Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting 21.03.2013.

Slides:



Advertisements
Similar presentations
Radiation Protection Service University of Glasgow The Internal Radiation Hazard Janice Brock University RPO Radiation Protection Organisation Within Glasgow.
Advertisements

EHN1 Claude Pesce DGS/RP. Why TREC & buffer zones?  Radiological control of material leaving beam areas is a legal obligation.
Gauges and well logging
IMPACT Safety sub-working Group 1 Fernando B. S. Pedrosa IMWG – 07/Oct/2014 EDMS id:
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
The Laboratory 530 R-005: RADMON and more A Masi, The Laboratory 530 R-005: RADMON and more The Laboratory 530 R-005: RADMON and more A. Masi 1.What??
: adding and removing zones from Federal University of Rio de Janeiro CHEP’09 International Conference on Computing in High Energy and Nuclear Physics.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Handling Electronics from Radiation Areas N. Conan, D. Forkel-Wirth, T. Otto, S. Roesler, C. Theis, C. Tromel, V. Tromel, Heinz Vincke, L. Ulrici R2E,
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Radiation Protection for the Beam Line 4 Schools project Robert Froeschl (DGS/RP)
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
GENERAL ACCEPTANCE CRITERIA FOR CERN RADIOACTIVE WASTE RSOC 6 March 2015 EDMS L. Ulrici - for DGS-RP group.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
All information relating to safety training and awareness can be found at this address:
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
Radiation Protection Aspects LHC Performance Workshop 25 th September 2014 D. Forkel-Wirth, P. Carbonez, A. Goehring-Crinon, D. Perrin, S. Roesler, H.
Safety in LS1 Thomas Otto, TE DSO.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Radiation Protection in LS2 D. Forkel-Wirth, P. Carbonez, Y. Donjoux, G. Dumont, A. Goehring-Crinon, S. Roesler, C.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
RSSO REPORT TE-MSC Andrea Musso – Virginia Prieto Hermosilla (RSSO’s) Acknowledgments - We wish to thanks: Michele Modena (Safety Link Person TE-MSC) for.
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
RSSOs at CERN Prepared by Ans Pardons for the CERN RSSO training day With input from J. Pedersen.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Procedure for Removal of Material and Waste from LHC P. Bonnal, N. Conan, I. Brunner, D. Forkel-Wirth, H. Menzel, S. Roesler, C. Tromel, L. Ulrici, with.
Electrial Safety LS2 days November 2016 AP
Test beam check list Michael JECKEL EN-EA-EC.
Buffer Zones - Status Report
CATIA users meeting 07/06/2012 Material guidelines project – radiological hazard classification Helmut Vincke, Chris Theis on behalf of DGS/RP RSO committee.
Quality Assurance applied to Accelerator Safety
Radiation Protection for the Beam Line 4 Schools project
Test beam check list Michael JECKEL EN-EA-EC EDMS:
Radiation Protection for the Beam Line 4 Schools project
Radiation protection organisation
Occupational Radiation Protection during High Exposure Operations
ESS Handbook on Radiation Protection Chapter 6 – Dosimetry
Lena Johansson Senior Radiation Protection Expert
Radiation Protection Handbook
Work and Service Supervisor
Presentation transcript:

Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting

Radiological Classification 2LTEX Meeting, March 21st

Radiological Classification 3LTEX Meeting, March 21st

Radiological Classification 4LTEX Meeting, March 21st

Classification: Dose Limit 1 mSv/y6 mSv/y20 mSv/y Residual Dose Rate < 15µSv/h< 50µSv/h< 2mSv/h< 100mSv/h Training RP training « Supervised Zone » (e-learning course) RP Training « Controlled Zone » (class room course) DosimeterPassive Dosimeter (DIS) Firm Passive Dosimeter (contractors) Active Dosimeter (DMC) DIMR DIMR mandatory if: Collective Dose > 500 µSv Individual Dose > 100 µSv DIMR mandatory Restrictions Forbidden access to VCT, CDD and INTERIMAIRES The access in the radiation areas is forbidden to pregnant and breast feeding women and to all persons younger than 18 years old Radiological Classification Passive Dosimeter (DIS) Firm Passive Dosimeter (contractors) Passive Dosimeter (DIS) Firm Passive Dosimeter (contractors) Active Dosimeter (DMC) 5

RP Training Courses 6LTEX Meeting, March 21st

Is DIMR needed? 7LTEX Meeting, March 21st

Is DIMR needed? 8LTEX Meeting, March 21st

0 The TREC system is present in each buffer zone: 0 Touch screen and bar-code reader 0 Bar-code stickers 0 TREC training course on SIR: TREC (Traceability of Radioactive Equipment at CERN) 9LTEX Meeting, March 21st

0 All the materials, included waste, coming out from the LHC tunnel, have to be registered in TREC and left in the buffer zone to be controlled by RP 0 The equipment too big to be left in the buffer zone they could be temporary left outside the buffer zone (but this has to be previously agreed by RP) 0 All the transports of radioactive material have to be done with the RP authorization (fiche jaune) TREC (Traceability of Radioactive Equipment at CERN) 10LTEX Meeting, March 21st

11 0 All the radioactive material internal transport (intra and intersites): 0 EDH transport request (TNRQ) or 0 material stackage request (STOCK); 0 RP authorization is mandatory (fiche jaune) 0 CERN car is mandatory 0 If the dose rate at contact is higher than 5 µSv/h, the transport has to be done by EN/HE 0 Rules: EDMS Radioactive material transport

New DMC reading system 0 Automatic reading and logging in a new RP database with new electronic DMC readers (LDM) 0 Link between IMPACT and the Operational Dosimetry system: the IMPACT number will have to be typed on the LDM 0 In addition to be logged in the RP database, the doses will be kept in the IMPACT database 12LTEX Meeting, March 21st

DMC: Pool Mode Assigned dosimeters Pool dosimeters 0 The dosimeter is assigned to a worker, when the dose is read it is automatically logged into the RP database (DB) under his/her name 0 The user only have to type the IMPACT number on the reader. 0 The dosimeter is not assigned to a worker, when he/she access he/she needs to type first his/her CERN ID and then he/she has to type the IMPACT number on the reader. 0 At the reading, the dose is automatically registered under his/her name in the DB Before accessingType the IMPACT number Ready to accessAt exit: after reading Type your CERN ID 13LTEX Meeting, March 21st

DMC: second phase 0 Second step of the project: during LS1, in compliance to the recommendations from the Host States Authorities (ASN/OFSP), the DMC will become mandatory in the Simple Controlled Radiation Areas. Meanwhile: usually no need to borrow a DMC for the work in Simple Controlled Radiation Area or in Supervised Radiation Area (except DIMR II/III) 0 At the beginning, a list of the active IMPACT numbers will be displayed next to each DMC reader and will be kept up to date by RP (weekly). At a later stage we will investigate the possibility to simplify this feature. 14LTEX Meeting, March 21st

In case of problem? 0 Alarm: leave the area immediately and contact the Radiation Protection Service for the concerned area: 0 Meyrin, tel. : Prévessin, SPS & LHC, tel. : Technical problem (battery, DMC HS, LDM HS, etc….), please contact the Operational Dosimetry Service: 0 Tel. : LTEX Meeting, March 21st

Optimization during design Material choice Goal: 0 Minimize doses received by personnel during maintenance and repair 0 Reduce costs for waste disposal  Consider radiological hazards in the choice of construction materials Tool to optimize material choices: ActiWiz (Authors: C.Theis and Helmut Vincke) 0 Computer code based on a risk model using pre-calculated FLUKA results. Considers external exposure and radioactive waste disposal 0 Provides radiological hazard assessment for arbitrary materials within a few seconds 0 Catalogue, produced with ActiWiz, listing pre-processed risk factors for typical accelerator construction materials as well as natural elements 0 Web-based catalogue (ActiWeb) allowing user friendly comparison of pre-processed materials 0 Materials not available in the catalogue can be processed with ActiWiz Web-site: 16LTEX Meeting, March 21st