US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.

Slides:



Advertisements
Similar presentations
ISO Adult PIT Interrogation System Installations BPA Project Number July
Advertisements

US Army Corps of Engineers Budgeting Process
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
BUILDING STRONG ® AVIAN ABUNDANCE AND DETERRENT MEASURES AT NWW & NWP DAMS US Army Corps of Engineers BUILDING STRONG ® FPOM – Subgroup: Inland Avian WG.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
US Army Corps of Engineers Spill Response at Hydropower Projects
SAME “Meet the Chiefs” Don Erickson, P.E., PMP
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
Winter Leader Conference February 4, 2009 “ Building Strong “1 The FY 2011 CW Program Mr. Pete Luisa 1 March 2010 PNWA.
Lake Como Rehabilitation City of Bloomer Joseph M. Dorava, PE - Vierbicher Associates Bloomer Community Lake Association and Bloomer Rod and Gun Club Public.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Columbia River Lock Users Meeting Portland District Corps of Engineers August 14, 2007 US Army Corps of Engineers Portland District Portland District.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Columbia Snake River System. Chart: Columbia River Channel Coalition Oregon Columbia Snake River System 110 mile 40-foot deep draft channel 30 million.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
COLUMBIA RIVER SYSTEM OVERVIEW
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Pacific Northwest Waterways Association 2008 MID-YEAR MEETING Inland Project Report: Little Goose, Lower Monumental, the PSMP and the Five Year Funding.
US Army Corps of Engineers BUILDING STRONG ® Seattle SAME “Meet the Chiefs” COL Steve Miles, P.E., PMP 21 June, 2011.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Small and Large Business Federal Opportunities Meet the Chiefs Workshop June 3, 2015.
Module 10 Step 3 Initial Study Funding (incl. Civil Works Budget Process) Civil Works Orientation Course - FY 11.
SAME “Meet the Chiefs” LTC Shawn Patrick Deputy Commander
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District SAME 21 June 2011 David A. Caldwell, Lieutenant Colonel Commander and District Engineer.
Mouth of the Columbia River Jetties Major Rehabilitation.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
US Army Corps of Engineers BUILDING STRONG ® Portland District - Navigation Update COL Steve Miles Commander Portland District PNWA Annual Meeting 13 October.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
Permitting Lessons Learned: How to Make the Most of Your Agency Partnerships October 15, 2008 Marla Harrison, Environmental Manager.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
USACE Northwestern Division Leadership
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Glenn Vanselow Executive Director Kristin Meira Government Relations Director Heather Kenneson Communications Manager PNWA Staff Update.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
C-17 Program Description Three Contracts (All Solicited prior to 1 Jan 04) – Development – Production – Sustainment 180 Aircraft by Aug 08/126 currently.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
Inland Navigation - A National Perspective Jim Walker USACE, Headquarters November 8, 2007.
Lake Okeechobee Regulation Schedule
BUILDING STRONG ® PORTLAND DISTRICT 1 The Dalles Dam Emergancy AWS Backup Water Supply P&S FFDRWG Meeting, 4 Feb Pat Duyck Project Manager.
US Army Corps of Engineers Portland District Sediment Evaluation Framework and Project Review Group Update Marci E. Cook Project Coordinator, RSET/SEF/PRG.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Lower Allegheny River Stakeholders Meeting June 15, 2006.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Integrated Channel Maintenance Planning in the Lower Columbia River Innovating Dredged Material Management Planning to incorporate Regional Sediment.
AVIAN ABUNDANCE AND DETERRENT MEASURES AT NWD DAMS
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Delta Long-Term Management Strategy
Navigation Funding for CMANC
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Lower Monumental and Little Goose master plan revision
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014

BUILDING STRONG ® Agenda  Columbia-Snake River 2017 Extended Outage Planning  Programmatic Sediment Management Plan (PSMP)  FY15 Budget Outlook 2

BUILDING STRONG ® Impacted Navigation Locks on the Columbia-Snake River System MCR Jetties 3

BUILDING STRONG ® Our Process  Requirements prioritization and analysis ► Risk-informed decision process with system reliability considerations ► A river systems approach coordinated between Walla Walla and Portland Districts ► Conduct technical requirement review meetings annually  Communicate requirements, risks and the plan 4

BUILDING STRONG ® Walla Walla District Extended Outage Requirements Operating Project Project Description Ice Harbor Downstream gate mech gear replacement (includes bull gear) P&S Contract Award Repair Lower Monumental Downstream gate mechanical gear replacement BCOES Contract Award Repair McNary Downstream miter gate interim repair P&SRepair Little Goose Downstream miter gate quoin and structural repair P&S Contract Award Repair Lower Granite Downstream repair nav lock sill plate drain system, ladders, and armor steel BCOESRepair Funding dependent P&S – Plans & Specifications BCOES – review to evaluate biddability, constructability, operability, environmental, sustainability 5

BUILDING STRONG ® Coordination Objectives  Program coordination with stakeholders ► Communicate intended outage time frame ► Communicate items in President’s Budget (usually February time frame)  Goal: 2017 Extended Outage ► Funding dependent ► Expected outage approximately 14 weeks ► Will begin formal coordination when we have FY16 budget information 6

BUILDING STRONG ® 20 Jan 2014 – Sediment Quality Report 15 August 2014 – P&S BCOE Cert 23 Sep 2014 –End of Public Review FPSMP/EIS 30 Oct 2014 – Award Contract PSMP Schedule (15 August 2014 Update) 15 Nov2014 – Redd Surveys at HLD 8 August 2014 – Complete Revisions to EIS Sep 2014 – Water Quality Certification 18 Feb 2014 – DMMO Suitability Determination 19 Dec 2013 – Port Permit Public Comment Period Ends 20 Sep 2013 – NWW Complete Draft Response to Comments 15 August 2014 – FEIS Filed with EPA 7 Nov 2013 – Award sediment re-sampling contract 1 Nov 2013 – Receive Port Permit Application 30 July 2014 – BA to NMFS/USFWS 7 15 Dec 2014 – Dredging Start 29 Oct 2014– Permit Decision 28 Oct 2014 – Sign ROD 11 Oct 2013 – NWD submit outstanding issues on DEIS comments to NWW FEIS Immediate Need Dredging Regulatory Permitting Schedule Drivers USFWS and NMFS Plan BiOp

BUILDING STRONG ® NWW Budget Trend (President’s Budget) Operations & Maintenance (O&M)*$ 27.6M $ 44.9M *** $ 37.2M Columbia River Fish Mitigation (CRFM)** $ 82.8M $ 101.6M $ 71.0M * Includes some non navigation funds for Lucky Peak, etc. ** Includes funds for both Portland & Walla Walla District efforts ***Includes one time funds-PSMP & other navigation projects. 8

BUILDING STRONG ® Questions? 9