I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

 Greenpoint Environmental Benefit Projects Community Meeting 1 March 21, 2012.
Land Treatment of Mine Water Presented by: Andre Sobolewski, Microbial Technologies.
Tonnie Cummings National Park Service, Pacific West Region National Tribal Forum on Air Quality May 14, 2014.
Environmental Health XIV. Standards and Monitoring Shu-Chi Chang, Ph.D., P.E., P.A. Assistant Professor 1 and Division Chief 2 1 Department of Environmental.
Stakeholders’ Role in HIA Oil Drilling and Development Project in California Dr. Mary McDaniel, Kathleen Souweine, Dr. Christopher Ollson, Lindsay McCallum.
Heavy metals (Pb, Cd and Zn) levels in roadside soils in Nairobi County.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Characterizing Storm Water Runoff from Natural Gas Well Sites in North-Central Texas Paul F. Hudak and David J. Wachal Department of Geography University.
1 of 25 The EPA 7-Step DQO Process Step 5 - Define Decision Rules 15 minutes Presenter: Sebastian Tindall DQO Training Course Day 2 Module 14.
Screening Level Ecological and Human Health Risk Assessment Poplar Point, Washington, DC.
Mercury Sources to Water and Associated Impacts Chris Piehler.
Water Supply Planning Initiative State Water Commission November 22, 2004.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Multimedia Assessment for New Fuels: Stakeholders’ Meeting September 13, 2005 Sacramento, CA Dean Simeroth, California Air Resources Board Dave Rice, Lawrence.
Annual Site Environmental Report (ASER) Calendar Year 2011 West Valley Demonstration Project Presented by: John Rendall, Regulatory Strategy.
The National Ambient Air Monitoring Strategy and Network Design Westar Spring 2007 Business Meeting April 4, 2007 Bruce Louks, Idaho Department of Environmental.
I.Summary of technical guideline II.Reviews III.Recommendations.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Italy: the new legislation on the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 5-7th June 2006, Athens,
1 June 23, 2004 Sacramento Thermal Spraying ATCM Second Public Workshop.
Environmental Technology Council EPA /State / DOD Region IV Environmental Conference June 2005 Joydeb “Joy” Majumder, EPA Region 4.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Public Workshop Airborne Toxic Control Measure (ATCM) for Motor Vehicle and Mobile Equipment Coatings Public Workshop Airborne Toxic Control Measure (ATCM)
1 May 4, 2004 Sacramento Thermal Spraying ATCM Public Workshop.
SEDIMENT EVALUATION FRAMEWORK: THE APPLICANT EXPERIENCE Jeffrey Peterson, Ph.D.
Phase II National Storm Water Regulations What’s in it for you?
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Developing a Cumulative Effects Monitoring Program for the Saint John Harbour – Contaminants Karen Kidd and Angella Mercer Canadian Rivers Institute, UNB.
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Board Meeting June 27, 2013 California Environmental Protection Agency Air Resources Board Update on Recommendations to the California Public Utilities.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Modelling noble gases Radiation Protection of the Environment (Environment Agency Course, July 2015)
DOE ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP BIOTA PROTECTION Stephen L. Domotor (202)
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Health Outcomes in Escambia and Santa Rosa Counties Issue:  Higher health risks found in: Infants Infants Elderly (age >65) Elderly (age >65) Blacks Blacks.
1 ITSA Meeting April 2, 2004 San Diego Thermal Spraying in California.
Potential Changes to Sections and 307.9: Standards Applicability and Attainment Gregg Easley TCEQ Water Quality Standards Team September 6, 2007.
Overview of the AB2588 Air Toxics “Hot Spots” Program California Environmental Protection Agency Air Resources Board.
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
Connie Brower NC DENR Division of Water Resources.
David K. Paylor Virginia State Board of Health March 17, 2016.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
An Overview DCC Annual Retreat February 20, 2012.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Linda C. Murchison California Air Resources Board May 6th, 2002 Environmental Justice Program Barrio Logan Case Study Air Resources Board California Environmental.
Ascending to IED compliance
Proposed Plan for No Further Action
New Guidance for Air Quality Impact Assessment A Review
MONITORING Mr. Jan Prášek IPPC Agency.
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Public Meeting For Scoping Of An Environmental Impact Statement (EIS) For The Perham Resource Recovery Facility: Introductions Agenda Good evening, my.
Environmental Protection Agency
Ascending to IED compliance
Welcome.
Legacy Contamination Public Engagement Meeting
Land Quality Groundwater Monitoring at Sellafield Presented by
Van Wert, OH Water and Wastewater Element Training
EPA’s Current Air Toxics Activities
Chapter 5: Water management and adaptation
Pearce Creek DMCF Baseline Exterior Monitoring Spring 2017 Results
Evaluation and Control of Beryllium Exposure in Shipyards Risk Management Panel Project NSRP Subcontract No March 12-14, 2019 Charleston, SC.
Incorporating metal bioavailability into permitting – UK experience
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February 6, 2012 I RIS E NVIRONMENTAL 1438 Webster St, Suite 302, Oakland CA (510)

I RIS E NVIRONMENTAL Limit of Review Human Health Risk Assessment (HHRA) for Cement Plant Documents Pertaining to Discharges of Water From Quarry and Cement Facilities Additionally, at the direction of the Town of Los Altos Hills, one sediment and one surface water sample were collected in Permanente Creek

I RIS E NVIRONMENTAL Human Health Risk Assessment (HHRA) AB 2588 Air Toxics “Hot Spots” Program Review focused on –Estimated Emissions –Air Dispersion Modeling Assumptions and Inputs –Toxicity Assessment and Risk Evaluation Objective: evaluate adequacy of the methods used in HHRA to estimate emissions and associated potential impacts to human health

I RIS E NVIRONMENTAL Human Health Risk Assessment (HHRA) HHRA concluded health risks were below agency- specified thresholds Review determined HHRA was adequately and sufficiently conducted Summary of significant comments: –Current scenario assumes production at levels below permitted maximum –Future scenario assumes implementation of emission reduction technologies

I RIS E NVIRONMENTAL Review of Historical Discharges Discharges of sediment-laden water in violation of Storm Water Permit Of concern is that the Facility is potentially increasing discharges of naturally occurring metals (e.g., selenium, mercury, chromium) present in soil to Permanente Creek Water Board is in the process of bringing the Facility into compliance under a different discharge permit Water Board also requiring additional characterization of discharges

I RIS E NVIRONMENTAL Permanente Creek Sampling One sediment, one surface water sample were collected (i.e., snapshot of conditions) Analyzed for metals Hexavalent chromium, mercury, and selenium not detected in the surface water sampling Detections of molybdenum in surface water and arsenic and vanadium in sediment soil exceeded conservative screening levels A detailed analysis to determine the source of these metals was not within the scope of this sampling effort, though they may be background related Based on this single data point, there does not appear to be excessively high levels of contaminants in the creek at the sampling location

I RIS E NVIRONMENTAL Next Steps It may be useful to evaluate ongoing compliance with emission and discharge standards It may also be useful to monitor Facility response to these requirements on an ongoing basis to ensure the adequate and timely compliance of the Facility with proposed actions