Expt. Area meeting – December V. Bobillier1 Cabling installation status
Expt. Area meeting – December V. Bobillier2 Cable trays installation status All long distance cable trays installed. Few additional cable trays in the Velo region will be finished by the end of the year hopefully. Cable trays to go from PP to Fixed Point for Calo and Muon nearly finished.
Expt. Area meeting – December V. Bobillier3 Long distance links (from PP to CH) current status (optical fiber) 4U Optical patch panels:Installed in all racks 1U TTCocs:Installed in all racks Data and L0 trig multi-ribbon cables:Pulled Cassettes and MPO plate installation, connection and testing:Starting soon TTC optical fiber cable installation and tests:Pulled, to be tested soon Goal: Have the long distance optical links ready and tested end of this year.
Expt. Area meeting – December V. Bobillier4 Long distance links (from PP to CH) current status (copper) Connector installation and testing status (1):
Expt. Area meeting – December V. Bobillier5 Long distance links (from PP to CH) current status (copper) Connector installation and testing status (2):
Expt. Area meeting – December V. Bobillier6 Long distance links (from PP to CH) current status (copper) Still quite a lot of cables and connectors to be installed and tested
Expt. Area meeting – December V. Bobillier7 Long distance links main activity left January and February: RB84 side for Velo cable pulling In addition: All cables from patch panel racks to sub-detectors have to be installed…
Expt. Area meeting – December V. Bobillier8 Questions / Comments ???