 6 5 6 Chris 9 5 4 10 Row reduction Column reduction Cover all zeros 5 0 1 5 3 0 1 4 3 0 1 4 4 0 2 4 2 0 2 3 2 0 2 3 2 1 0 1 0 1 0 0 0 1 0 0 5 1 0 6 3 1 0 5 3 1 0 5 Number lines  number of rows so modify matrix 12

Assignment Method Modify matrix Cover all zeros 1 0 1 2 1 0 1 2 1 0 1 2 1 0 1 2 0 0 2 1 0 0 2 1 0 3 2 0 0 3 2 0 1 1 0 3 1 1 0 3 Number of lines = number of rows so at optimal solution 1 2 3 4 Bryan 1 0 1 2 Kari 0 0 2 1 Noah 0 3 2 0 Chris 1 1 0 3 PROJECT Bryan 10 5 6 10 Kari 6 2 4 6 Noah 7 6 5 6 Chris 9 5 4 10 Project Cost = (5 + 6 + 4 + 6) X $100 = $2,100 12

Assignment Method - Setup Solution goes here Only 1 leader can be assigned to each project Click “Solve” for solution Sum of all rows and columns = 1

Assignment Method - Solution Assignments indicated by 1 Cost of solution

Sequencing Prioritize jobs assigned to a resource If no order specified use first-come first-served (FCFS) Other Sequencing Rules FCFS - first-come, first-served LCFS - last come, first served DDATE - earliest due date CUSTPR - highest customer priority SETUP - similar required setups SLACK - smallest slack CR - smallest critical ratio SPT - shortest processing time LPT - longest processing time

Minimum Slack & Smallest Critical Ratio SLACK considers both work and time remaining CR recalculates sequence as processing continues and arranges information in ratio form SLACK = (due date – today’s date) – (processing time) time remaining due date - today’s date work remaining remaining processing time CR = = If CR > 1, job ahead of schedule If CR < 1, job behind schedule If CR = 1, job on schedule

Sequencing Jobs Through One Process Flow time (completion time) Time for a job to flow through system Makespan Time for a group of jobs to be completed Tardiness Difference between a late job’s due date and its completion time

Simple Sequencing Rules PROCESSING DUE JOB TIME DATE A 5 10 B 10 15 C 2 5 D 8 12 E 6 8

Simple Sequencing Rules: FCFS A 0 5 5 10 0 B 5 10 15 15 0 C 15 2 17 5 12 D 17 8 25 12 13 E 25 6 31 8 23 Total 93 48 Average 93/5 = 18.60 48/5 = 9.6 FCFS START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS

Simple Sequencing Rules: DDATE B 21 10 31 15 16 Total 75 28 Average 75/5 = 15.00 28/5 = 5.6 DDATE START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS

Simple Sequencing Rules: SLACK B (15-0) – 10 = 5 C (5-0) – 2 = 3 D (12-0) – 8 = 4 E (8-0) – 6 = 2 SLACK START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS E 0 6 6 8 0 C 6 2 8 5 3 D 8 8 16 12 4 A 16 5 21 10 11 B 21 10 31 15 16 Total 82 34 Average 82/5 = 16.40 34/5 = 6.8

Simple Sequencing Rules: SPT SPT START PROCESSING COMPLETION DUE SEQUENCE TIME TIME TIME DATE TARDINESS C 0 2 2 5 0 A 2 5 7 10 0 E 7 6 13 8 5 D 13 8 21 12 9 B 21 10 31 15 16 Total 74 30 Average 74/5 = 14.80 30/5 = 6

Simple Sequencing Rules: Summary AVERAGE AVERAGE NO. OF MAXIMUM RULE COMPLETION TIME TARDINESS JOBS TARDY TARDINESS FCFS 18.60 9.6 3 23 DDATE 15.00 5.6 3 16 SLACK 16.40 6.8 4 16 SPT 14.80 6.0 3 16 Best values

Sequencing Jobs Through Two Serial Process Johnson’s Rule List time required to process each job at each process. Set up a one-dimensional matrix to represent desired sequence with # of slots equal to # of jobs. Select smallest processing time at either process. If that time is on process 1, put the job as near to beginning of sequence as possible. If smallest time occurs on process 2, put the job as near to the end of the sequence as possible. Remove job from list. Repeat steps 2-4 until all slots in matrix are filled and all jobs are sequenced.

Sequencing With Excel

Johnson’s Rule C E A B D JOB PROCESS 1 PROCESS 2 A 6 8 B 11 6 C 7 3

Johnson’s Rule A B C D E Completion time = 41 Idle time = 5+1+1+3=10 E Process 1 (sanding) 5 11 20 31 38 Process 2 (painting) 15 23 30 37 41 Idle time Completion time = 41 Idle time = 5+1+1+3=10

Excel for Johnson’s Rule User inputs processing times and sequence Excel calculates completion times and makespan When the set of jobs is completed

Guidelines for Selecting a Sequencing Rule SPT most useful when shop is highly congested Use SLACK for periods of normal activity Use DDATE when only small tardiness values can be tolerated Use LPT if subcontracting is anticipated Use FCFS when operating at low-capacity levels Do not use SPT to sequence jobs that have to be assembled with other jobs at a later date

Monitoring Work package Shop paperwork that travels with a job Gantt Chart Shows both planned and completed activities against a time scale Input/Output Control Monitors the input and output from each work center

Gantt Chart 1 2 3 4 5 6 8 9 10 11 12 Days Today’s Date Job 32B Job 23C Job 12A Facility Key: Planned activity Completed activity Behind schedule Ahead of schedule On schedule

Input/Output Control PERIOD 1 2 3 4 TOTAL Planned input 65 65 70 70 270 Actual input 0 Deviation 0 Planned output 75 75 75 75 300 Actual output 0 Backlog 30 PERIOD 1 2 3 4 TOTAL 20 10 5 0

Input/Output Control PERIOD 1 2 3 4 TOTAL Planned input 65 65 70 70 270 Actual input 60 60 65 65 250 Deviation -5 -5 -5 -5 -20 Planned output 75 75 75 75 300 Actual output 75 75 65 65 280 Deviation -0 -0 -10 -10 -20 Backlog 30 15 0 0 0 PERIOD 1 2 3 4 TOTAL

Excel for Input/Output Control User inputs planned and actual values Excel calculates deviations and backlog

Advanced Planning and Scheduling Systems Infinite scheduling - assumes infinite capacity Loads without regard to capacity Then levels the load and sequences jobs Finite scheduling - assumes finite (limited) capacity Sequences jobs as part of the loading decision Resources are never loaded beyond capacity

Advanced Planning and Scheduling Systems Advanced planning and scheduling (APS) Add-ins to ERP systems Constraint-based programming (CBP) identifies a solution space and evaluates alternatives Genetic algorithms based on natural selection properties of genetics Manufacturing execution system (MES) monitors status, usage, availability, quality

Advanced Planning and Scheduling

Theory of Constraints Not all resources are used evenly Finite scheduling approach Concentrate on the” bottleneck” resource Synchronize flow through the bottleneck Use process and transfer batch sizes to move product through facility

Drum-Buffer-Rope Drum Buffer Rope Bottleneck, beating to set the pace of production for the rest of the system Buffer Inventory placed in front of the bottleneck to ensure it is always kept busy Determines output or throughput of the system Rope Communication signal; tells processes upstream when they should begin production

Synchronous Manufacturing B A C D B1 1 5 B2 2 3 B3 1 7 C1 3 2 C2 1 10 C3 2 15 D1 3 10 D2 2 8 D3 3 5 Item i Key: i Ij k l Operation j of item i performed at machine center k takes l minutes to process

Synchronous Manufacturing Demand = 100 A’s Machine setup time = 60 minutes MACHINE 1 MACHINE 2 MACHINE 3 B1 5 B2 3 C1 2 B3 7 C3 15 D3 5 C2 10 D2 8 D1 10 Sum 22 26* 17 * Bottleneck

Synchronous Manufacturing Machine 1 Machine 3 Setup Completion time 1002 2322 12 2732 200 1260 1940 2737 C2 B1 B3 C3 B2 D2 C1 D1 D3 Idle 1562 1512 1872 Machine 2 2

Employee Scheduling Labor is very flexible resource Scheduling workforce is complicated, repetitive task Assignment method can be used Heuristics are commonly used

Employee Scheduling Heuristic Let N = no. of workers available Di = demand for workers on day i X = day working O = day off Assign the first N - D1 workers day 1 off. Assign the next N - D2 workers day 2 off. Continue in a similar manner until all days are have been scheduled If number of workdays for full time employee < 5, assign remaining workdays so consecutive days off are possible Assign any remaining work to part-time employees If consecutive days off are desired, consider switching schedules among days with the same demand requirements

Employee Scheduling DAY OF WEEK M T W TH F SA SU MIN NO. OF WORKERS REQUIRED 3 3 4 3 4 5 3 Taylor Smith Simpson Allen Dickerson

Employee Scheduling DAY OF WEEK M T W TH F SA SU MIN NO. OF WORKERS REQUIRED 3 3 4 3 4 5 3 Taylor O X X O X X X Smith O X X O X X X Simpson X O X X O X X Allen X O X X X X O Dickerson X X O X X X O Completed schedule satisfies requirements but has no consecutive days off

Employee Scheduling DAY OF WEEK M T W TH F SA SU MIN NO. OF WORKERS REQUIRED 3 3 4 3 4 5 3 Taylor O O X X X X X Smith O O X X X X X Simpson X X O O X X X Allen X X X O X X O Dickerson X X X X O X O Revised schedule satisfies requirements with consecutive days off for most employees

End of Lecture 20