Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
1 Accelerator R&D for Future Large Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Multi-OTR Project meeting C. Alabau Pons J. Alabau Gonzalvo C. Blanch J.V. Civera A.Faus-Golfe J.J. Garcia Garrigos (IFIC-Valencia)
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
ALICE Data Acquisition Ben Shepherd MaRS Group ASTeC STFC Daresbury Laboratory.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Apex Target Marco Oriunno, April 23, Design and fabrication by: Marco Oriunno, Dieter Walz, Jim McDonald, Clive Field, Douglas Higginbotham, and.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Progress report on multi-OTR fabrication and schedule IFIC-SLAC  Design and Hardware fabrication  Realistic Optics and Beam Dynamics simulations  Controls.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Fiber Loss Monitor and Carbon IP Scanner Setup and operational tips August
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Confidential WINGTIP ODIN User Guide. Confidential  Run the Odin3 v  Connect with the Gear Fit (Target should be download mode)  Connect PC with.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
ATF2 Status N.Terunuma, KEK
Emittance Diagnostics
ATF/ATF2 Control System
3rd ATF2 Project Meeting, December 18-20, 2006
WG2 Summary: Diagnostics, measurements, and commissioning
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
What am I working on… H. Loos 08/02/2010.
Beam-Based Alignment Results
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Commissioning Experience
Injector Diagnostics Status
Presentation transcript:

Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team

Overview 4 OTR monitor has been installed in the zero-dispersion part of EXT line They will take fast size and emittance measurements with high statistics Design based on existing OTR1X with improved features and 2um resolution They are installed near WS for comparison and confirmation of OTR as a beam emittance diagnostic device OTR0  x: 118 um  y: 9 um

H/W installation February 2010: Calibration set-up will be added, first design Assembling and first tests at IFIC labs after fabrication

H/W installation February 2010: Vacuum test made at SLAC with OTR without OTR

H/W installation April 2010: the 4 OTRs were assembled at ATF clean room May 2010: the 4 OTRs were installed in the EXT line

OTR Beam Tests - Target Damage Seen

First calibration tests with beam June 2010: - Exercise and calibration of vertical and horizontal movers and read-back potentiometers -Tests of 4 OTRs during beam time: beam seen but 3 targets (nitrocellulose coated aluminum) were damaged (4x10 9 e - per pulse) -Cameras suffer from radiation, some pixel are dead.

Target research Ongoing: -Research about most adequate target material is on going. Possible candidates for the fall running are: aluminum coated mylar, aluminum coated kapton or 100um aluminum foils - In addition to the new types of targets, we are going to modify the existing target holders to hold a vertical and horizontal 10um tungsten wires. By using the vertical and horizontal movers each OTR can be used as a wire scanner. The normal step size in the vertical plane is 2um and 10um in the horizontal. That way we can compare the size measured by the wire and the size measured by the OTR. Both measurements will be in the exact same Z position so calibration will be easy and unquestionable.

H/W developments Ongoing: - Calibration set ups are already finished, they will be installed before the fall running. - Some shielding is needed in the upstream of the cameras. Design and fabrication of a lead support that would attach to the main OTR stand is on going.

S/W development On going: - User interface is being developed in Matlab’s GUIDE. - Connected to multi-OTR via EPICS. - Will be integrated in the Flight-Simulator.

S/W development To do: Single OTR features: Stage movement and position readback Machine protection Status displays Limit switches Target in/out OTR Working/Off modes Setting eventual new calibration or Working mode start point Automatic beam finding Scanning an area Using loss monitor to center beam Using neighbour cavity bpm’s to track the beam (optics issue) Ellipse fitting when beam spot found Multi OTR features: Emittance measurements (assuming beam found in all 4 OTRs) Automatic emittance calculation procedure User just press a button and receive the emittance value Other: OTR1X integration, realistic beam simulations, non-zero dispersion contribution...