1. Water Trust Board Grant Agreement Scope and Objectives: Removal of islands below the Isleta Diversion Dam Restore this reach of the Rio Grande to the.

Slides:



Advertisements
Similar presentations
Washington Department
Advertisements

Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Simone Bizzi In collaboration with: Dr Andrea Nardini Technical Director of CIRF (Italian Centre for River Restoration) Model and evaluate geomorphology.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Chattahoochee River Restoration Aquatic Ecosystem Restoration City Mills Dam Eagle and Phenix Dam.
Rio Salado, Rio Salado Oeste Phoenix, Arizona Ecosystem Restoration Project H&H for Planners February 2011 Rio Salado, Rio Salado Oeste Phoenix, Arizona.
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to.
Assessment of gravel transport characteristics of the upper Santa Ana River Scott Wright and Toby Minear USGS California Water Science Center Sacramento,
1 Sediment Management for Dam Removal: An HEC-6 Approach.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Design of Open Channels and Culverts CE453 Lecture 26
Design of Open Channels and Culverts
Use of satellite altimeter data for validating large scale hydraulic models Matt Wilson, University of Exeter Doug Alsdorf, Ohio State University Paul.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
U.S. EPA: NCEA/Global Change Research Program Jim Pizzuto and students University of Delaware Changing Climate and Land Use in the Mid-Atlantic: Modeling.
Biological Objectives Tied to Physical Processes Dr. William Trush Scott McBain Arcata, CA.
What’s New in Sedimentation and River Mechanics Pierre Julien Spring 2001.
Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Hydraulic Routing in Rivers
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Urban Water Institute Conference August 22,
Lower Saluda River Instream Flow Study TWC Study Team Workshop December 11, 2007.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
US Army Corps of Engineers BUILDING STRONG ® 2012 Changes to Stream Mitigation Procedures and Guidelines Mike Moxey USACE, Mobile District IRT Chair May.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Ryan Johnson Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Conceptual Ecological Model of San Acacia Reach of Middle Rio Grande River – 2/13/07 1 st Draft Ibis Ecosystem Associates, Inc. Diversion & Regulation.
RIVER PROCESSES Introduction to Watershed Science Merritt College Marc Epstein, Instructor.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Natural Riparian Resources Water Landscape & SoilVegetation.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Processing of a Fine Sediment Pulse after Dam Removal Sediment Budget and Longitudinal Trends Chiloquin Dam Removal – Sprague River Matt Cox, Desiree Tullos,
Stream Processes and Habitat Ryan Johnson. Overview Watershed Processes – Factors and their effects on the watershed as a whole Stream Processes – Factors.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
DREDGING THE PASS Ten-Year Permit vs New Proposed Permit Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Sensitivity analysis of hydraulic model to morphological changes and changes in flood inundation extent J.S. Wong 1, J. Freer 1, P.D. Bates 1, & D.A. Sear.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
San Juan River Environmental Flows Workshop Background on 1999 Flow Recommendations for the San Juan River February 12-13, 2015.
Hyporheic Zone- area where stream water and ground water intermix.
Changes in Fine-Sediment Storage During the LSSF Matt Kaplinski, Joe Hazel, Mark Manone, Rod Parnell, Joe Cain, John Souter Northern Arizona University.
Comparison of Benthic Invertebrate Communities Upstream and Downstream of Proposed Culvert Installations in Alabama Amy C. Gill USGS, Alabama Water Science.
FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
Natural and artificial hydromorphological changes in Norway Agnès Moquet-Stenback – Section for erosion and sediment transport – Hydrology.
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Sustaining Aquatic Biodiversity G. Tyler Miller’s Living in the Environment 14 th Edition Chapter 11 G. Tyler Miller’s Living in the Environment 14 th.
Natural Riparian Resources Water Landscape & SoilVegetation.
Teton Basin Study Teton Lake vs Teton Dam.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Side Channel and Off Channel Habitat Restoration Washington Dept. Forestry, 2004, Side Channel Restoration Dylan Castle.
Bridges Reach analysis Fundamental tool for design
Computer Aided Simulation Model for Instream Flow and Riparia
What’s New in Sedimentation and River Mechanics
Morphodynamic and Sediment Tracers in One-Dimension
Mississippi River Hydrodynamic and Delta Management Study
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Glen Canyon Dam Determining Best Management Practices.
Sustaining Aquatic Biodiversity
Erosion.
Streams Hydrodynamics
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Natural and Man-made features
Kastanis- Existing Conditions
Presentation transcript:

1

Water Trust Board Grant Agreement Scope and Objectives: Removal of islands below the Isleta Diversion Dam Restore this reach of the Rio Grande to the Traditional view of the Pueblo Restore the connection between the shallow ground water aquifer and the river Create habitat for the RGSM 2 backwater features constructed Being done upstream of the Isleta Diversion Dam 2

Design Objectives Maintain year-round wet channel along west bank Integrate with restoration work at cultural site on west bank Assess geomorphology Model three flow events Low flows to maintain flow against west bank Mid-level flow to determine sediment transport High-level flows to determine hydraulic design parameters Endangered species habitat features Remove invasive vegetation 3

2002 4

2005 5

2008 6

2012 7

Design Plan View Cross-sectional View 8

Modeling Tools 1D vs 2D modeling SRH-2D v. 30 Public domain, hydraulics and sediment transport modeling available through USBR Solves depth-averaged, 2D St. Venant equations Calculates sediment transport capacity at each cell for each timestep using Engelund-Hansen equation, compares to supply SMS v Create hybrid mesh Visualize & post-process model output 9

Fixed-bed, Mobile-bed Modeling: Fixed-bed Model Mobile-bed Model Comparison of existing and design hydraulic parameters Results used to: Size rip rap Calculate scour Comparison of existing and design bed elevation change, sediment concentration Results used to evaluate sustainability 10

Inundation Mapping: 100 cfs 1,200 cfs3,000 cfs 11

100 cfs1,200 cfs 12

Bed Elevation Change 13

Project Uncertainties Project is within a sediment laden and dynamic river system Project life span subject to many elements beyond the control of either party long term spring runoff events short term thunderstorm events in upstream tributary arroyos operations of the Isleta Diversion Dam 14

Construction Performed by AJAC Enterprises, Inc. Removed ~70,000 cubic yards of material NTP to substantial completion: 84 calendar days 15

Completed Project 16

Post-Construction Maintenance: Removal of woody vegetation on benches on an annual basis Removal of deposited sediment in channel on an as- needed basis depending on flows Destabilize any emergent islands 17

Thank You 18