Beth Messiah Congregation Building Committee Status March 27, 2010 Major Congregational Needs Additional Sanctuary seating Continuous enhancement of our.

Slides:



Advertisements
Similar presentations
Grimsby Secondary School
Advertisements

Contemporary Art Nouveau Mary Vega ID 244 Lina Sibert March 22, 2007 Contemporary Art Nouveau Mary Vega ID 244 Lina Sibert March 22, 2007.
Design for Elderly and Disabled Environments:
Cathedral of the Immaculate Conception Project Information Session.
Architecture CAD living sleeping service SPACE PLANNING
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.
Perimeter Fence : Removal & Replacement Building #3 Renovation : Administrative Offices & Continuing Education Commercial Kitchen: Cafeteria & Cooking.
Chapter 16 Floor Plan Symbols.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
Anne & Sarah Harrington NVAR Top Producers Anne Cell: (703) Sarah Cell: (703) Fax: Website: www.
Construction Project Michael J. Bruno Bruno Construction Management.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
Furniture, Fixtures and Equipment Guidance Document CLC-9 April 2014 for State Operated Campuses 1.
Building Renovations and Improvements College Park Church is engaged in major Renovations and Improvement of its building. This is the first large renovation.
Redecorating Committee Report. Qualities of Church Abundance Unity Classic design Comfort Sharing Light Growth Beauty Joy What qualities do we want to.
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Church Renovation/ Expansion Proposals Willowdale.
Fund-raising at Central Methodist Nursery School Progress over the last 15 years!
A Christian community with so much to offer…. We are aiming to improve our premises to enhance our mission.
Understanding House Plans
CHAPTER 8: PLANNING & EQUIPPING THE KITCHEN
Types of Drawing Kitchen DesignElectrical Plan.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
The Art of Visiting: How to Help Individuals Visit the Places and People They Love Jane F. Dailey, AAHID.
FMP Update to the Congregation Sunday July 20 and 27, 2014.
Classroom Safety. Staff Responsibility  Supervise the children at all times.  Maintain at least the minimum adult-child ratio.  Develop safety limits.
Riverside Community Schools Overview of Summer Maintenance Projects.
Bedrooms4 Bathrooms2 Garage2 Media1 House Width11.5m Total Area200m 2.
20513 Lochmoor Southwest Corner of 8 mile and Harper, see map on last slide A beautiful 3 or 4 bedroom bungalow with dining room, living room, den/study,
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
Grace Bible Church Ministry Goals & Master Plan Presentation.
Grace Bible Church Building Renovation Overview. Existing Floor Plan.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Light Fixtures Ceiling/Wall fixtures –surface –recessed Fan (exhaust) Junction box Fluorescent fixtures.
Types of Circulation (Traffic) Patterns within a Home
EDWARDS CONGREGATIONAL UNITED CHURCH OF CHRIST CONGREGATIONAL MEETING July 10, 2011 SCHOLTZ GOWEY GERE MAROLF A R C H I T E C T S & I N T E R I O R D E.
Welcome to Carlton Primary School Come inside! We would love to show you around….
By: Diego Molina & Gabriel Gomez. Floor Plan Total Budget: $33,
2 Tullyheights Aughnacloy BT69 6HN CPS are pleased to welcome onto the market this excellent 3 bedroom semi-detached property located close to all amenities.
The exterior rebuild is nearly complete. We are about finished with the first fix in the classrooms and toilets. All the flooring, fixtures and fittings.
MY House By Jayuana Ware. Master Suite The Area of the floor is 128. The color is shell frost. The type of floor is carpet. The Price is $ 1.23.
Overview of MSS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
What do all of these chairs have in common? How will they support your back? Do they all have seats? Can you see legs on these chairs?
Foods & Nutrition Unit 4—Kitchen Organization. 4.1—2 Terms Work Center Work Triangle.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
CAD 448 Traffic Circulation. Traffic Circulation is the movement of people from one area or room to another You plan for maximum efficiency of movement.
By: Tiilene Barber & Carman Dorsey. $219,777 ( MORTAGE ) 5 BEDROOMS, 4 BATHS, 0.14 Acres $13, ( this times.06) $ 232,963.62( this is for when u.
1 Three Basic Areas of a Residence Sleeping Area – Where the family sleeps and rests. Living Area – Where the family relaxes, dines, entertains guests,
House Project.
Vocabulario. living room bedroom kitchen dining room.
Presents 33 C O L C H E S T E R RO A D W e s t o n, M a s s a c h u s e t t s 13 Room Colonial with 5 Bedrooms, 4 Baths, 2 ½ Baths,
Wooden Wall Shelves Buy Corner Wall ShelfBuy Corner Wall Shelf, which is unique & Wonderful in its own way and spacious artsy design that will add to any.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Lounge Closely Seated Permitted Persons 80
TOT SPOT proposal.
Kasbeer Hall, 15th Floor of 25EP
Updated home in good location
realestatemarket.com.
Рiglet has a small house. He has a hall, a kitchen and a room
Operations Department
Community Life at St. Giles
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Park Place Wesleyan Gala 2019
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
Presentation transcript:

Beth Messiah Congregation Building Committee Status March 27, 2010 Major Congregational Needs Additional Sanctuary seating Continuous enhancement of our worship space Replacement of worn building materials Classroom enhancements to strengthen education Storage Space

Beth Messiah Congregation Building Committee Status March 27, 2010 Short Term Enhancements  Shelf for purses, books, etc.  Storage for maintenance supplies Bathroom Improvements  Permanent “bulletin bars” for hanging educational materials, etc.  A playground item for smaller children Classroom Improvements (children’s education)  New refrigerator  New gas range / oven Kitchen Improvements (Social Hall) Completed

Beth Messiah Congregation Building Committee Status March 27, 2010 Short Term Enhancements  New carpet and/or flooring  Improved foyer lighting Foyer and Hallway Improvements  Complete a plan to build new metal barn  Concrete pad and electricity  Replace existing wooden barn Exterior Storage Space Completed