DØ Calorimeter Software Meeting April 26, 2001 1 Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Reunion de groupe 29 oct. 2002G. Bernardi, LPNHE- Paris Reunion D0 Paris Programme de travail pour Calib On-line Prochaines etapes des etudes sur le bruit.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003.
L1Cal Pulser Diagnostics GUI.. What it is for and why do we need it. See a beautiful Bob’s presentation. –To carry out diagnostics for Run2A trigger (especially.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
F Fermilab Database Experience in Run II Fermilab Run II Database Requirements Online databases are maintained at each experiment and are critical for.
Ursula Bassler/Gregorio Bernardi1convenors meeting, Sep 4th 2003 CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Some notes on ezTree and EMC data in MuDst Marco van Leeuwen, LBNL.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
Calorimeter Status Nirmalya Parua, Brook.
V.Sirotenko, July Status of Online Databases Currently there are 2 online Oracle Databases running on d0online cluster: 1.Production DB, d0onprd,
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
June, 2000NIU Workshop Online DAQ System: From Detector to Tape T. Yasuda Fermilab.
Ursula Bassler1online monitoring 7/2/2002 Calorimeter Data Quality  aim: enhance the information flow concerning the data quality between the detector-
News on GEM Readout with the SRS, DATE & AMORE
DØ Algorithms Meeting March 9, Leslie Groer Columbia UniversityCalorimeter Online Software Status 1  Examines  Crate Unpacking  Calibration 
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Nirmalya Parua March 17, 2003 The RunII Calorimeter Nirmalya Parua (For the Calorimeter Group) Shifter’s Tutorial March 17, 2003  Overview Of the D0 Calorimeter.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
4/15/2003T. Yasuda, Fermilab DAQ Monitor Tutorial T. Yasuda Fermilab.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Calibration Workshop 8 Sept Calorimeter Calibration: Calibration procedure and Database Definition Ursula Bassler, Mrinmoy Bhattacharjee, Leslie.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Calorimeter Task Force Workshop February 10, 2003 Leslie Groer, Columbia UniversityCalorimeter Software Status 1 Past Calorimeter Software Improvements.
PP December 7, 2004 The RunII Calorimeter Pierre Pétroff and Norm Buchanan (For the Calorimeter Group) (taken largely from N. Parua’s tutorial) Cal-Muo.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
CALGO: Software Tasks cal software:
Online Software Status
Online Software Status
Online SW, DB & Calibration
Remaining Online SW Tasks
Online Calibration Online calibration: validation: L3fCalCalibTool –
CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting + 1 steering group meeting + 2 subgroups: CALGO – meetings : weekly,
Calorimeter calibrations with Flight Software.
Presentation transcript:

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking  Calibration  Downloads, Control & Monitoring  Displays  Immediate Software Needs

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 2 Cal_elec Online Status  Cal_elec – written by Mrinmoy Bhattacharjee  electronics co’ords:   ADC counts ,  vs channel  Time histories for 10 channels  Can catch hardware addressing errors  Being very actively used online for debugging, commissioning and monitoring  Default version for shifters to be run once per day:  > setup d0online; start_daq cal_elec  Takes 200 events per crate  Check readout status for all calorimeter crates using pedestals and pulsers vs reference histograms

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 3 em-channel had-channel Delay = 50 Cal_elec Development  Paris modifications  Offline use via SAM as basis for refined analysis  newly implemented:  mapping of pulser channel vs readout channel  histograms under development  unpacking of T&C information  unpacking of PIB information  Bob Kehoe developing separate branch for L1 Cal trigger debugging and commissioning “delay ramp” “dac ramp”

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 4 Calorimeter Examines – Cal_examine  Cal_examine – Florencia Cannelli  Physical co’ords – also meant for ICD, CPS & FPS  Been run during workshops but not much else yet  Some success with xgooey/ROOT but needs to be made robust for t and used by shifters  For now using histoscope  Shifter version for online  > setup d0online; start_daq cal_examine  Needs trigger tower views eventually  Any thing else to be added?

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 5 Calorimeter Crate Unpacking  To be added to ADC unpacking:  Dual readout  Simultaneous read out of gain x1/x8  Double sampling to check L1/L2 analog SCA holding stability  Triple readout  Unpacking of 3 consecutive crossings for timing calibration  Detection of addressing errors based on mode of readout  Timing & Control - Crate (0x4C)  Contains all meta-data  L1 crossing, which L1/L2 analog-cell read out, PIB information etc.  M. Bhattacharjee working on these for L3CalCalib and Cal_elec unpacking – needs to be generalized for offline unpackers (Tibor Kurca - Paris)  L1CAL - Crate (0x10)  Structure similar to Run I but there are significant changes in particular for L3 readout – about ~1 month away for readout  Bob Kehoe looking into this as he works on L1Cal Analysis tools

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 6 Calorimeter Electronics Calibration  Online Calibration – Taka Yasuda  Pedestal calibration data sent to L3 scriptrunner node (L3CalCalib – Mrinmoy Bhattacharjee + Jonathon Hays) .xml files used to start calib runs but setup by hand for now – need COMICS download  Data sent to CalibManager which stores data in Oracle dB  Python tools extract data to text or pickle files – run by hand for now  Automatic validation and extraction tools needed for pedestals and zero suppression limits – Nirmalya Parua  Mrinmoy working on handling gain runs and ramps with pulser  L3 node handled two crates for pedestal runs at 7Hz, (250 kb/s) with < 10% CPU usage – will try to run all 12 in same node?  Scheme for running calibrations still needs to be worked out (frequency, #events, #DAC/delay settings, etc.)  Offline Calibration – Ursula Bassler  Data base tables designed – might want to retrofit online  Development of online/offline transfer and DB-Manager code

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 7 Calorimeter Downloads, Controls & Monitoring  Downloads/Controls  Bill Lee/Fritz Bartlett building COMICS download tree structure for calorimeter  Working on COMICS  COOR communication - ~ 1-2 weeks  Pedestal and limits files read from pickle file (created by validation tool) and downloaded to ADC  Pulser control GUI working fine:  implementing broadcast function to all pulsers  working on COOR integration – use pickle files for d/load  General alarm monitoring of all systems needs to be turned on and tuned – send messages to Significant Event Server  Marc Hohlfeld produced new supply monitor and control GUI which is very useful.  Still want a global health of calorimeter GUI for shifters  GUIs being debugged online and made more robust

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 8 Calorimeter Event Display  Have 3-D display with cell information and Lego plot already  Would like ability to cut on cell or tower energies for the display  Nobu Oshima working on integrated 2-D display  Toby Burnett working on the Calorimeter display  Hope to have simple r-  and r-z E and E T views soon  Also might work on Cal Trigger Tower Lego plot  Orsay group has simple implementation of 2-D view

DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 9 Needed Software Unpacking of ADC cards for dual/triple sample Unpacking of T&C/PIB information ? Hot cell killer  Passing Online Calibration data to Offline  Calibration validation and extraction  Many studies to be done:  Proposal – build a cal_Analysis ntuple-maker package. Framework for other analysis tools – mostly offline  Electronics calibration  Gain calibration  Linearity of pulser ramps for gain calibration  Timing studies for optimizing readout and pulses  L1/L2 SCA cell  Noise – coherent and random  Cross-talk  Effect of bunch number in superbunch  Temperature dependance of preamps/BLS/pulser/LAr  HV dependence  L1 trigger vs precision  L1 trigger calibration