Slide 1 Subpart O What’s Working & What’s Not Deepwater Operations Conference and Exhibition November 10-12, 2009.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
Managing the Health and Safety of Contractors
Short Service Worker Program
Checking & Corrective Action
ONIT Consulting LLC Who’s on your project? Q9 Initiative Presented by: Anna Gabara.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
More CMM Part Two : Details.
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
GCEAG Meeting January 12,  NPR Issued September 14, 2011  Comments were due November 14, 2011  Focuses on six new or expanded items  Stop work.
EPSON STAMPING ISO REV 1 2/10/2000.
Contractor Safety Management
Establish Verification Procedures (Task 11 / Principle 6)
Contractor Management and ISO 14001:2004
Quality evaluation and improvement for Internal Audit
Human Resource Auditing
Supplier Ethics: Program Checklist
FPSC Safety, LLC ISO AUDIT.
ISO 9000 Certification ISO 9001 and ISO
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Gulf of Mexico Challenges with Contractor Verification - Skills and Knowledge.
BUILD WITH US. ™ Contractors
OH 5-1 Hiring and Orienting New Employees Human Resources Management and Supervision 5 OH 5-1.
Codex Guidelines for the Application of HACCP
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Security Information Management Firewall Management, Intrusion Detection, and Intrusion Prevention Intrusion Detection Busters Katherine Jackowski Elizabeth.
NACMPI November 15-16, 2005 Risk-Based Inspection Dr. Barbara Masters Administrator, Food Safety and Inspection Service Philip Derfler Assistant Administrator,
QSIT Management Controls QSIT Workshops. Management Controls u Importance u Assessment u Demonstration of Compliance.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
(CAPE TOWN, SOUTH AFRICA, JULY 2011) THIRD PAN-AFRICAN AVIATION TRAINING COORDINATION CONFERENCE AFRICAN CIVIL AVIATION COMMISSION (AFCAC ) Requirements.
Section Five: Security Inspections and Reviews Note: All classified markings contained within this presentation are for training purposes only.
Setting up an Internal Audit Program By
Chapter 3 資訊安全管理系統. 4.1 General Requirements Develop, implement, maintain and continually improve a documented ISMS Process based on PDCA.
QUALITY OF EVIDENCE FRCC Compliance Workshop September/October 2008.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Office of Pipeline Safety Qualifications of Individuals: Protocol Review Integrity Management Workshop July 23-24, 2002.
Chapter 9 Training. Introduction Training is a career-long commitment that all emergency service personnel must make We must gather and examine information.
Hazards Identification and Risk Assessment
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
QUALITY MANAGEMENT STATEMENT
MMS: Securing Ocean Energy & Economic Value for America Gulf Coast Environmental Affairs Group January 14, 2010 Galveston, Texas Civil Penalty Program.
Industry Response - Deepwater Horizon
Hunter Douglas Corporate Safety Conference
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
OHSAS Occupational health and safety management system.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
Oversight “The NPPO of the exporting country has the responsibility for ensuring that systems for exports meet the requirements …”
Good Laboratory Practice - general information Pirkko Puranen Senior Inspector, Ph.D. Inspectorate.

(CAPE TOWN, SOUTH AFRICA, JULY 2011)
Introduction to Internal Audits
Setting up an Internal Audit Program
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
CDE Transportation Unit
UNDERSTANDING FOR STANDARD
Developing a Comprehensive Electrical Program
Quality Assurance for Emulsified Asphalt Surface Treatments
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
2010 Audit Summary Results YEAR 100% Verified Failed Reduced 2010
System Safety Regulation
Radiopharmaceutical Production
Presentation transcript:

Slide 1 Subpart O What’s Working & What’s Not Deepwater Operations Conference and Exhibition November 10-12, 2009

Slide 2 Proposed rule published in 1999 Final rule published 2000 Rule in effect since 10/15/2002 Performance based regulation Audits, interviews, and testing used to gauge industry compliance 146 Audits (GOM OCS) 150 INCs Subpart O History

Slide 3 Subpart O Statistics Total* Audits INCs * Includes data

Slide 4 Top Five Subpart O INCs G842 (4)G846 (4)G846 (7) G846 (10) G851 (3)G852 (2)G851 (7)G844 (6)G847 (4) G850 (2)G862 (2)G842 (5)G851 (6)G842 (3) G852 (2)G847 (3)G847 (5)G851 (3) G862 (2)G852 (3)G852 (5)G852 (2)

Slide 5 G842 – Can the lessee explain its overall program and produce evidence to support its explanation? G846 – Does the plan include procedures for evaluating the contractors programs and is there evidence indicating the evaluations are being conducted? G847 – Does the plan include procedures for internal audits and is there evidence indicating that the audits are being conducted? Repeat Subpart O INCs

Slide 6 G851 – Does the lessee ensure that the contractor’s program provides for periodic training and verification of knowledge and skills? G852 – Does the plan include procedures for verifying that all contractor personnel can perform their assigned duties and is there evidence indicating that all contractor personnel have been verified? Repeat Subpart O INCs

Slide 7 G844 – Does the plan specify the type, length, method, frequency, and content of the training? G850 – Are procedures established to verify adequate retention of knowledge and skills and is there evidence to support this? G862 – Does the lessee provide copies of training documentation for personnel for the past five years? Other Subpart O INCs

Slide 8 Clarifies – –Definitions Internal audits Production safety Periodic Contractor –Lessee responsibilities w/r/t contractors –Lessee evaluations of contractor training programs and verification of contractor employees –Lessee responsibilities w/r/t direct employees –Testing NTL 2008-N03

Slide 9 Lessee Responsibilities w/r/t Contractors –1501 requires you to ensure that your contract personnel engaged in well control or production safety operations understand and can perform their assigned duties. –1503(b)(2) requires that you evaluate the training program of your contractor(s). –1503(b)(3) requires that you verify that all contractor personnel can perform their assigned duties. –1506(c) requires you to ensure that your contractor’s training program provides for periodic training and verification of knowledge and skill. (This step can be/should be part of your procedures required by 1503(b)(2)) NTL 2008-N03

Slide 10 Lessee Verification of Contractor Personnel Training as required by 1503(b)(3) –Administer a written, oral, or hands-on test. –Review a contractor’s certificate of completion-of- training, provided you understand the criteria used by the contractor for determining if the training was successfully completed. –Review an electronic or hardcopy spreadsheet of contractor personnel training information, provided you are confident that the spreadsheet is accurate and up-to-date. NTL 2008-N03

Slide 11 Lessee Responsibilities w/r/t direct employees –Procedures for training your employees. Include the type, length, frequency, method, and content of the training. –Procedures for verifying that your employees can perform their assigned duties. Verify adequate retention of knowledge Assess the training needs of your employees. NTL 2008-N03

Slide 12 Contractor Responsibilities The contractor is responsible for training its employees to perform their well control or production safety operations responsibilities. –Include plan/process for periodic training. –Verify knowledge and skill of their employees

Slide 13 Operators with both company personnel and contractor personnel. –Had very good program w/r/t company personnel –Did poorly with respect to contractor by imposition of certain “requirements/restrictions” on the contractor. Operators with contractor personnel only –Relied on contractors’ programs to satisfy Sub O requirements. –Relied too heavily on consultants to educate them in the rule requirements (included in the written plan). –Failed to implement their plan as stated. Problem Areas

Slide 14 Operators and contractors continue to focus training efforts on the standard PSST. Little to no effort is exhibited in the area of training in production operations. Operators, contractors, and service companies do not fully understand the application of the rule to their operations. –Wireline operators –Coiled tubing/snubbing operators –Fire/Gas Detection technicians –Compressor mechanics/technicians Problem Areas

Slide Forward MMS will continue to audit companies Triggers –Poor performance –Incident root causes –Bad inspection –Random selection Will be looking more and more at the operations on the facilities.

Slide Forward Audit Tools –Plan review –Records review Contractor evaluations Contractor verifications Employee verifications Internal audits –Testing PSST Well control Production operations

Slide 17 Thank You