BLIP Status  Safety o Ni-63 contamination in TPL (~a week ago) – Decontamination mostly complete, maybe complete decontamination today  Production o.

Slides:



Advertisements
Similar presentations
January Homework Healthy Habits Calendar. Your 2 nd Trimester Homework is HERE!!
Advertisements

Line Efficiency     Percentage Month Today’s Date
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC Karlsruhe IEKP - Universität Karlsruhe (TH)
G2p Safety Readiness Review January 17, 2012 Expected Radiation Exposure Levels from Activated Local Dump George Kharashvili, Radiation Control.
S3: Timescale for calibration factors At the frequency of the calibration line: Using this and going around the loop we obtain: Implemented in LAL/LALapps.
QlikView in the Enterprise BI Stack. Sample Architecture – Metadata Integration This architecture shows the use of a custom metadata database as a data.
Target Activation Study Paul Hodgson The University of Sheffield.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
EEMS User Group Meeting Date5 th June 2013 Time10.30 VenueCollabro Limited.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
Linac Status May 19, 2015 Time Meeting D. Raparia.
Chapter 22 Business Statistics McGraw-Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved.
After last meeting Matt, Riad and I discussed January energy choice…  Focus on Physics paper measurements  Focus on 5 MeV systematics  Pick “final”
Experimental studies of spatial distribution of neutron production around thick lead target irradiated by 0.9 GeV protons Antonín Krása&Vladimír Wagner.
9 Jan Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 TestModWireDateSourceCurrent/st raw DurationTests 90 Sr Scans I002A24L20-31.
Solar Cycle Electron Radiation Environment at GNSS Like Orbit A. Sicard-Piet (1), S. Bourdarie (1), D. Boscher (1 ), R. Friedel (2), T. Cayton (2), E.
Tim Bolton, KSU Run 2B L0/L1 PRR Aug 7, Radiation Testing at KSU for the Run 2B Upgrade  L0/L1/L2 sensors from both HPK and ELMA tested with 7-14.
Studies of Deuteron and Neutron Cross-sections Important for ADS Research Vladimír Wagner Nuclear physics institute of CAS, Řež, Czech Republic,
Principle Investigators Suzanne V Smith CAD, BNL
Physics 131 Introduction Instructor: Dr. Michael Chen Office: P9442 Office Hour: MWF. 10:30-11:30am; or by appointment
Algebra II – Week 1 (Jan. 5 th – 9 th ) Monday – Introduction; Textbook, Pgs , 5-43 odd Tuesday – Warm-up; 1-4; Notes, Section 6; Workbook, Pg.
4.1.1: Do you ever feel like you are going in circles? Today we will review the special angles of the unit circle that we talked about in Chapter 1 and.
Linac Status June 16, 2015 Time Meeting D. Raparia.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Standard Deviation A Measure of Variation in a set of Data.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
SAGE: status and future SAGE: V.N. Gavrin Institute for Nuclear Research of the Russian Academy of Sciences, Moscow.
Neutron production in Pb/U assembly irradiated by 1.26 AGeV deuterons. First experimental results Ondřej Svoboda Neutron production in Pb/U assembly irradiated.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
JASMIN December Counter Experiments (T-972/994) Toshiya SANAMI on behalf of JASMIN Counter team JASMIN Counter team H.Arakawa, M.Hagiawara, Y.Iwamoto,
ESB Networks MCR0177 – DG4 for Local Authority Public Lighting 23rd April 2010.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Itacil C. Gomes I.C.Gomes Consulting & Investment inc. Project X Forum on Spallation Sources for Particle Physics March 19-20, 2012 Fermi National Accelerator.
FTOF Status Anton A. Izotov, Frascati
Neutron production and iodide transmutation studies using intensive beam of Dubna Phasotron Mitja Majerle Nuclear Physics Institute of CAS Řež, Czech republic.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Three years of cross-section measurements of (n,xn) threshold reactions at TSL Uppsala and NPI Řež O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová,
Transmutation of 129 I with high energy neutrons produced in spallation reactions induced by protons in massive target V.HENZL Nuclear Physics Institute.
Preinjectors Status D. Raparia January 26, 2016 Time Meeting.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Investigation of the proton-induced reactions on natural molybdenum.
Copyright 2015 Davitily.
JMU Dark Current Tests By: Kevin Nash.
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Luminosity Determination
Improvement of beam current in KIRAMS-13 using upgrade of
Development and characterization of the Detectorized Phantom for research in the field of spatial fractionated radiation therapy. D. Ramazanov, V. Pugatch,
Baby MIND beam test status
QRM & Concurrent Manufacturing
Two way tables CoachRailCarAirTotals Jan Feb Mar Total
Irradiations at LANSCE May 2 –
عمل الطالبة : هايدى محمد عبد المنعم حسين
آشنايی با اصول و پايه های يک آزمايش
Standard Deviation Calculate the mean Given a Data Set 12, 8, 7, 14, 4
Regression Computer Print Out
SEM monitors tests PSI February MeV protons
Math and Reading Benchmarks: Feb 27th & 28th
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Performed experiments Nuclotron – set up ENERGY PLUS TRANSMUTATION
The need for cross section measurements for neutron-induced reactions
Licensing update ESHAC #7, October 2017
Standard Deviation Mean - the average of a set of data
Presentation transcript:

BLIP Status  Safety o Ni-63 contamination in TPL (~a week ago) – Decontamination mostly complete, maybe complete decontamination today  Production o RbCl target (Sr-82 production) irradiation started 5 Jan, 116 MeV o Plan to remove first BLIP target and insert new target on 26 Jan (3 weeks) o Plan to start Strontium chemical separation in the TPL on 2 Feb o Plan first delivery of Sr-82 to first customer on 11 Feb  Research/Other o Foil activation for BLIP current calibration completed on 7 Jan. o March 2015, Irradiation of Thorium target for Ac-225 research, 200 MeV, 10 days full current, concurrent with Sr-82 production o Other R&D irradiations to be scheduled P. Pile for L. Evers

BLIP p-Aluminum activation study for current integration comparison (1/7/15, 10 minute irradiation – LE, SK, DM) Average current calculated from BLIP current integrator readings BLIP (local) Integrator = uA Raster system integrator (MCR) = uA Average current deduced from activation measurements Square foil: – From Na-22 activity: I=111.0 uA +/-10% – From Na-24 activity: I=113.8 uA +/- 10% Circle foil: – From Na-22 activity: I=112.0 uA +/-10% – From Na-24 activity: I=107.9 uA +/- 10% Average = /- 2.5  A (standard deviation) Conclusion, within errors, integrator readings are in agreement with measurements

BLIP average beam current (LogView), 5 Jan – 20 Jan 2015