July 15, 2009 Interferometer Installation Report Mike Hildreth, Kurt Jung, Mickey McDonald Université de Notre Dame du Lac.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
March 22, 2011Mike Hildreth – ALCPG 2011, Beam Instrumentation Energy Spectrometer R&D; Plans for End Station A Test Beams Mike Hildreth University of.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
October 1, 2009Mike Hildreth – ALCPG09 Energy Spectrometer R&D Progress and Plans Mike Hildreth University of Notre Dame representing SLAC T-474/491 &
Output to accelerator area drive laser: MHz, sync’d to master RF = 1064 nm ~7 ps pulses ~10 watts average (~120 nJ/pulse) chopper wheel: ~100Hz,
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
IPBSM status and plan ATF project meeting M.Oroku.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Stabilization of Focus at ATF2 David Urner University of Oxford.
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
IR/Backgrounds & Beam Instrumentation Summary Tom Markiewicz/SLAC ALCPG’09, UNM, Albuquerque 3 October 2009 Six Sessions, 20 talks Instrumentation: –WAB.
Current Status of LASER FRAME for KEK-Nano BPM (Tentative results of resolution test) Second Mini-Workshop on Nano Project at ATF December 11-12, 2004.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Summary FD Support System
Drive-Laser Commissioning Status and Plans
Emittance Diagnostics
ATF/ATF2 Control System
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Commissioning plan for
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
ERL BPM System Mike Billing, Mark Palmer
IP configuration session
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

July 15, 2009 Interferometer Installation Report Mike Hildreth, Kurt Jung, Mickey McDonald Université de Notre Dame du Lac

(1)Schematic Full System (Later): –monitor relative (later, absolute) vertical positions of the two IP Steering feedback BPMs Optical path: –This installation July 15, 2009 QD10BQD10AQM11QM12QM13QM14 BPMBPM MFB2 Optical Path

(2)Photos July 15, 2009 laser interferometer retroreflector student CCD camera

(3) More Photos July 15, 2009 interferometer retroreflector CCD camera view from aisle sideview from cable tray side

(4) More Photos July 15, PCs, one for laser, one for CCDs VME crate for interferometer DAQ

(5) Initial Data: BPM Vibration July 15, 2009 time (sec)BPM position (nm) 35 nm rms points every 1ms projection points every 1ms time (sec)BPM position (nm)

(6) Initial Data: Overnight Stability July 15, 2009 time (sec) BPM position (nm) 1m1m Scatter around Central value RMS: 41nm

(7) ~One Hour run today July 15, 2009 time (sec)BPM position (nm) RMS: 46nm

(8) Camera Data from Today July 15, 2009 x(1) – x(2) (microns)y(1) – y(2) (microns)

(9)Status Interferometer & Camera systems aligned and ready to record data DAQ problems solved –(needed TTL trigger input; used NIM converter module) –DAQ now in final configuration for data-taking For each beam pulse, we will take 3 interferometer points spaced by 0.5 ms after Kicker Fire Pre-Trigger camera data will be updated every 30 seconds with an average position computed in the DAQ –One Remaining Issue: Define and test PV read/write/log with EPICS IOC Domo Arigato Gozaimasu to Terunuma-san and the KEK Team for all of their help! July 15, 2009

(10) MFB2 Installation Plan (TBC) July 15, 2009 QM13 Laser CCD Camera Honeycomb Optical Table (ND supplied) FFTB Mover

(11) plan view: July 15, cm 90cm Beam FFTB mover plate BPM Laser