Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation

Slides:



Advertisements
Similar presentations
RETAINED SOIL WALL SYSTEM™
Advertisements

FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
ODOT Structure Project Manager Seminar Specifications
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Cost Estimation System Tool
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Composite Functions Consider a person working for a concrete contractor. One of his jobs is to estimate the cost for the product to put in a concrete driveway.
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
CONSTRUCTION SEMINAR Title 28 Professional Engineers and Land Surveyors Effective October 1, 2004.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Specification & Quantities Estimating
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
DAS Contractor Prequalification ‘07 changes Program Overview and 2007 Program Changes resources introduction Department of Public Works January.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
LIGO-G M Contract Plans and Strategy Irena Petrac Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Chapter 7 Channel Excavation7 - 1 Chapter 7 Channel Excavation.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Community Development Department Holland Park Renovations Playground & Splash Park Design.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
KYTC Change Order (Contract Modifications).
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Chapter 8 Specifications & Special Provisions
Construction Oversight
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
2013 Specification Implementation
Completing the State Aid Payment Request
Administrator of Construction Todd Wilson Senior Project Manager
2013 Specification Implementation
Final Design Authorization
Presentation transcript:

Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation

Introduction 1. How many bid items do you think were used on US95 2A? 2. How many sources/divisions contribute to the estimate? 3. What are some good strategies to keep track of bid items?

Agenda 1. Quantities 2. Estimate 3. Contract Awarding 4. Conclusion

Roadway Quantity Breakout & Calculations Master Quantities Roadway Breakout Structure List Barrier RailLength of Need ADA (driveways)Areas/ Cross Sec ADA (Sidewalk)Areas/ Cross Sec 3 sheets EarthworkCross Sections Structure Sections Station/ Offset GeotextileLocations/ Areas Traffic Control Sign MatrixTC phasing Device MatrixTC phasing DetourCross Sections StripingExcel CalcsAreas Compiled Estimate BreakoutsSub-Breakouts Excel Calculators CADD Calculations

Other Division’s Breakouts and Calculations Master Quantities Hydraulics Ditch & ChannelsExcel CalcsDGN CulvertsPipe matrixCS/ Lengths ITSCMSCMS matrixConduit SignsCantileverSign MatrixCS LightingHigh MastLighting MatrixArea L&ADecorative RockArea DesignationsAreas Structures MSE walls Wall MatrixProfiles/ Volumes ExcavationCS Bridge Resurfacing Deck InventoryAreas Sound WallsSW ListProfiles CCRFC Compiled Estimate BreakoutsSub-Breakouts Excel CalculatorsCADD Calculations

CADD file Removal of Composite surface Excel Calculators Driveway Calculator Sub Breakout Structure List Roadway Breakout Master Quantities

State’s Estimate Program Integrated Project Development (iPD) Estimator Specialist Ensure Correct Coding Handles Permit funding Oversees Estimate Status Roadway Designer Creates Estimate Inputs Quantities Creates Breakouts Obligates Funding Manager Unit Price Checker Special Provisions Writer Approve Bid items Finical Management Oversees preliminary costs Reserves money sources

Analyzing Different Types of Estimate  Engineers Final Estimate  Estimate Breakout Items  Has bid item descriptors  Contract Work Item Price Report  Shows compiled Breakouts  List all bid items and prices

Contract Awarding Low bidder gets the job Various Types of Submittals: change order? What is a supplemental? What is a revision?

Conclusion Tips to keep track of quantities Structure that builds in expectancy Ability to update a quantity conveniently Linked quantities Estimates have transparency to all divisions, common language Contract Awarding Low Bidder gets the job Contractor’s are looking to make the must money, it’s a business.

Questions ?