ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
P5: UJ56 Relocation Study Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE
Barriere O, Le Roux P
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
EN-CV interventions during YETS
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
V. Bobillier1 Cable installation status.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
The Next Generation of a Gamma Irradiation Facility GIF++
CLIC Civil Engineering Update
News from Integration WG
$150K Chicago/ANL seed funding for Braidwood site investigation
Tunnel Cross Section Studies
CMS Area Working Group Meeting
Proposed New CMS Conference Room on first floor of SHL
Budget specification EHN1 Extension: Infrastructure (WG2)
Helium spill in LHC tunnel
Update on the Ethernet Network Installation Campaign
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
A very first look at siting issues
COOLING & VENTILATION INFRASTRUCTURE
Review of UJ56 relocation options
Collimator Control (SEUs & R2E Outlook)
Extract from today’s talk given to DCB
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC

UXC55 USC55 Pillar Wall UPX56 Shelter PM56 26/05/20102 UP56 UJ56 UJ561 UJ561?

Proposed CE work: forming a gallery between PM56 shelter and UPX56 → Length ≈ 5 m→Width ≈ 2.3m→Height ≈ 2.3m →Equipment: Hydraulic hammers possibly small excavator →Duration: Excavation + lining ≈ 2 to 3 months →Cost estimate: 0.5MCHF

26/05/20105 Services difficult to relocate Remaining issues to clarify: →What is the best path for the gallery to connect with UJ56 →Modification of metallic staircase →Relocation of services in the way of gallery (CV, EL, ASE...) →Could this be avoided →How to evacuate spoil and ventilate worksite: J Osborne to assess situation and make recommendations →Safety issues: Green light from G Roy & CMS GLIMOS →Access control issues: Installation of a new interlocked blast door + move of existing UJ561 sector door + changes in LACS + update of documentation: Estimated cost to be produced by S Di Luca and CEGELEC

26/05/20107 UJ56 1 st floor 24 racks How many racks need to be relocated and where should they go (USC55 vs UJ561)? List to be put together by M Gastal & JC Guillaume Rack owners will be contacted in turn.

Status so far: 24 racks currently installed 6 racks would stay in the UJ56 11 racks would be relocated

26/05/20109 UJ56 1 st floor Power converters TE-EPC to be contacted to collect feedback on proposal to relocate PCs to UJ561 C Coupat 25/05: Solution proposed is acceptable Space required around equipment for installation and maintenance C Coupat 25/05: 1.4m of space in front of front space

26/05/ UJ56 1 st floor 24 racks + Power converters What power dissipation is to be expected from rack + Pconverters? Guideline for relocation and impact on CV systems G Peon to be contacted by M Gastal

26/05/ UJ56 Gnd Floor How many CV pieces of equipment need to move? G Ducret met on 16:00 PLC for UJ56 and tunnel ventilation Preference for relocation in USC55 “ctrl room area” Switchboard for water pumps “eau brute”, used for fire fighting Preference for relocation on surface

26/05/ Additional shielding: width calculated to be 1m possibly with a 40cm roof shielding

→ Can the slab sustain the additional weight? → Consultant to be commissioned by GS-SEM → Cavern floor is founded directly on rock → Total compression force produced by shielding would only be a very small percentage of what concrete can take. → Could we build a shielding roof of 40cm? From CE point of view YES

26/05/ Additional shielding: → How can the shielding wall be assembled? → No crane available → Do we need to remove cable trays under false floor? → Where should the safe room equipment be stored during erection of the wall? → Do we need to remove the metallic structure of the 1 st floor? → New generations of switchboards to be foreseen

26/05/ New layout of the safe room: → How do we maintain the General Services, safety lights, AUG system during the re-organisation of the safe room? → Could the 48V network be hooked up on CMS? → Should the ventilation system be modified? Y Body to give advice → All pieces of equipment are cooled down by air

26/05/ Increasing the cable tray capacity between UJ56 and UP56 → Insertion of service ducts through coring – 40cmØ & 8m long. → 4000CHF/m → How many will we need? 4 as first approximation → Impact on ventilation and air flows? → Radiation protection implications? Smaller Ø preferred ~25cm Cooled cables Ctrl cables DC Power cables

26/05/ Increasing the cable tray capacity between UJ56 and UP56 → How to resolve the bottle neck in UP56? → New idea: reduce the size of the ventilation duct Cooled cables Ctrl cables DC Power cables

26/05/ Increasing the cable tray capacity between UJ56 and UP56 → How to resolve the bottle neck in UP56? → New idea: reduce the size of the ventilation duct DC Power cables Inject fresh air from USC55

26/05/ Increasing the cable tray capacity between UJ56 and UP56 → Modify t UP56 lining Smoother edge Only very small chamfer possible without affecting the structural stability of the tunnel

26/05/ Optimisation of space occupancy in UP56 → How much equipment can be brought in? → Space budget? → Cooling budget? → PConvs cooled by water → Racks cooled by air → What new CV systems (chilled/mixed water) should be installed?

26/05/ Optimisation of space occupancy in UP56 → How should the ventilation system be modified? → Needed if unified UJ561? → Sections of partition wall could be removed

26/05/ Optimisation of space occupancy in UP56 → How should the ventilation system be modified? → Needed if unified UJ561? → Sections of partition wall could be removed → Fresh air supplied by USC55 and/or UL55 → Extraction through ventilation gallery (new opening) → Sector door to be moved to UP56 → Should we add sector doors to close off the bypass? Access to the modified UJ561 would be more restrictive than the access required for UJ56

Reinforcement steel bars are linked to the crown of the tunnel. Removing the wall might induce rock settlements, cracking. GS-SEM could further investigate using consultant... Openings could still be considered

26/05/ Optimisation of space occupancy in UP56 → Ho w much cable tray capacity can be found if ventilation duct can be spared → How do we handle pieces of equipments during the relocation? → Installation of a fire detection system → On what side should the cable trays to USC55 ctrl room be installed?

26/05/ Link between UJ561 and USC55 control room → What should be the position of the service duct? → What thermal load would be brought on to the USC55? → Water cooling: none → Ventilation?

Underground Ctrl room USC racks (uj56 du 1 er ) → Integration to be studied  Draft 3D model of Mezzanine control room to be prepared for presentation at CMS

Top Of CV room USC /05/2010 Relocation on top of CV room: → What equipment could be brought to this area? → Eg: DYXE01 (DFBX S45) → What space is required to change ventilation filters (EN-CV)?

26/05/ Goals for week 21: Start putting list of racks to be moved from UJ56 together GS-ASE - Jean-Francois Juget – 4 racks to remain in UJ56 – 1 rack to be relocated in USC55 (PP + new cables) TE-MPE - Reiner Denz – 2 racks to be relocated in UJ561 (new cables) EN-STI - Jerome Lendaro – BE-ABP - Helene Mainaud Durand – BE-BI - Enrico Bravin – Get an estimate of the impact on the ventilation capabilities of moving all power converters + 15 racks into the UJ561 Launch the UJ56 slab loading study Start assessing the proposed ventilation scheme for the modified UJ561

R2E relocation scheme at Point 5 Type of equipment:Rack: Other: Equipment owner (group): Rack name: Rack content: Crate(s): Patch panel(s): Other: Constraints: Max Cable length: Proximity to other equipment: Part of a larger infrastructure system: Safety aspects: Other: Candidate location(s) for relocation: Current configuration: Future configuration: Work to be done for implementation: Impact of equipment disconnection: Time estimates for work execution: Cost estimates

Goals for week 22: Putting list of racks to be moved from UJ56 together TE-CRG - Juan Casas-Cubillos 2 racks to move to UJ561 or USC55 ctrl room + 1 rack to stay TE-MPE – Richard Mompo 1 rack to move in USC55 top of CV room IT-CS - Eric Sallaz 14:00 2 racks to move to UJ561 TE-MPE – Bruno Puccio & Markus Zerlauth 15:00 1 rack to move to USC55 top of CV room 1 rack to move to UJ561 BE-CO – Julien Palluel 16:00 1 Rack to move to UJ561 or USC55 ctrl room DGS-RP - Stefan Roesler 14:00 Get constraints on cable length and Ø from GS-ASE Get an estimate of the impact on the ventilation capabilities of moving all power converters + 15 racks into the UJ561 Launch the UJ56 slab loading study: Done Start assessing the proposed ventilation scheme for the modified UJ651

Goals for week 23: Putting list of racks to be moved from UJ56 together BE-BI: E Bravin 14:00 EN-CV: Y Body + G Ducret Get constraints on cable length and Ø from GS-ASE Get an estimate of the impact on the ventilation capabilities of moving all power converters + 15 racks into the UJ561 Start assessing the proposed ventilation scheme for the modified UJ651