Inspecting the case of an unexpected Aircraft on Ground (AOG) condition.

Slides:



Advertisements
Similar presentations
FLIGHT AND DUTY TIME RECORDS INSPECTION. Has operator formulated flight and duty time limitation for flight crew Does flight and duty time limitations.
Advertisements

Riga International Airport
Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
FLEXOTECNICA SERVICE TEAM AT NORTH AMERICAN CERUTTI CORPORATION (NACC)
Remote Operations. Learning Objectives Identify areas of concern regarding conducting remote operations. Develop methods or procedures for addressing.
Energy Service Fossil Product Portfolio
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
ACMA TIME TO MARKET Challenges and New Ideas Team Members : S Ramanujam, Brakes India Ltd, R V Shah, Jaya Hind Industries Ltd Amitabh Anand, NRB Bearings.
Effective Contract Management Planning
About us Jet Air Equipment is a certified distributor of aviation spares with office in the Netherlands, Europe. More than 25 airlines worldwide are our.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Striving to exceed customer demands by delivering the best.
Hangar Maintenance (on Aircraft)
Gate Gourmet: Success Means Getting to the Plane on Time
WP5.3. Deployment of ICT Toolbox Milestone 1 - Action Plan Leszek Andrzejewski Institute of Logistics and Warehousing Kick - off Meeting – Malmoe 15th.
Slide 2-1 Aircraft Unit 2. Slide 2-2 Unit 2 Objectives 1.Describe the interaction of the EDSD as it relates to the aircraft function. 2.Identify the difference.
AGILE DELIVERY FACILITATION Agile Project Manager should see his stakeholders as kids and aim to help them be successful in their respective goals, each.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Skill Management for accelerator operation and maintenance. Hiromi Inokuchi National Institute of Radiology Sciences, Japan
Supervision and Oversight in Procurement as a Tool of Efficient Project Implementation.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
EMEA Techshare 2009 The Future Begins Support, Backbone and Escalations Csaba Virágos - Operations Manager Avaya GSS Backbone Team - Budapest.
Component Reliability, Repair Agreements (LTA / PBFH) and Warranty Management B787 Trust in All Transactions Commercial Aerospace Aftermarket Consultancy.
Software Project Management
Global Production, Outsourcing, and Logistics McGraw-Hill/Irwin International Business, 6/e, 7/e Portions © 2007, 2009 The McGraw-Hill Companies,
COMPOSITE TRANSPORT WORKSHOP ON DAMAGE TOLERANCE AND MAINTENANCE The information presented in this presentation is designated as proprietary to Air Flight.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
BPHC Infectious Disease Bureau, Education & Outreach Site Visit.
2015 Automation of NDT In-Service: strategy & innovations Airbus Operations 58 th Annual A4A NDT Forum Airlines for America Alvaro ESPADA TEJEDOR Airbus.
Airlines and Aircraft Airline Services Airline Evaluation Airline Contracts.
UNMANNED AVIATION QUALIFICATION FLIGHT SKILLS TEST BRIEFING UAVAirways Limited | Registered in England No: | UAQ Skills Test v1.0.
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
An international supplier of products, equipment and services to the Drilling, Mining, Resource and Construction sectors.
Page 1 Confidential and proprietary information of WindCom Wind Composite Services Group Introduction to Services.
MRO Europe: Engineering & Maintenance Succeeding with Entry into Service.
Preparing for the unexpected AOG
Preparing for Tomorrow’s Supply Chain 1 Sponsored by UPS Joachim Mirabaud Head of FHS Engineering and Pool Management Airbus Dr Aaron Scholz Project Manager.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Supply chain and logistics
 Our system supplies the data and manuals that an airline needs to fly -- at the maximum levels of safety, security, and efficiency -- based on The system.
MRO Europe September Madrid- Spain Oct Ref.: EAHLDG Consultant/ MRO EU/ London MRO Europe October London- UK Staying.
Supply Chain Solutions Peter Schmidt authorized agent for.
Lines of activities and new projects of the Ural Chamber of Commerce and Industry April 2013 Yekaterinburg 1.
October 11, 2010 Equipment Intelligence Overview Telematics & Data Logging for Engineering Departments.
The USA’s leading lawn and power equipment company, Metrowest, continues to provide free home demonstration. Along with, it would also provide spare parts.
Welcome.  CPW  Provide initial and ongoing IPAWS communication  Establish communication channels with agents  Provide information and supporting documentation.
 Copyright 2014 CTPM Australasia – For further information please refer to: Ensure your New Equipment Adds Value to your Business Napier.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Provincial Blue Drop challenges
Kevin T. Rodgers, P. Eng., CPBE, CBNT Director of Customer Service
Quality Management Process
MRO EUROPE – 2015 Case Study: Preparing for the Unexpected AOG
RTK Contractor Management Process Book
The Software Quality Challenge
BUSINESS PROCESSES MAP
OPENAP
PMIS Initiating a Project Application of Project Management Processes Project Charter Stakeholder Analysis and Stakeholder Register 2. Planning.
Professional Staff Allocated
ISO-9001 Quality Management System
World Health Organization
1/27 Geoffrey MORMAL Founder & CEO
Increased Competition = Lower Cost to Taxpayers
AN OVERVIEW OF EYENG SUPPLY CHAIN Sobin Hussain EYEng | Aug 2018.
Procedure PP, Project Plan Configuration
EM Phases Conference Prague Oct 2018
Blanche, You did a very good job coordinating the pre-workshop meeting across multiple functions and leading during our workshop meeting. Well done.
Presentation transcript:

Inspecting the case of an unexpected Aircraft on Ground (AOG) condition.

 AOG of Customer at Home Base (WAW)  Suffer Very Few issues  Home base well provisioned  Spares  GSE  NDT  Workshops  Risks  Operator Supplied Units (Logistics)  Lead Times  Oversize/DG Shipments  Customs  Manpower Availability  OEM response times – Engineering Requests

 AOG of Customer at Remote Base  What can cause Risk and Delay? FactorsRisksMitigation Travel Visas Environmental/Health/Safety Accommodation Flight Availability Dedicated AOG Engineers AOG Protocol Composition of Team/GSE Improper diagnosis of Defect Live monitoring of Defect (AHM) Establish MRO Partners in Advance Flying Spanner Documentation Needs Connectivity Issues Updated/Controlled USB data Sets Material (GSE/Parts) Availability Oversize Customs DG 24/7 Logistics Team Contracts with Multiple Shippers Operator Engagement Aircraft Charter

 AOG of Customer at Remote Base  How we can mitigate challenges when crew exceed time  Send Adequate Resource  Correct Identification of work to be done  Plan to work 2 shifts  Use local MRO assistance where possible  Re-assessment of job in hand as soon as first team arrive  Exploring Challenges when there is a need for new equipment for engine maintenance and how we can prepare for unexpected AOG.  Expanding LOTAMS Inventory  Continuing Investment  New PART-145 Approvals  Manufacturer/ Partner MRO Support  Focus on more portable tooling

17 Stycznia Street 45C Warsaw, Poland phone: Thank you for your attention AOG: