{ Leading In Warren Ed Haller, Director Water Pollution Control November 5, 2015.

Slides:



Advertisements
Similar presentations
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Advertisements

DEP TRANSFORMATION Air Permit Review & Process. 2 ITEMS DISCUSSED Permit Format Streamlining of Compliance Plans Level of Monitoring Level of monitoring.
Technology Services Strategic Plan for Operational Efficiency
Wastewater Permit Renewals
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Welcome If you haven’t, please sign in Coffee and water are located in the back Meeting Protocol is in your packet, please review. Please take a moment.
ADSoyerDO AAOS Practice Management Committee AAOS San Francisco February 10, 2012.
What is NPDES? “National Pollutant Discharge Elimination System”
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems Presentation to [Governing Body] [Date] BACWA.
Public Works Jack Petkus, Director Informational Overview.
RENEWAL & SUCCESSION CONSIDERATIONS Elisa A. Falco, Director of Education & Training.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
How can IT help you today?. Agenda The Challenge Metric Construction Your Action Items How can IT help you today? 2.
What Do I Do Now? Starting Your EMS July 27, 2007.
City of Modesto FY Proposed Budget City Clerk Proposed Budget Fiscal Year FY Proposed Budget.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
STRENGTHENING COMMUNITIES INITIATIVE NORTHLAND FOUNDATION DECEMBER 9, 2010 Succession Planning.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Revitalization of the Long Beach City Auditor’s Office Presented to the Downtown Lions Club of Long Beach September 8, 2006 Laura Doud, City Auditor, Long.
Online Postgraduate Admissions Project Kate Ward – Project Manager.
The Israel Telecommunication Corp. Limited IT Division 2003 November Production Readiness Reviews of IT Systems in Bezeq 1 Production Readiness Reviews.
ICT Projects v Business Improvement
Quality Customer Service on a Budget Mary Ann Venner Head of Access Services UNT Libraries.
Supervisor Training Workshop
Industrial Inspections Making Good Inspections Better David Long EPA Region 6.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
MANAGING ENGINEERING & TECHNOLOGY By Doug Wesselschmidt, PE.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
Storm Water Pollution Prevention Training
American Recovery and Reinvestment Act (ARRA) of 2009 Bonnie Elsey, Director, DEED Workforce Development Division March 24, 2009.
October 29, 2013 Calgary flood 2013 – Resilience of City’s workforce supports Continuation of operations Ron Schafer, Transportation Planning Sandy Virgo,
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
Measuring the Impact of Coaching ….now we have gone to all this effort ….has it made any difference? Rick Woodward Director, Learning & Development.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
From Policies to Programs to Practices Establishing the Green Infrastructure Eric Friedman Director of State Sustainability Mass. Executive Office of Env.
The Community Collaboration Coaches Roles, Strategies, and Tools.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
Design Review Program Overview. Design Review Program Created in 1994 to… o Encourage better design & site planning that enhances the character of the.
REPORTING RIGHT NOW WITH ARGOS JESSICA ASHBROOK – LANSING COMMUNITY COLLEGE BRIAN STEVENS – EVISIONS ACCOUNT EXECUTIVE.
Prioritizing Booster Pump Station Improvements Tom Peters, P.E. May 2, 2008.
Kerry Cleary An evaluation of the impact of Values Based Interviewing at the OUH Values Based Conversations and wider engagement strategies.
Building and Leading Teams.  Proof of your ability and success as a leader is when your team members say “we did it ourselves.”  Leadership is a team.
Case study municipality. 2 Contents Introduction The way Results Conclusion.
Tauranga Transport Operations Centre TTOC. Region Update - TTOC Other areas TTOC manage and operate: CCTV  Transport, Crime, Libraries, ICT, Dog pound,
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
January 26, 2010 WAPRO Electronic Records Management 101 WAPRO Electronic Records Management 101 Washington Association of Public Records Officers Kyle.
1 CAREER PATHWAYS Welcome to…. Module 8 Preparing for Appointment Process.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Redmond Police Functional Plan Update Council Study Session January 14, 2014.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Municipal Code Title 16 Update: Liquid and Industrial Waste Disposal Board of Water Commissioners November 10, 2014 Item 5.
WHAT WE ARE LEARNING THROUGH IMPLEMENTATION TODD A. SPANGLER, PE BRENTWOOD WATER SERVICES.
City of Nanaimo Core Services Review Council Steering Committee Workshop #2 March 7, 2016.
Applicant Tracking System. Current HR Job Postings.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Session Name/Lecture Name
Presentation to the Livingston City Council on the Phase II MS4 Permit
iCQ – A view of funding changes and trailblazers
Change is Hard! Incorporating Values to Keep Staff Motivated
NWT Asset Management Strategy & Implementation
Employee Performance Management System (EPMS)
2018 Signal Mountain State of The Town Report
Operationalization of a Public Works AM Strategy
Managing Housing for Sustainability and Viability
“Feeling positive that I can carry out appraisal effectively”
Presentation transcript:

{ Leading In Warren Ed Haller, Director Water Pollution Control November 5, 2015

 NEORSD vs City  Plant & Pump Station Conditions  Staff Communication, Training, Development  Communication Up & Out  EPA Relations  Refurbishment Project Approach  Last SSO Closure Plan  Improving Promotion Selection  Change Management  NPDES Permit Modification  Transparency, Resiliency, Mobility  Work Yourself Out of a Job Overview

NEORSD vs. City

 Many Challenges  Maintenance Issues/Inventory  Manual Operation  Plant Flow Monitoring  Screenings Everywhere  O/S Equipment – 50%  Pump Stations – 422 Plant & Pump Stations

 Manage by Walking Around  Delivered Class I Prep-Course (6)  Leader Meetings – Training/Discussion  Employee Meetings – Policies/Tardiness  Delegated 2 nd Class I Course Delivery (10)  Individual/Group Mentoring (2/3)  Cross Training (Plant/Biosolids/Lab/Sewer)  Look for unique, untapped strengths  Employees: The only appreciable asset Staff Communication, Training, and Development

 Mayor & Service Director: Reports, , Text  City Council Members: Take Initiative. Be Responsive.  Other Department Heads: Build Relations. Respond.  The Public: Be Sensitive & Responsive.  Neighborhood Association Groups. Communication Up & Out

 Strained History with Warren  Disinfection: Significant Non-Compliance  Reopened last SSO  Requested a Meeting (5 to 1)  Negotiating a Modified NPDES Permit  Help offered and appreciated EPA Relations

 Sought Staff Input  Sought External Input (9)  Documented the Needs  Refurbishment vs. Replacement  Three Phases  RFQ Process  The Winner The Refurbishment Project

 Flooding Downtown Buildings  Reopened Last SSO, Meter Installed  Downtown Study by AECOM  Options: Green, Rehab, Storage (2)  Surcharged Sanitary throughout Warren  Some Rehab planned  Need a Comprehensive Sewer Study  EPA Reply Pending Last SSO Closure Plan

 The old way  Interviews  Assessments  Decision Process  Post Interview Feedback Improving Promotions

Change Management

 18 Months before Renewal  SWPPP Required (6 months)  SSO Closure Plan Required  Mandated Disinfection Upgrade (3 months)  New Barium Limits  New Cyanide Test Required  Streamlining Compliance NPDES Permit Modification

 Ask lots of Questions, Learn  Apologize When Needed  Thank People Often  Respond Promptly and Thoroughly  Learn from Setbacks  Get out and LISTEN as much as possible Transparency, Resiliency, & Mobility

 Look down the road 1, 5, 10, 20 years  How long will YOU be there?  Explore employee potential & interest  WEFTEC-5  One Sign of A Great Leader: Smooth Transition AFTER Departure Work Yourself Out of a Job

Questions?