Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

Months of the year December January November October February
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Chubaka Producciones Presenta :.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
TCS3 Telescope Operators area with TCS1 (about 2006) and TCS3 in Feb 2009.
Conceptual Design Review Senior Design University of Idaho College of Engineering.
Monthly Composites of Sea Surface Temperature and Ocean Chlorophyll Concentrations These maps were created by Jennifer Bosch by averaging all the data.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Facility instruments User (P.I.) Instruments Clean Room.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
7 th TTG meeting – Trieste – 3-4 March, 2015 SeaDataNet tools, new developments IFREMER : M. Fichaut, A. Briand, M. Larour, T. Loubrieu, V. Tosello ALTRAN.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Fast Internet Connection Publications (A. Uomoto)
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
National Institute of Economic and Social Research WERS 2004 Second User Group Meeting WERS 2004 Information & Advice Service.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
Magellan technical updates, Pasadena April 2006 – September 2006.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Magellan F/5 secondary updates. Magellan F/5 secondary  Mirror polishing finished late 2007  Final figure “better than MMT”
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
SAC Report Povilas Palunas 2/23/ Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
His Story Board Monthly Theme-Focused Activities Choose Truth
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Personnel Marc Leroy, asst. telescope engineer Instrument specialist search.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Increased Thermal Background for the post-NCS NICMOS TIPS – June 19, 2003 Megan Sosey NICMOS.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
AIRS Land Surface Temperature and Emissivity Validation Bob Knuteson Hank Revercomb, Dave Tobin, Ken Vinson, Chia Lee University of Wisconsin-Madison Space.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
1 Ambient Monitoring Program PM 2.5 Data Lean 6 Sigma Air Director’s Meeting May 2015.
CAC Training Run-Flat tires & TPMS Basics Noah Yanowitz, Service Engineering, December 9, 2008.
BUS 173: Lecture 10 Forecasting for Businesses. Outline  What is a forecast?  Why do we need forecasting?  What are the common tools of forecasting?
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Magellan Status Report March 19, 2016 Carnegie Observatories
“Falcone - Borsellino Airport”
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
FourStar 4K x 4K JHK imager
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
On-Line Certificate System
February 2007 Note: Source:.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year

LDSS focus encoder Chronic LDSS focus setting errors Chronic LDSS focus setting errors Focus signal was noisy, causing focus seek errors Focus signal was noisy, causing focus seek errors Original LDSS focus encoder (voltage SLVC) Marshall, Estrada, Birk, Uomoto Navarrette, Merino, Quiroz, Alfaro, Cortes, Jones, Bravo, Cerda

LDSS focus encoder New current-loop LVDT encoder installed July 2008 New current-loop LVDT encoder installed July 2008 New LDSS focus encoder (current LVDT)

LDSS focus encoder Also installed a new A/D converter with Ethernet inside LDSS Also installed a new A/D converter with Ethernet inside LDSS Commercial A/D converter

LDSS temperature sensor LDSS focus is sensitive to temperature LDSS focus is sensitive to temperature Using the “dome air” temperature wasn’t quite good enough Using the “dome air” temperature wasn’t quite good enough LDSS focus and temperature sensors

LDSS temperature sensor Added AD592 sensor to LDSS camera Added AD592 sensor to LDSS camera Jorge Bravo maintains focus offset data Jorge Bravo maintains focus offset data LDSS AD592 temperature sensor

LDSS temperature sensor

F/5 secondary Mirror arrived LCO September 2009 Mirror arrived LCO September 2009 Felipe Sánchez works on the F/5 secondary

F/5 secondary Pneumatic mirror supports were manually operated for testing Pneumatic mirror supports were manually operated for testing Pablo Castro inspects the mirror supports

F/5 secondary Aluminized at the Dupont chamber Aluminized at the Dupont chamber Povilas Palunas inspects the mirror surface

F/5 secondary Installed on the Clay telescope Installed on the Clay telescope 1 inch too close to primary 1 inch too close to primary On the telescope

F/5 secondary New truss structure delivered to LCO New truss structure delivered to LCO Engineering with Minicam in April 2009 Engineering with Minicam in April 2009 On the telescope

F/5 baffles February 2009 Pasadena meeting with SAO engineers February 2009 Pasadena meeting with SAO engineers Decided to optimize baffles for Megacam as wider field instruments not scheduled Decided to optimize baffles for Megacam as wider field instruments not scheduled Mounting scheme discussions suggest a re-build of primary mirror shroud Mounting scheme discussions suggest a re-build of primary mirror shroud

F/5 baffles

Smaller Megacam primary baffles can be inserted from the backside of the primary Smaller Megacam primary baffles can be inserted from the backside of the primary New shroud extends through hole far past the primary mirror surface to support mid-height baffles New shroud extends through hole far past the primary mirror surface to support mid-height baffles

Cleanroom LCO Cleanroom excavation

Cleanroom

Cleanroom

Shipping news OCIW ships (exports) equipment to Chile from all over the world Air shipments 2X / month from Pasadena Chile has recently become a bit more formal on import papers; check with Earl Harris Instructions at Layoffs at Schenker have made shipping more difficult; please allow extra lead time

Bibliography

Bibliography 397 refereed publications as of December 31, refereed publications as of December 31, added since December 31, added since December 31, 2007 Papers missed in journals not available to OCIW or without searchable databases Papers missed in journals not available to OCIW or without searchable databases

Crabtree counts to 2007 By permission, Dennis Crabtree

Bibliography IMACS and MIKE swap places in 2008

Pasadena staffing Pasadena staffing news Pasadena staffing news –Alan Bagish returned part-time Jan 2009 –Accounting analyst Gillian Tong is permanent OCIW employee –Jorge Estrada received his bachelor’s degree