North America ISS Roadmap – 3 Month NDA Distributable November 2003.

Slides:



Advertisements
Similar presentations
Premio Desktop and Intel Processor Roadmap for Q3/2003 Premio Desktop and Intel Processor Roadmap for Q4/2003 to Q3/2004 By Calvin Chen Technical Director.
Advertisements

Company Equipment Upgrade Proposal. The Current Situation  It has been five years since Alt-F4 Inc. has upgraded any of it’s equipment.  200 Computers.
The physical parts of Computer
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Lesson 15 – INSTALL AND SET UP NETWARE 5.1. Understanding NetWare 5.1 Preparing for installation Installing NetWare 5.1 Configuring NetWare 5.1 client.
Lesson 4-Installing Network Operating Systems. Overview Installing and configuring Novell NetWare 6.0. Installing and configuring Windows 2000 Server.
Power Over Ethernet. What is PoE? Ü Power over Ethernet allows ethernet networked user devices to be powered over the same 4-pair UTP that provides the.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Dawn Demo Programs Working.
SMART Meeting Pro Personal Edition 1.0 Introducing.
MA8000/EMA12000 Fibre Channel Product Set
Enterprise Storage EVA Update Thomas Langkjaer Enterprise Storage and Software Manager EMEA.
Power Cord: IEC320-C13 to NEMA xxx Power Cords Amp -001 USA/Japan -011 Aus/N.Zealand -021 C.Europe -031 UK/Ireland -511 Switzerland -481.
MA8000/EMA12000 Fibre Channel Product Set Storage controllers, cache, batteries: B21 HSG80 RAID Array Controller w/ 256MB Cache B21 HSx80.
Spending Plans and Schedule Jae Yu July 26, 2002.
© Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted Data Availability.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Oct. 6, 1999PHENIX Comp. Mtg.1 CC-J: Progress, Prospects and PBS Shin’ya Sawada (KEK) For CCJ-WG.
Dell PowerEdge Blade Server PDVSA Jun-05
1062m0656 between 10692m2192 DS/ICI/CIF EqualLogic PS6510E
Retail File 26 July 2016 Valid Until 29 July 2016 or Until Stock Last P/N HP SERVER TOWER ML310ev2 GEN8, 4U, INTEL XEON E3-1220v3, 4GB UDIMM.
Managing HP Enterprise Virtual Array
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Basic View Main Menus Sub Menus 9-Aug-01 8-Aug-01 7-Aug-01 6-Aug-01
myTimetable Presentation
Jan 2016 Solar Lunar Data.
2300 and 2301 Redesign Project: D to E
Retail File Valid Until or until stock last
IT Strategy Roadmap Template
Timeline Roadmap Template
Introduction to Networks
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Nematron® EnduraTouch II 17” Enclosed Computer Launch
Average Monthly Temperature and Rainfall
Nematron® EnduraTouch II 17” Enclosed Computer Launch
IT STRATEGY ROADMAP TEMPLATE
2017 Jan Sun Mon Tue Wed Thu Fri Sat
How To Use 1 Delete the lines and text you don’t need 2
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.

Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
IT STRATEGY ROADMAP TEMPLATE
Electricity Cost and Use – FY 2016 and FY 2017
Gas Customer Forum DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
How to use 1 Delete the lines and text you don’t need 2
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
HP SERVERS & OPTIONS PRODUCTS THAT DELIVER
How To Use 1 Delete the lines and text you don’t need 2
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
HP SERVERS & OPTIONS PRODUCTS THAT DELIVER
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

North America ISS Roadmap – 3 Month NDA Distributable November 2003

page 2 table of contents definitions RAS:Roadmap Administrative System. RAS is the planning date from which material is typically positioned. End Of Life (EOL): Notice to discontinue, typically in 3 months. Does not mean end of manufacturing. Customer should actively start transition to follow-on product. Last Build:No more manufactured and no additional orders accepted. Discontinued:No more manufactured and no additional orders accepted. :Orderable prior to anticipated availability. these roadmaps must be read with the following understanding Lines BEGIN at the approximate date of product introduction. This is a “best case” situation which can easily be pushed to a later date. This does not necessarily mean inventory is available in our distribution channels. Do NOT promise delivery on these dates based on these roadmaps alone.

page 3 key lifecycle changes - servers lifecycle information has changed for the following products: discontinue date changes none introduction date changes ML MHz 1M RAS intro date changed to 10/13/03 DL MHz 1M RAS intro date changed to 10/01/03 DL MHz 1M RAS intro date changed to 10/01/03 BL20p 3200MHz 1M RAS intro date changed to 12/01/03

page 4 estimated product lifecycle

page 5 estimated product lifecycle

page 6 estimated product lifecycle

page 7 estimated product lifecycle

page 8 estimated product lifecycle

page 9 estimated product lifecycle

page 10 estimated product lifecycle

NA ISS Options Nov 2003

page 12 key lifecycle changes - options 72G 10K NHP ( B21) disk drive has been reactivated – Launch scheduled for Jan ‘04 40g ATA ( B21) Disk Drive discontinue date extended until Dec ‘06 SA5312/128 ( B21) has now discontinued SA5302/128 ( B21) discontinue date pushed out to Mar ‘04 Hard Drives Controller/Enclosure

page 13 key lifecycle changes - options 512 Reg PC 2100 DL140 ( B21) has been added to RAS introducing in Dec ’03 1Gb Reg PC 2100 DL140 ( B21) has been added to RAS introducing in Dec ‘03 Next Generation KVM Switch is now available – Rack-mounted analog KVM Switch – Non-IP Capable – Compatible with current pre-merger Compaq KVM Switch products – Utilize existing KVM products: KVM UTP CAT5e cables (3, 6, 12, 20 and 40 feet). KVM Cnsl Expansion Mod. KVM PS/2 Cnsl Intf Adptr (8 pack or single pack). – Will become a universal KVM product for all HP server platforms. TFT7210R Flat Panel Monitor will be available in Jan ’04 – Replacement for the 15” – Occupies the same amount of space as 15” – Comparable in price to the 15” memory racks and rack options

page 14 key lifecycle changes - options The following products have discontinued – 9136 Extension Kit ( B21) – 9136 Short Rear Door ( B21) – Kit, OPT, BLNK PNL XU ( XXX) – Side Panel 36U ( B21) – Stabilizer MM ( B21) T/R Conv ML350 G3 ( B21) discontinue date is being pulled in to Oct ’03 Due to a change in the SKU strategy for switch boxes, the following product’s life cycle have been adjusted: – 1x2P KVM SW HI Res ( XXX), the discontinuation date has been pulled in to Feb ‘04 – 1X4P KVM SW 1U/HI Res ( XXX), the discontinuation date has been extended to Apr ‘04 – KVM Cable 12ft, 3ft. & 7ft ( B21, B24 & B25), the discontinuation date has been extended Apr ‘04 Rack Adapter 24” Round to 19”Sq ( B21) - will be available in Oct ‘03 – Allows the customer to convert a 24" threaded hole rack to a 19" rack width rack with square holes (7000, 9000 or Series Rack). racks and rack options (cont.)

page 15 key lifecycle changes - options HP RPS DL360 G4 ( B21) is scheduled to launch in Sept ’04 – 300 Watt RPS NC /100/1000T ( B21) discontinue date pushed to Jul ‘04 NC /100/1000T Gigabit NIC ( B21) will launch in Nov ‘03 The discontinue date on the following NICs have been extended to Dec ‘03: NC / SX ( B21) NC /100/1000T ( B21) NC3123 PCI 10/100 WOL ( B21) discontinue date pushed to Feb ’04 power nics

page 16 key lifecycle changes - options The discontinue date for the following RiLOE Products has been extended from Mar ‘04 to Mar ‘05: – RIB High Volt Power Cord – RIB High Volt Power Cord MUL – B21 RIB High Volt Power Cord – B22 RIB High Volt Power Cord MUL – B21 SOAR SCSI CA OPT Kit – RIB/Lights Out II – RIB/Lights Out II – RIB/Lights Out II – B21 VPB CBLS RIB-Netserver The following have been added to RAS and are now available – B24 ProLiant HA F200 Cluster for MSA1000 v.2 – B24 ProLiant HA F100 Cluster for MSA1000 v.2 – B24 PDC O5000 EVA 9i W2K – B24 F500 Cluster for EVA Enhanced – B24 PDC O2000 MSA1000 v2 9i – B25 F500 Cluster Enhanced DT Kit – B27 F500 Cluster Enhanced Kit – B22 PDC Cluster for LINUX RAC – B22 F500 Cluster for EVA DT – B23 PL Cluster SVC Guard 1 License – B23 PL Cluster SVC Guard 2 License – B24 F200 Cluster for RA4100 – B23 F500 Cluster for EVA Basic – B24 F100 Cluster for RA4100 VIRT REP v4.0 MSA1000 ( B21) has been added to RAS with availability of Dec ‘03 SVCGUARD EXTENSION SAP LINUX ( B21) has been cancelled server specific options high availability

page 17 key lifecycle changes - options software options The following products are now available: * B21 W2003 SBS SRV 5CAL * B21 W2003 SBS NPI * B21 W2003 SBS TC * B21 REDHAT EL 2.1 ES YR * B21 REDHAT EL 2.1 ES YR * B21 W12003 SBS PRM NPI ENG * B21 W2003 SBS STD 5-CAL USER Pak CARD NEW DRDWR UPDATE INFO CEI CARD W2003 SBS PRM P1-EN CEI The availability date for the following products has been pushed to Jan ’04: * B21 RH Linux AS Yr * B21 RH Linux AS Yr * B21 RH Linux ES Yr * B21 RH Linux ES Yr * B21 W2003 SBS STD 5-CAL DEVICE Pak *These kits must be sold with servers. They are not to be sold as stand-alone software.

page 18 key lifecycle changes - options software options The discontinue date for the following products has been extended to Aug ‘ & -003 NW Bit SVR SS WIN2000J SVR SS62 JPN WIN2000J SVR SP3 TC JPN2 NetWare Xuser ENG DIB ( B21, B22, B23, B24, B25, B26, B27) discontinue date has been extended to Jun ‘05

page 19 key lifecycle changes - options blade options The following kits are now available BLp C-GpE2 Switch Kit ( B21) BLp F-GpE2 Switch Kit ( B21) BLp GpE2 SAN Connect Kit ( B21) The following kits’ discontinue dates have been extended to Dec ’05: BL Enclosure Telco Rack Kit ( B21) BL Busbar Telco Rack Kit ( B21) BL Enclosure Telco Rack Kit ( B21)

page 20 estimated hard drive lifecycle

page 21 estimated controller lifecycle

page 22 estimated controller lifecycle

page 23 estimated memory lifecycle

page 24 estimated memory lifecycle

page 25 estimated memory lifecycle

page 26 estimated rack lifecycle

page 27 estimated rack lifecycle

page 28 estimated power lifecycle

page 29 estimated nic lifecycle

page 30 estimated proliant essentials lifecycle