Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.

Slides:



Advertisements
Similar presentations
WHAT IS STEAM PRO? Thermoflow, Inc.
Advertisements

OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Agenda Cost Management Capital Budgeting Payback Period
Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 26-1 CAPITAL BUDGETING Chapter 26.
Thermoflow, Inc. TOPS stands for Thermoflow’s Optimization System and is a general purpose optimizer for use with Thermoflow’s core programs. TOPS runs.

PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014) Batch Processing Modelling (Unit Procedures Initialising)
CASH FLOW ANALYSIS PROFITABILITY. GENERAL CASH FLOW APPROACH CASH FLOW ANALYSIS PROVIDES A RIGOROUS METHOD TO COMPARE PROFITABILITY USES THE SAME COMPONENTS.
Business plan overview (1)
Unit 4: Utilizing Financial Documents
IE 3265 Production & Operations Management Slide Series 2.
STEAM PRO is a highly automated system design tool – a heat balance program specifically intended for design of steam power cycles.  Use STEAM PRO to.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
MISS. RAHIMAH BINTI OTHMAN
Solutions to Applesoft Case Work Solutions and Hints to the Applesoft Worksheets.
Project Planning and Capital Budgeting
Part 6 Financing the Enterprise © 2015 McGraw-Hill Education.
Chapter 5 Presented by Group 6
Accounting Principles, Ninth Edition
Profitability Analysis Our client is evaluating a number of scenarios How does our process compare with the others?
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Duration 1 hour 30 mins Investment Analysis. Topics to be covered Review of last session Investment background Capital budgeting Methods.
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Simulation Of Bioprocess ERT 315
PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014) Batch Processing Modelling (Component Registration)
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
Process Scheduling, Resource & Inventory Tracking.
Presented by Demetri Petrides INTELLIGEN, INC.
Entrepreneurship Business Plan Utilizing Financial Documents.
FINANCE MODULE. The various subsystems Financial Accounting Investment management Controlling Treasury Enterprise controlling.
1 Theory of Investment - Rahul Jain. 2 Investment is … most unstable component of GDP. changes in investment are the primary cause of the business cycle.
Profitability Analysis-II Chapter 8 & 9 in T&S CH EN 5253 Terry A. Ring.
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Introduction of Process Modelling and Simulation of Batch Process PTT 303/2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
FACILITIES PLANNING ISE310L SESSION 13 Chapter 14, February 19, 2016 Geza P. Bottlik Page 1 OUTLINE Questions? Quiz Stories or experiences? New Homework.
By: Robert Anderson Economic Feasibility Model for Biogas Facilities in Ontario.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
ERT 323/2 SIMULATION FOR BIOPROCESS ENGINEERING SEM 2 (2012/2013) Modeling & Simulation of Bioprocess: ‘THROUGHPUT ANALYSIS & DEBOTTLENECKING STRATEGIES’
PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
Operating Budgets: Non-Manufacturing Budgets
Unit 4: Utilizing Financial Documents
Process Economics Factors that affect profitability
Chapter 12: Kay and Edwards
Process Economics Factors that affect profitability
Modeling & Simulation of Bioprocess: ‘THROUGHPUT ANALYSIS &
Cost Concepts and Design Economics
OPEX and Profitability Analysis-II
Unit 5.1 Utilizing Financial Documents
It is now possible to schedule operations based on their finish time
Economics and Profitability
Costing and Finance P R Upadhyay.
Unit 4: Utilizing Financial Documents
Concepts and Objectives of Cost Accounting
Ch. 8 Utilizing Financial Documents
Progress Presentation on: Production Cost Analysis By
Production and Operations Management
Presentation transcript:

Equipment Rating & Economic Evaluation

Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors Generating Economic Reports Strategies for increasing profits

Equipment rating  Design mode vs. rating mode

Equipment sizing vs. rating  Sizing- calculate the dimensions of an equipment for a fixed operating condition  Rating- calculate the percentage of use of an equipment with fixed dimensions  Default setting in SPD: Design Mode (sizing) when equipment dimensions are not specified, e.g. reactor volume, filter area, etc. In Design Mode, a max available size for the equipment is specified. If the calculated equipment size > max allowable size, SPD will employ multiple pieces of equipment (with each equipment size < max allowable size.)

Filter (PFF-1) sizing  Right click your PFF, choose “Equipment Data” to check on the calculated filter area  Remember that: Flux =Vol/(Area x time)  Data needed: Flux & time (revisit by right click PFF Operation Data/ FILTER-1 Feed volume determined by SPD from P-1 (reactor)  Hence, SPD calculates filter area Design mode Calculated filter area = 1.5 m 2 Max available size = 80 m 2

Rating  If Rating Mode is selected, the size & number of the units can be specified SPD takes this info to calculate the output of simulation, e.g. M&E balances, process time, etc.  Task: switch the PFF sizing method to Rating Mode ( right click PFF/ Equipment Data) & do the following changes: Filter size = 2 m 2 (1unit) Filter flux = 150 L/m 2 hr (revisit by right click PFF Operation Data/ FILTER-1, Duration, Filtration Time)  Save your tutorial as different file name

Working session Determine the filtration time when PFF os switched to Rating Mode

Economic evaluation  Stream classification  Economic evaluation features

Stream classification  We need to classify all input and output streams as raw materials, revenues or wastes (solid, liquid or gaseous) & supply their cost data before we perform the throughput analysis, plant economic evaluation & environmental impact assessment calculations.  By default, SPD estimates a purchase or selling price for a stream based on the price of each component and the composition of the stream.

Stream classification  Output streams: Classification:  “C” = Revenue  “Emission” = Emission  “B + Heptane” & “Wash out” = Aqueous Waste Cost:  Emission aqueous waste disposal cost = $0.10/kg (click “Set by user” first)  Revenue stream (automatically calculated based on stream composition) Pre-inserted cost data  Main Product Rate: Stream “C” Reported based on “single component C” Path: Tasks/Stream Classification

Engineering economic review  Cost broken down into: Capital cost  Equipment cost  Building costs Operating cost  Utilities  Labor  Raw material  Index of economic performance Return on Investment (ROI)  Annual Income/ Capital costs *100%  Usually aim for 30% Internal Rate of Return (IRR)  Discounted Cash Flow Payback Period/Time  Amount of time to repay automatically  Usually aim for 7 years or less Net Present Value (PVV)  Value of project in current year currency

Cost factors (operation level) For each unit procedure you can set cost data for each operation under “Labor, etc.” tab Path: Right click an equipment procedure/ Operation Data/(any operation) Create new labors Can only be change in Databanks/Heat Transfer Agents

Cost factors (equipment level)  Path: Right click an equipment procedure/ Equipment Data/ (any operation)  Purchase Costs Automatically calculated Set by user  Adjustments Change material of construction Change opening and maintenance costs

Cost factors (section level)  Section- segment or a group of equipment  Capital cost adjustments (piping, instrumentation)  Operation cost adjustments (labour, facilities, QA)

Cost factors (flowsheet level)  Path: Edit/ Flowsheet Options/ Economic Evaluation Parameters Right click on Flowsheet Economic Evaluation Parameters  Cater for Overall Financing Time Valuation Income taxes

Economic evaluation  Pre-simulation check: All streams are classified, especially the main revenue stream Filter setting:  Rating Mode  Area = 2.0 m 2  Flux = 150 L/m 2 h Set under Recipe Scheduling Information  Number of batches  Cycle time = 12hours

Economic evaluation steps  Solve M&E balances  Task/ Perform Economic Calculations  Results: View/ Executive Summary Reports/ Economic Evaluation Reports/ Cash Flow Analysis Report/ Itemized Cost Report

Strategies to increase profits  Increase number of batches Try larger batches, e.g. maybe 100? Let SPD calculate the maximum batches  Debottleneck Size debottleneck i.e equipment capacity Time debottleneck i.e higher equipment use  Capital costs will rise with equipment sizes  Operation costs can be optimised with better labor and facility usage