11/20/20032003 November NSF Panel Review of JicamarcaChallenges: 1 By Jorge Chau and Ronald Woodman (IGP) Donald T. Farley and Wesley E. Swartz (ECE-CU)

Slides:



Advertisements
Similar presentations
1 NC Office of State Budget and Management State Budget Conference October 15, 2008 Mercidee Benton OSBM Expansion Budget Expansion Budget.
Advertisements

ASENT_IMPORT.PPT Importing Data From Templates Last revised 11/03/2009.
Chatham County Schools 2013/2014 Budget Presentation.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
How can IT help you today?. Agenda The Challenge Metric Construction Your Action Items How can IT help you today? 2.
LAFA Food Distribution July 26, Introduction:
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Winnipeg Interdisciplinary Student-Run Health Clinic (WISH Clinic) Vision for a student-run interdisciplinary health clinic.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Capital Improvement Programming Local Government Academy June 5, 2008 Marcia Taylor Mt. Lebanon.
ICT Electricity Use - Mapping it - Reducing it Chris Cartledge Independent consultant
Yinhai Wang University of Washington and Harbin Institute of Technology For OpenITS Symposium Oct.
ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.
Industry Session – Mixed Criticality and Multi-Core David Corman Program Director, Cyber Physical Systems National Science Foundation 1.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Cogeneration / Distributed Generation Proposal Oakland University.
1 Faculty Council IT Committee C-13 February 4, /4/2010.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
NAIC Visiting Committee Meeting February 15-16, 2005 SAS Radar Science Highlights Outline: – And finally describe the aeronomy and radar school from last.
Sponsored by the National Science Foundation Design of an Information Substrate for Measurement, Monitoring and Inference Spiral 2 Year-end Project Review.
Module 3: Configuring Hardware on a Computer Running Windows XP Professional.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
CoCom F2F meeting Chicago April 9-10, Expectations for April – 15 month Plan and Budget – Final budget to submit to BoD – Plan for.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
LAFA Food Distribution
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Allocation Formula Considerations Supply Demand Cost.
AITLAB 1 Ewusi-Mensah, Seal, Abraham Developing a Collaborative Learning Facility to Support Advanced Information Systems Courses: The LMU Experience Kweku.
Alistair Steele Network Connected Batteries SSEPD Energy storage projects kW Flow Battery 1 MW NaS Battery 2 MW Lithium Battery.
EPSRC Chemistry Grand Challenges ENGINEERING AND PHYSICAL SCIENCES RESEARCH COUNCIL Alex Berry, Physical Sciences Portfolio Manager
ELECTRONIC IDEAS UPS INNOVATIVE ALTERNATE POWER TECHNOLOGY DAWN – ELECTRONIC IDEAS INNOVATIVE ALTERNATE POWER TECHNOLOGY ELECTRONIC IDEAS.
1 ACT 61 INCREASED INVESTMENT AND SAVINGS SCENARIOS Summary Of Methods Used To Develop Inputs For Analysis of Cost-Effectiveness and Rate Impact John Plunkett.
Robbing Peter to Pay Paul 2014 – 2015 Tough Choices: 2 Options.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Search details: Enter country, dates and times of pick up and drop off.
Swartz, 03/11/7 New 256 th s 64 th s Extra 64 th Antennas for Aperture Synthesis Imaging – Lots of Baselines.
Jefferson Lab Overview Bob McKeown April 20, 2015.
2 Student benefits:   Technology access   Improved Instruction through the use of technology   Efficiency gained through use of technology   More.
TCT Budget Recommendations Jon Storslee, Chair of TCT.
Upper Atmospheric Facilities. Components of the UAF Program Five incoherent scatter radar facilities Partial funding for SuperDARN Half of CEDAR Program*
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Funding Proposal Basics April Nigh Rotaract Meeting, November 9, 2009.
Peter Davies Licensing Adviser OFTEL. Electronic communications code Replaces the telecommunications code Extends to all electronic communications providers.
2013 NETCARE Workshop 1.A big thanks to: Bob Christensen and University of Toronto External Steering Committee All our collaborators NSERC 2.Workshop Goals:
SuomiNet Overview CSU Atmospheric Science September 25, 2013 Natalie Tourville CIRA.
Introduction to Avionics Mac Mollison. What I Want to Talk About l What do we mean by “avionics”? l What is the focus of this course?
Jicamarca Antenna Arrays: Systems and Science Ronald F. Woodman Instituto Geofisico del Peru.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
ILS & Technology Services Potential Budget Impacts.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
City of Duvall 2016 PROPOSED BUDGET INFORMATION TECHNOLOGY NOVEMBER 3, PROPOSED BUDGET INFORMATION TECHNOLOGY NOVEMBER 3, 2015.
POWER FACTOR CORRECTION
Capital Improvements Plan
Flood Information and Notification System (FINS)
Accelerator Research and Innovation for European Science and Society
RISR-C incoherent scatter radar operations
FY09 Tactical Plan Status Report for Site Networking
Printers.
Why AMR Which network assets are overloaded or underutilized? What is the correlation between overloading and equipment breakdown? Which areas have the.
CEPC RF Power Sources System
Round ONE: 1. Round ONE: 1 Round One: 1 Teams: 2-5 members Time: 2 minutes Build Item: A TOOL 1.
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
MTA 2019 Final Proposed Budget November Financial Plan
Piping and Instrumentation for Process Industries
Transmission System Update
Grand Challenges in e-Science
Fleet Electrification
Presentation transcript:

11/20/ November NSF Panel Review of JicamarcaChallenges: 1 By Jorge Chau and Ronald Woodman (IGP) Donald T. Farley and Wesley E. Swartz (ECE-CU) David Hysell (EAS-CU) The Jicamarca Radio Observatory Near Lima, Peru Jicamarca in Review Swartz 03/11/7

11/20/ November NSF Panel Review of JicamarcaChallenges: 2 Jicamarca in Review, The Next Five Years (DLH) An Introduction to Jicamarca (DTF) Management Overview and Changes - people (DTF) Science Highlights - ideas (DLH) Infrastructure Development - tools (JLC) Other Instruments/projects (JLC) Outreach, Education, Societal Impact (WES) Response to the Last Panel’s Report (WES/DTF) Maintenance Challenges (JLC? Or WES?) Budget Challenges (WES)

11/20/ November NSF Panel Review of JicamarcaChallenges: 3 Maintenance Challenges Lots of electronics Lots of antenna connections (corrosion) Aging vehicles But, there are really no single-point failure modes (baring some cataclysmic event) that would cause an extended down time: Multiple systems with multiple transmitters, receivers, computers, but final transmitter tubes now run about $80,000

11/20/ November NSF Panel Review of JicamarcaChallenges: 4 Budget Challenges Additional operational costs for new instruments JULIA – cost was not previously included in the main budget SOUSY – fuel expected to be $8K/yr for 500 hours of operation Bistatic – Equipment funded separately; routine operational costs Operating with 4 big transmitters – increases peak demand billing Replacement of aging vehicles Need a new one approximately every 2 years Replacement of any failure of transmitter tubes $15K for drivers (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr) $80K for finals (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr) $40K for SOUSY finals

11/20/ November NSF Panel Review of JicamarcaChallenges: 5 Broad Category Budget Breakdown The fine print: Proposed for : $1.5M (with wish list items)

11/20/ November NSF Panel Review of JicamarcaChallenges: 6 Budget Wish List Electronic steering of main array (top priority) 128 – phase switches plus control ($120…split over 3 years) Restoration of electronic steering of SOUSY radar 4-phase selection option $30K 8-phase selection option (original) $45K Spare transmitter tubes 1.5-MW Main Transmitter Final: $80K 100-KW Main Transmitter Driver (4CX4000G): $15K 300-KW SOUSY Final: $40K Misc. Lab equipment Computers and networking equipment to stay current

11/20/ November NSF Panel Review of JicamarcaChallenges: 7 Wish List in Perspective Highest priority on bottom

11/20/ November NSF Panel Review of JicamarcaChallenges: 8 Bare-Bones Wish List But Retaining Electronic Steering of Main Beam Highest priority on bottom Subject to no transmitter failures in first three years.

11/20/ November NSF Panel Review of JicamarcaChallenges: 9 Bare-Bones Wish List Modified by a Transmitter Failure Highest priority on bottom

11/20/ November NSF Panel Review of JicamarcaChallenges: 10 Proposed Yearly Budget Distribution

11/20/ November NSF Panel Review of JicamarcaChallenges: 11 Budget in Perspective Partial Year

11/20/ November NSF Panel Review of JicamarcaChallenges: 12 Last

11/20/ November NSF Panel Review of JicamarcaChallenges: 13 Broad Category Budget Breakdown The fine print: Proposed for : $1.5M (with wish list items)