Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.

Slides:



Advertisements
Similar presentations
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Advertisements

DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Engineer Fahad Hasan Associate Yousuf Hasan Associates, Consulting engineers District cooling.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
SENIOR THESIS PRESENTATION An Evaluation of Water-Side Economics & Emissions Sinai Hospital South Tower Vertical Expansion 2401 W. Belvedere Ave. | Baltimore,
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Senior Thesis 2013 Ji Won Park Mechanical Option Advisor: Dr. Stephen Treado.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Miller Children’s Hospital Pediatric Inpatient Addition Long Beach, CA.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards – Mechanical Option Advisor - Dustin Eplee Des Places Residence Hall Senior.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Harley-Davidson Museum
David Anderson Mechanical Option
Grunenwald Science and Technology Building
The Benefit of Including Energy Recovery System Analysis
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
Virtua Replacement Hospital -Voorhees NJ
Tri-Valley Jr./Sr. High School Hegins, PA
Presentation transcript:

Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical Option Penn State University

Project and Building Background Justin Bem – Mechanical Option Owner - The Milton Hershey School Location – The Milton Hershey School Campus, Hershey, PA Project Size - 110,000 square feet Total Cost - $23,500,000 Design-Bid-Build Contract Construction Dates - July 2006 – July 2007

Project and Building Background Justin Bem – Mechanical Option The Supply Center - General Office and Conference Rooms - Kitchen/Food Preparation Center - Bakery - Clothing Store and Alterations Seamstress - Mail Distribution Center - General Building and MHS Campus Storage

Existing Conditions Justin Bem – Mechanical Option Air Side Mechanical System 14 Total Air Handling Units - 10 VAV Units – Serving General Office and Clothing Areas - 4 CAV Units – 100% Outdoor Air Make-Up Units for Kitchen/Bakery - Chilled/Hot Water Coils - Housed in Elevated Mechanical Mezzanine Floor McQuay Custom Air Handling Unit

Existing Conditions Justin Bem – Mechanical Option Existing Chiller Plant (2) 270 ton Water Cooled Centrifugal Chillers - Primary-Secondary Pumping - 45°F Chilled Water Serves AHU Coils and Walk-in Freezer Condenser - Electric Driven Vapor Compression Machines - Housed in 1 st Floor Mechanical Room Trane Centrifugal Chiller Existing Boiler Plant (3) Natural Gas Fired Steam Boilers - Handles All Building HVAC Heating Demands - Meets Domestic Hot Water Heating Demands

Existing Conditions Justin Bem – Mechanical Option Walk-in Freezer Condenser Water Loop Rejected Heat from Condenser to water loop - Removes Additional Heating Load from Kitchen Space - Load Is Met Directly By Chilled Water Plant Via Plate-Frame HX’s - Water Side “Free” Cooling Is Utilized in the Winter for Heat Rejection

The Redesign Outline Mechanical Redesign Justin Bem – Mechanical Option Effect on Structural System and Building Construction Effect on Electrical System

Mechanical System Redesign Objectives Justin Bem – Mechanical Option Goals - Increase Energy Efficiency - Low Life Cycle Cost - Affordable – (Low First Cost or 2-4 Year Payback Period) Integration of Building Systems with HVAC System - Recover Waste Heat - Perform Multiple Functions from One Fuel Source

Justin Bem – Mechanical Option Dedicated Outdoor Air Systems at The Supply Center -10 Existing VAV Air Handling Units Replaced with 2 DOAS Units - Saves in First Cost - Saves in Fan and Chiller Energy Mechanical System Redesign DOAS/ Water Source Heat Pumps Water Source Heat Pumps at The Supply Center - Water Source Loop Integrates Other Building Systems --Condenser Water Loop Heat Recovery - Gives Ability to Heat and Cool Simultaneously

Justin Bem – Mechanical Option Mechanical System Redesign DOAS/ Water Source Heat Pumps

Justin Bem – Mechanical Option Walk-in Freezers Reject Heat to a Condenser Water Loop - Must Be Cooled for Continues Operation of Freezers - Potential for a Large Amount of Energy Recovery Mechanical System Redesign Condenser Loop Heat Recovery 135gpm Flow Rate 84°F Hot Temperature 65°F Operating Temperature 1282 MBH of Possible Heat Recovery

Justin Bem – Mechanical Option Heat Recovery In Water Source Loop - Water Source Heat Pump Loop Requires Winter Time Heat Addition - Operating Temperature of 68°F - Condenser Water Loop Serves as Heat Source Via Heat Exchanger Mechanical System Redesign Condenser Loop Heat Recovery

Justin Bem – Mechanical Option Heat Recovery In Domestic Hot Water Pre-Heat - High Domestic Hot Water Demand at The Supply Center - Condenser Loop Pre-Heats Water to 76-81°F (Saves 35% Heating Energy) Mechanical System Redesign Condenser Loop Heat Recovery

Justin Bem – Mechanical Option Direct Natural Gas Fired Absorption Chiller-Heaters - Utilizes Natural Gas Service at The Supply Center - Typical Double Effect LiBr/Water Absorption Cycle - Includes Heat Exchanger in High Temperature Generator for Simultaneous Cooling and Hot Water Production (Up to 210°F) Mechanical System Redesign Absorption Chiller-Heater Technology

Justin Bem – Mechanical Option Direct Natural Gas Fired Absorption Chiller-Heaters - Simultaneous Heating Comes at the Expense of Cooling Production - Chiller-Heater Must Run at 30% Cooling Capacity Minimum Mechanical System Redesign Absorption Chiller-Heater Technology

Justin Bem – Mechanical Option Existing System Chiller Plant Load Profile

Justin Bem – Mechanical Option Chiller-Heater Selection - Sized to Meet Cooling and HVAC/Domestic Hot Water Needs - (2) 240 ton Chiller-Heaters Used - Meets Cooling Load with Enough Capacity to Produce Hot Water Mechanical System Redesign Redesigned Chiller/Boiler Plants

Justin Bem – Mechanical Option Redundancy and Reliability -If one Chiller-Heater Is Off Line, Second Meets Critical Load -- Walk-in Freezer’s Condenser System 106 tons -- All other cooling loads are not critical Mechanical System Redesign Redesigned Chiller/Boiler Plants -Back-up Boiler to Meet Heating Demand -- HVAC and Domestic Hot Water INTEGRATES HEATING, COOLING, CONDENSER WATER, AND DOMESTIC WATER SYSTEMS!

Justin Bem – Mechanical Option Mechanical System Redesign Redesigned Chiller/Boiler Plants

Justin Bem – Mechanical Option Energy Rates Mechanical System Redesign Life Cycle Cost Analysis WinterSpring/FallSummer $/Therm Natural Gas Electricity Rates $0.06 / kW-hr

Justin Bem – Mechanical Option Annual Operating Cost Comparison Mechanical System Redesign Life Cycle Cost Analysis $42,800 Annual Cost Savings!

Justin Bem – Mechanical Option Annual Energy Consumption Mechanical System Redesign Life Cycle Cost Analysis

Justin Bem – Mechanical Option Initial Cost Comparison Mechanical System Redesign Life Cycle Cost Analysis $60,000 More Expensive

Justin Bem – Mechanical Option 20 Year Life Cycle Cost Comparison, 6% Interest Mechanical System Redesign Life Cycle Cost Analysis $376,600 Savings Over 20 Years! Existing SystemRedesign System Redesign O&M Costs additional $3,000 more per year

Justin Bem – Mechanical Option Mechanical Redesign Conclusions - Integrates Multiple Building Systems - More Expensive Up Front - Cheaper to Operate - Least Expensive 20 Year Life Cycle Cost Payback In Just Under 2 Years! Mechanical System Redesign Life Cycle Cost Analysis

Justin Bem – Mechanical Option Effect on Structural System and Building Construction

Justin Bem – Mechanical Option Structural/Construction Breadth AHU Relocation Existing System 14 Total AHUs housed in Mezzanine Floor 10 VAV4 CAV Redesigned System 6 Total AHUs 2 DOAS4 CAV Creates Wasted Space in Mezzanine Floor Move AHUs to Roof - Creates Structural Work - Potential to Save Initial Cost

Justin Bem – Mechanical Option Steel K-Series Joist are Replaced with W-flanged Beams Structural/Construction Breadth AHU Relocation

Justin Bem – Mechanical Option No Need to Construct Mezzanine Floor Only Held Air Handling Units Structural/Construction Breadth Mezzanine Floor Cost

Justin Bem – Mechanical Option Large First Cost Savings for Not Construction Mezzanine Floor Structural/Construction Breadth Mezzanine Floor Cost

Justin Bem – Mechanical Option Effect on Electrical System

Justin Bem – Mechanical Option Less Electric Driven Mechanical Equipment - Chillers, 8 AHUs, Boiler Accessories - Changes Load on Distribution Panels - Saves Cost on Feeder and Wire Sizes Electrical Breadth Power System Alterations

Justin Bem – Mechanical Option Electrical Breadth Power System Alterations Additional Electrical Cost

Justin Bem – Mechanical Option Electrical Breadth Power System Alterations Electrical Cost Savings$9,189 New Equipment Electrical Cost$5,534 Total Electrical Cost Savings$3,600 Electrical Cost Savings Mechanical Redesign Creates Electrical Cost Savings!

Justin Bem – Mechanical Option Overall Building System Redesign Cost Analysis Conclusions and Recommendations Final Cost Analysis Existing SystemRedesign Mechanical 1 st Cost$622,840$682,885 Mezzanine Cost$154,458N/A Additional Structural CostN/A$277 Additional Electrical Cost$3,600N/A Total 1 st Cost$780,898$683,173

Justin Bem – Mechanical Option Conclusions Compared to Existing System - Mechanical Redesign Saves Energy and Cost Over 20 Years - Integrates Other Building Systems - Creates Overall First Cost Savings! $ 98,000 Initial Cost Savings $ 42,800 Yearly Cost Savings $ 531,000 Saved Over 20 Years! Redesign Is Beneficial Conclusions and Recommendations Final Cost Analysis

Justin Bem – Mechanical Option Thank You! AE Department - Advisor Dr. Bahnfleth H.F. Lenz Company - Tom Hovan, P.E. Deckman Company - Scott Adams My Great Friends for Their Support! Acknowledgments

Justin Bem – Mechanical Option Building Systems Integration The Milton Hershey School Supply Center Questions?

Justin Bem – Mechanical Option Plant Load Analysis - Walk-in Freezer’s Heat Rejection Creates 106 ton Base Load - Peak Cooling Load at 390 tons -High Hot Domestic Hot Water Demand -- Excellent Opportunity for Simultaneous Heating and Cooling! Mechanical System Redesign Redesigned Chiller/Boiler Plants

Justin Bem – Mechanical Option Mechanical System Redesign Redesigned Chiller/Boiler Plants AHUOutdoor Air Supplied Total23,445 DOAS DOAS Total9,791 Difference13,654

Justin Bem – Mechanical Option Existing System Chiller Plant Load Profile

Justin Bem – Mechanical Option Existing System Chiller Plant Load Profile

Justin Bem – Mechanical Option New System Chiller Plant Load Profile

Justin Bem – Mechanical Option AHU Relocation - Beams sized to limit deflection to avoid ponding Δ = 5wl 4 /(384EI) Δ = L/240

Justin Bem – Mechanical Option Additional Cost of Redesign Is Small! Structural/Construction Breadth AHU Relocation