Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.

Slides:



Advertisements
Similar presentations
NAESB Coordinate Interchange
Advertisements

Sharing of ISTS Charges & Losses Regulation
Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Settlement system of Bilateral transactions under Open Access
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Billing, Collection and Disbursement Procedures
Open Access and Trading. Trading “Trading" means purchase of electricity for resale thereof” Any person is allowed to undertake trading in electricity.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Presentation Outline Indian Electricity Market
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC Paper on Open Access Presentation by the MPERC Bhopal At New Delhi 25 September 2003.
Open Access In Interstate Transmission system
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
11/27/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Sharing of Inter-State Transmission Losses 11/29/
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
12/7/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Interstate Transmission system
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
Sharing of Inter-State Transmission Losses
Congestion regulations
IN INTER-STATE TRANSMISSION
E-bidding for Short Term Open Access by – S
Settlement system under Open Access
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

Open Access

DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission”

INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options for distribution companies to buy power. Open Access will provide means to the traders/buyers/sellers. Non- discriminatory / Transparent Process Freedom to buy/sell power Efficient Market Mechanism to address supply / demand mismatches Encourage investment in Transmission

Legal Framework SECTION 38: (CTU Function) CTU to provide open access to Licensee or Generating Company on payment of transmission charge Any consumer when open access is provided by State Commission on payment of surcharge in addition to transmission charges. Surcharge shall be for meeting cross subsidy, and to be progressively reduced and eliminated. Surcharge not payable in case of captive generation and Distribution Companies. CTU can not engage in generation and trading

Legal Framework Sections 39, 40 and 41 Similar provisions for STU and Transmission Licensee. STU can not engage in trading. Transmission Licensee can not engage in trading Section 42 State Commission to provide Open Access to all consumers who required supply more than 1 MW in 5 years.

Agencies involved in Short-Term Open Access Transaction RLDC (s) SLDC (s) CTU STU (s) Buyer Seller Trader

Open Access – CERC Regulations, 2008

CERC Open Access Regulations, Subject to any other regulations specified by the Commission, the long-term customer shall have first priority for using the inter-State transmission system for the designated use. These Regulations shall apply for utilization of surplus capacity available thereafter on the inter-State transmission system by virtue of- (a) Inherent design margins; (b) Margins available due to variations in power flows; (c ) Margins available due to in-built spare transmission capacity created to cater to future load growth or generation addition:

STOA LTOA OA Regulations 2004 STOA- bilateral STOA- collective OA Regulations 2008 Connectivity LTOA OA Regulations 2010 MTOA Evolution of Open Access Regulations

Duration of STOA,MTOA and LTA STOA MTOA LTOA 3 months 3 months-3 years 12 years-25 years

CERC Open Access Regulations, 2008 Effective Amended in Regulations cover only Short-term Open Access Transactions categorized as Bilateral and Collective (through PX) Earlier Products of Short-Term retained under Bilateral Transactions Nodal Agency –Bilateral : Drawing RLDC –Collective : NLDC

Both Buyers and Sellers of Collective transactions to bear transmission charges and absorb transmission losses Inter-Regional links -No Separate treatment. Emphasis on “Scheduling” rather than “Reservation” SLDC consent mandated along with application In case of Congestion – e-Bidding without Price Cap Exit Option provided with payment of up to 2 days open access charges. Moving towards empowerment of SLDCs Open Access in ISTS: CERC OA Regulations 2008

Open Access in ISTS Products – Short term Access - Advance - First Come First Serve - Day ahead - Contingency CERC OA Regulations 2008 Provisions relating to Long Term as per the Open Access Regulations, 2004 to continue, till CERC further notifies. Long term Access

Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008) S. No. Old Regulations ( to ) Amended Regulations (w.e.f to ) Regulations, 2008 (w.e.f ) 1.Open Access Duration - Up to One year maximum - single application possible Open Access Duration - Up to Three Months max. - single application possible Open Access Duration Bilateral -Up to 3 months -separate application for each month Collective: -Only Day ahead 2. ST Rate - in Rs/MW/Day - Min. Charges for one day ST Rate - in Rs./MW/Day -Charges as per continuous block of up to 6 hours, 12 hours, and more than 12 hours Rate -in Rs/MWh - Based on Scheduled Energy rather than reservation of transmission capacity

S. No. Old Regulations ( to ) Amended Regulations (w.e.f to ) Regulations, 2008 (w.e.f ) 3. Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter Regional – 25% of Long Term Charges Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter-Regional - 50% of Long Term Charges Transmission Charges: Bilateral: -Rs.30/MWh – intra- regional -Rs.60/MWh – Between adjacent regions -Rs90/MWh – Wheeling through one or more region Collective Transactions (Px): -Rs. 30/MWh for each point of injection and drawal 4. Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 3000/day for each SLDC involved c. Handling &Service Charges - 2% of total charges Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 1000/day for each RLDC involved c. Handling & Service Charges – Nil Operating Charges Bilateral: a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 2000/day for each RLDC and SLDC involved c. Handling & Service Charges -Nil Collective Transactions: a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 5000/day to NLDC for each State involved ; -NLDC to Share with RLDCs Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008)

S. No. Old Regulations ( to ) Amended Regulations (w.e.f to ) Regulations, 2008 (w.e.f ) 5.OA Application types : - Advance OA Application types : - Advance -FCFS -Day Ahead -Same Day OA Application types : - Advance -FCFS -Day Ahead -Contingency 6. Time FrameTime Frame : 20 th of the month Time Frame : -10days

ER-NR NER-ER WR-NR SR-WR SR-ER EASTERN REGION SOUTHERN REGION WESTERN REGION NORTHERN REGION NORTH- EASTERN REGION STOA RATES 2004, 2005 & 2009 ER-WR Transmission Charges: Bilateral: Rs.80/MWh – intra- regional Rs.160/MWh – Between adjacent regions Rs240/MWh – Wheeling through one or more region Collective Transactions (Px): -Rs. 100/MWh for each point of injection and drawal STOA CASECASE

Short Term charges CTU charges intra- regional Adjacent region Wheeling in 1 or more Region Collective As per Regional charges in Rs/MW/day As per Regional charges in Rs/MW/day In blocks Rs/MWh PoC Rs/MWh PoC Scheduling Charges Rs/Day) RLDCs SLDCs Handling Charges2%NIL STU charges as decided by SERCs IR link charges done away with CTU charges moved from Region specific charges to generic ones Transmission charges changed from Rs/MW/day  Rs/MW/block of day  Rs/MWh Power Exchange transactions necessitated Point of Connection charges

Procedure for Scheduling of Open Access ( Bilateral Transaction)

SUBMISSION OF APPLICATION Nodal Agency – RLDC where point of drawal is situated Application Contents –Details -Buyer /Seller /Point of injection/point of drawal/Contracted power at supplier interface/date/time period Application Fee (Rs. 5000/-) –Along with application –With in 3 working days ( for same day or next day transaction) Endorsement –Concerned SLDCs

CONCURRENCE OF GRID OPERATORS Available Transfer Capability SLDC – ( congestion in intra-State TS) – concurrence -along with Application RLDC - ( congestion in Regional TS) –To be obtained by Nodal RLDCs Refusals /Curtailed Concurrence – Reasons to be mentioned in writing

ADVANCE SCHEDULING Advance Scheduling – 3 months in advance Separate Application – –Month wise - each transaction Time Line for submission –Last date for submission ( -10 / -5 / 0 days prior to end of current month M0 – for transaction in M1, M2, M3) –Cut-off time : 17:30 Hrs. of last day (Day 0) –Request for concurrence (RLDC) – by 12:00 Hr. next day (Day 1) –Concurrence - by 20:00 Hrs (Day 1) –Congestion Information to Applicant – next day 12:00 Hrs (Day 2) –Revised Request – next day 11:00 HRs. (Day3) –E-bidding – in case of Congestion (next day) (Day 4) –Acceptance/Refusal of Scheduling Request – (Day 5)

Time Line for Advance, FCFS, DA and Contingency Scheduling M0M0 M1M1 M2M2 M3M hrs 5 Last Day for submission of Applications for transactions in M1, M2, M3 Processing time for RLDCs M0M0 D -1 D -2 D -3 D0D0 1.5hrs Deadline for submission of DA Applications for transactions on D 0 Deadline for submission of Contingency Applications for transactions during D 0

e-Bidding Procedure Invitation of Bids – period of congestion –RTS/IR corridor – overstressed Only Registered Users –User ID & Password –Electronic submission – website of CTU –Bid Closing time as specified –Single Price Bid –No Modification/withdrawal once submitted Bid Price - in addition to Open Access Transmission Charges Multiples of Rs. 10/ MWh. ( Min. Rs. 10/MWh) Mandatory - Non-participation – Rejection of Application Acceptance - Decreasing order of Price Quoted Equal Price Bids – Pro-rata Part Acceptance – Price as quoted by the bidder Full Acceptance – Price quoted by last bidder getting full acceptance

“FIRST-COME-FIRST-SERVED” BASIS Scope –Current Month – Next Month ( during last 10 days of end of current month) Separate Application for each month To be submitted 4 days prior to date of Scheduling Processing time – 3 days Processed on FCFS basis Application Received in a day to be processed together – same priority Application Received after 17:30 Hrs. - next day Congestion Management – pro-rata

DAY-AHEAD BILATERAL TRANSACTION Applications received within 3 days prior to the day of Scheduling and up to 15:00 Hrs. of the day immediately preceding the day of scheduling shall be treated as having been received together for processing and shall have same priority. Processing only after processing of the Collective Transactions of the Power Exchange (s). Congestion Management – Pro-rata

SCHEDULING OF BILATERAL TRANSACTION IN A CONTINGENCY Only Buying Utility to make an Application to the Nodal RLDC. To be considered after 1500 hrs of the day immediately preceding the day of scheduling. In case of intra- day – scheduling from 6 th time block Congestion Management – Pro-rata

INCORPORATION IN DAILY SCHEDULES RLDCs to incorporate in Daily Schedules of the Regional Entities Average energy losses -estimated on weekly basis –RLDCs – ISTS –SLDC – intra-State TS resolution of 0.01 MW at each State/inter- Regional boundaries. ramp-up –at the time of commencement of the transaction ramp-down –at the time of termination of the transaction

Start Is the application (Day ahead / Same Day) or (AR/FCFS) Is the applicatio n is Advanced Booking Is the applicatio n Day ahead / Contingen cy STOP Payment Calculation Payment Disbursement & refund DADA Co n. ARAR FC Transaction Processing

DA Is Application Received before 15:00 hrs Collect All Applications received till 15:00 hrs with time stamp and details. Submit all applications for Consent from concerned SLDC Check for the final consent from other SLDC. No Yes Contingency

DA Is Application Received before 15:00 hrs Collect All Applications received till 15:00 hrs with time stamp and details. Submit all applications for Consent from concerned SLDC Check for the final consent from other SLDC. No Yes Contingency

AR Applications are submitted for Consent from RLDC Check for Consent Is application received in time in respect of 1 st, 2 nd & 3 rd month Yes Is application within stipulated time Reject Application Process as FCFS application for next month for applications made for the 1 st month

Yes No Is requested capacity available? Applicants are informed about the congestion and allowed to reduce their requirements/re- route Is requested capacity now available? Bids are invited for congested element Distribute the Capacity according to the current request. Distribute the Capacity following the bidding rules. Stop No Yes Process application if applicant wants to surrender or Revise the schedule. Consider curtailment by SLDC

Bi d Applications have to bid for the congested element in the multiple of Rs.10/MWh and minimum bid is Rs.10/MWh Ranking from highest bidding to lowest bidding Is Margin available? Allot the highest bidder first (in asc order). In case of same bid by 2 or more parties, allocate on pro rata basis between those If more than one person gets the full requested power No Yes Lowest price among those bidding is considered for all who got full requested power Stop Calculate the Actual

FC Receive the Applications for FCFS Applications are sent for Consent from ERLDC Get Consent from other ERLDC Is consent positive ? No Send a negative report to the client Yes Stop Is Margin Available ? Yes Send a Negative Report to the Applicant No Application is Approved and approval is updated. Schedule the Capacity as Requested on FCFS basis In case of revision in Schedule reprocess the application. In Case of Curtailment, Applicant is timely intimated

REVISON OF SCHEDULE Only in case of “Advance Scheduling” or “First-Cum-First Served basis” minimum five (2) days notice (5days in 2008 Regn) Transmission Charges and Operating Charges for 2 days (5days in 2008 Regn) Margin Available – could be utilized for scheduling of other Open Access Transactions

Example: Say an Applicant has been scheduled for 10 days from 21st day of a month to 30th day of a month for 100 MW on round the clock basis (i.e. for 2400 MWh per day). If this Applicant, on or before 15th day of that month, submits request for revision of schedule to 50MW on round the clock basis (i.e MWh per day), the revised schedule will get implemented from the beginning of the transactions (i.e. 21st day of the month). The Applicant shall pay the Transmission Charges for 2400 MWh per day for the period from 21st to 25th day of the month. Whereas for the period from 26th day to 30th day of the month, Transmission Charges shall be payable for 1200MWh per day. However, if the Applicant requests for such revision on 17th day of the month, his request will be implemented from 23rd day of the month. He shall pay Transmission charges for 2400 MWh per day for 5 days i.e. from 23rd to 27th day of the month and for the remaining period he shall pay the Transmission Charges based on 1200MWh per day.

CURTAILMENT IN CASE OF TRANSMISSION CONSTRAINTS Allocation/Reallocation of ISGS power Transmission constraint or to maintain grid security curtailed in the manner, which in the opinion of RLDC, would relieve transmission constraints/ enhance grid security Open Access Bilateral Transactions would generally be curtailed first followed by the Collective Transactions Rerouting allowed without curtailment Pro-rata refund of Transmission Charges

COMMERCIAL CONDITIONS All Payment related to Open Access ST Charges – by Applicant to the Nodal RLDC –within three working days from the date of acceptance Energy charges to be settled among the parties Losses adjusted in kind Application Fees (as per Para 7 of Regulation) –non-refundable fee of Rupees five thousand (Rs.5000/-) only Transmission charges (Para 16 of Regulation) –Intra-region (Rs.80/MWh) –Adjacent Region (Rs. 160/MWh) –Wheeling (Rs.240/MWh) –STU charges – as specified by respective SERCs or Rs. 80/MWh Operating charges (as per Para 17 of Regulation) –Rs. 2000/- per day each RLDCs/SLDCs involved

DEFAULT IN PAYMENT OF OPEN ACCESS CHARGES Nodal RLDC, at its discretion –may not schedule the transaction or –may cancel the scheduling of already scheduled transaction or –may not entertain any Application of such Applicant in future until such time the default is cured. simple interest at the rate of 0.04 % for each day of default from the Due Date of Payment Cheque has been dishonored –No cheque payment - next three (3) months

DISBURSAL OF PAYMENT Disburse the Open Access Charges –10th day of the next month Transmission Charges and Operating Charges – for State System –Concerned STUs/SLDCs For ISTS –25% to be retained by CTU –75% to be directly paid to Long Term customers Refund due to curtailment –15th day of the next month Reconcile the Open Access Charges

GENERAL CONDITIONS “One- Time” information as per enclosed format For embedded utilities : –UI rate 105% for overdrawl /under injection –& 95% for over injection under drawl – Reactive charges as per SERC The Applicant shall abide by the provisions of The Electricity Act, 2003, Indian Electricity Grid Code and CERC Regulations, as amended from time to time Applicant shall keep each of the SLDCs/ RLDCs indemnified

STOA – SUCCESS STORY Developed in consultation with all stakeholders Applications Processed (Since Beginning) > 20,000 No. Volume (Approved Energy) (Since Beginning) > 90BUs Applications Approved > 95 % –Refusal/Non-consent by SLDCs > % –Refusal due to system constraints < 0.5 %

STOA – SUCCESS STORY Robust Financial Settlement System Dispute free implementation Logistics/infrastructure -In-house Confidence Building & Dissemination of knowledge

Any mismatch between the scheduled and the actual drawal at drawal points and scheduled and the actual injection at injection points for the intra- State entities shall be determined by the concerned State Load Despatch Centre and covered in the intra-State UI accounting scheme. Unless specified otherwise by the concerned State Commission, UI rate for intra-State entity shall be 105% (for over-drawals or under generation) and 95% (for under- drawals or over generation) of UI rate at the periphery of regional entity. Unscheduled Inter-change (UI) Charges

RLDC PROCESSING FEE RLDC Operating Charges CTU Charges NRLDC SRLDC ERLDC NERLDC WRLDC TOTAL STOA CHARGES COLLECTED BY RLDCS DURING THE YEAR All figures in Crores of Rs.

Issues Invoking of Sec 11 by state Govt. barring export from IPPs in the state URS of ISGS under STOA (as per CERC order ) –Among the beneficiaries –Across the regions –Revision if original beneficiary recalls

Revision of STOA under forced outage of Injecting unit>100MW (as per IEGC cl ) –Intimate SLDC/RLDC reg. reduced availability, estimated restoration time, transaction wise revision 19. Notwithstanding anything contained in Regulation 6.5(18), in case of forced outage of a unit for a Short Term bilateral transaction, where a generator of capacity of 100 MW and above is seller, the generator shall immediately intimate the same along with the requisition for revision of schedule and estimated time of restoration of the unit, to SLDC/RLDC as the case may be. With the objective of not affecting the existing contracts, the revision of schedule shall be with the consent of the buyer till Thereafter, consent of the buyer shall not be a pre-requisite for such revision of schedule. The schedule of the generator and the buyer shall be revised, accordingly. The revised schedules shall become effective from the 4th time block, counting the time block in which the forced outage is declared to be the first one.. The RLDC shall inform the revised schedule to the seller and the buyer. The original schedule shall become effective from the estimated time of restoration of the unit. However the transmission charges as per original schedule shall continue to be paid for two days.

ST charges under OA Under going changes frequently In CERC Regulations on “Sharing Transmission Charge and Losses” w.e.f , ST charges as per Point of Connection charge philosophy ie. as per the Zonal charges for Injection and Drawl of the concerned Injecting and drawing utility Losses be adjusted in kind as per the applicable Zonal losses