UHV Equipment Requirements Anton Janssen

Slides:



Advertisements
Similar presentations
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
AG.03: CIGRE SC A3 Green Book planning
Sistan & Balouchestan Electric Power Distribution Company
Waves and Transmission Lines Wang C. Ng. Traveling Waves.
Waves and Transmission Lines TechForce + Spring 2002 Externship Wang C. Ng.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Second IEC-CIGRE UHV Symposium, January 2009, New Delhi
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
T h e G a s L a w s. T H E G A S L A W S z B o y l e ‘ s L a w z D a l t o n ‘ s L a w z C h a r l e s ‘ L a w z T h e C o m b i n e d G a s L a w z B.
Chapter Fourteen: Transmission Lines
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Cigre B Doowon Technical College Korea 1 Q12. How does one assure that SAS specification developed in 2005 allows for future solutions taking advantage.
3AH5 Vacuum Circuit-Breaker For Standard Applications
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Insulation Coordination “the selection of insulation strength”
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
Design and implementation of a Tesla coil Christopher Rutherford
SMITH_USA_Author_ALPHA1_BLOCK1_Paper No 5-ECH_Smith_A1 Barcelona May VACUUM INTERRUPTERS FOR GENERATOR CIRCUIT BREAKERS, THEY'RE NOT JUST.
Example 1 A 9375 kVA, 13,800 kV, 60 Hz, two pole, Y-connected synchronous generator is delivering rated current at rated voltage and unity PF. Find the.
Calculating Separation Distance and Surge Current
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Development and testing of 1100 kV GIS
All rights reserved Surge Arrester.
Transistor Amplifiers
All rights reserved Gas-insulated Switchgear (GIS)
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
FEEE Ensuring Enhanced Education 1 D O : Point of lightning stroke S 0 : Rate of rise at O, kV/µs I 0 : Lightning stroke current, kA X :Distance in which.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
SUBSTATIONS SESSION Chairman: Ernst GOCKENBACH Reporter: Mark WALDRON.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
FEEE Ensuring Enhanced Education UnUn kV17,52436 BILkV UpUp kV57,279,9117,6 1 1.The simple protection method The maximum distance: Table 1. BIL.
Chapter 2 Transformers Edit by Chi-Shan Yu Electric Machinery.
User Interface related standardization in TC 100 Tadashi Ezaki IEC TC 100 Secretary.
Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi,
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Submitted to: Submitted by:
Department of Electrical Engineering
Presented by: Nguyen Phan Thanh Southern Taiwan University of Science and Technology.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
E E 2415 Lecture 12 Mutual Inductance and Ideal Transformers.
Energy SectorEnergy Automation: Shafiu © Siemens AG 2010 Page 1 HV and EHV allocation of harmonic rights.
5SL4 10 kA / 5SL6 6 kA miniature circuit breakers
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
KILOMETRIC FAULTS: NATURE, AFFECTING PARAMETERS, AND IMPACT ON THE BREAKER STRESSES _____________________________ Mohamed M. Saied Electrical Engineering.
Single Phase and three Phase Distribution Substation
Sub Station.
Subject :ELECTRICAL POWER SYSTEM - I( )
ELEC-E8409 HIGH VOLTAGE ENGINEERING
Evolution of HV Cable Systems
ELEC-E8409 HIGH VOLTAGE ENGINEERING
POWER SYSTEM PLANNING AND DESIGN. TITLE : DESIGN OF EHV TRANSMISSION LINES & BUNDELED CONDUCTORS IN EHV LINES. PREPARED BY : JOBIN ABRAHAM.
Transient Analysis of Shunt Reactor Switching on 500kV System
Global High Voltage Equipment Market Report 2023.
Standardization of power electronic systems and equipment
Electronic Based High Voltage Measuring Transformers
Protective Relaying Conference
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
EHV Transmission Equipments
LIGHTNING AND INSULATIONS COORDINATION
Exercise 8 Power systems.
Exercise Session 2 Power systems.
Prepared by: V.Bharanigha, AP/EEE
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Exercise 9 Power systems.
Presentation transcript:

UHV Equipment Requirements Anton Janssen Report 4.1 on behalf of WG A3.22 UHV Equipment Requirements Anton Janssen

CIGRÉ WG A3.22 Scope: Review state-of-the art of project specific and national technical specifications for all substation equipment within scope of SC A3, at voltages exceeding 800 kV. Recommend future specifications and standardizations for 1100 and 1200 kV equipment and provide, to IEC TC 17, technical background information. General information in Report 3.1, and the presentation of Report 3.1, by the convenor Hiroki Ito. UHV circuit-breaker information in Report 4.1.

TRV envelope MOSA Uc/t2 RV= kpp*Ur 2/3 U1=0.75*RV U1/t1 Uc=kaf*U1/0.75 t1=U1/RRRV t2=?*t1 U1/t1 ITRV RRRV td

Kpp Kpp depends on X0/X1 ratio X0/X1 for transformers << 1.0 X0/X1 OH-lines >> 1.0 UHV: long OH-lines, heavy transformers -> In UHV substations X0/X1 less than at EHV -> Kpp = 1.2 instead of 1.3

RRRV UHV OH-lines:. large diameter conductor bundles RRRV UHV OH-lines: * large diameter conductor bundles * heavy sub-conductors * no bundle contraction before interruption for first and last clearing pole Z < 330 Ω At 50 kA, 50 Hz rating (n is number of OH-lines): for T100 with n>3 RRRV< 2 kV/µs for T60 with n>1 RRRV< 3 kV/µs

Kaf, t2, t3 At UHV less damping expected, but limited experience, therefore proposed: for T100 Kaf from 1.4 to 1.5 T60 1.5 T30 1.54 T10 1.76 (covering LLF) t2 calculated by simplified model and compared with TEPCO-network, proposed: for T100 t2 from 4*t1 to 3*t1 T60 t2 from 6*t1 to 3*t1 (covering LLF~IEEE) for T30, T10 t3 = Uc/RRRV

ITRV. Applicable to AIS and MTS (HGIS) substations ITRV * Applicable to AIS and MTS (HGIS) substations * Surge impedance of busbars and bays for instance 263 Ω to 325 Ω (Powergrid 1200 kV) * First reflections: ti = 1.5 μs (Powergrid 1200 kV) * For 260 Ω ITRV covered by SLF without tdL * What about 325 Ω? * What about ITRV traveling waves at both sides?

ITRV (PowerGrid 1200 kV)   80 m 240 m 160 m 60 m 120 m > 40 m

SLF, LLF. Z = 330 Ω. tdL = 0. 5 µs. LLF covered by T60, T30, T10 with: SLF, LLF * Z = 330 Ω * tdL = 0.5 µs * LLF covered by T60, T30, T10 with: T60 t2 = 3*t1 T60 kpp = 1.2, kaf = 1.5 T30 kpp = 1.2, kaf = 1.54 T10 kpp = 1.2, kaf = 1.76

TLF. new specification ~ IEEE draft C37. 06 TLF * new specification ~ IEEE draft C37.06 * TLF-current from R10 series (close to T30/T10) * t3 = k x Ur with k = 6, based on information of I 0.21 surge cap. of some UHV transformers * kpp = 1.3, kaf = 0.9*1.7 * 1.3*0.9*1.7 < 1.2*1.76 (T10)

Out-of-Phase. at UHV large out-of-phase angles possible: 180° Out-of-Phase * at UHV large out-of-phase angles possible: 180° * with low kpp, at 180°, first pole RV ~ 2.0 pu * Iop and RRRV are proportional to RV * Uc is proportional to RRRV and line length * at 105º: RV, Iop, RRRV and Uc will be 20% lower * not enough information about probability, Iop and kaf in service

Impact of MOSA on Uc

Impact of MOSA on Uc. there is a clear impact of UHV MOSA on Uc Impact of MOSA on Uc * there is a clear impact of UHV MOSA on Uc * variation in MOSA characteristics and application require to apply some margin above SIPL * another margin is required to be specified between Uc and SIPL plus margin * due to both margins effect of MOSA on specified Uc for T100, T60 is nihil or small * due to load side part of TRV at LLF and TLF effect of MOSA on Uc for T30, T10 is nihil or small

Impact of opening resistors Impact of opening resistors * opening resistors advantageous to further reduce switching surges * Opening resistors positive effect on Uc and RRRV for both main and auxiliary contacts * Caution for capacitive current and OP switching, in some cases * Application and specification very user specific

Thank you for your attention Thank you for your input!! WG A3.22: Thank you for your attention Thank you for your input!!