Western Planning Regions Discussion Needs/Expectations Relative to TEPPC TEPPC Review Task Force Meeting January 11, 2016 1/8/20161.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

California Independent System Operator 1 tmw/ California ISO Update on RTO Request for Designation as Regional Transmission Organization (RTO) WECC.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Interpreting Regional Criteria and Regional Standards Brian Silverstein Board of Directors April, 2010.
Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Public Service Company of New Mexico
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Western Planning Regions Interregional (IR) Coordination Activities
Keegan Moyer Manager, Transmission Expansion Planning TEPPC Update July 16, 2014 WECC - Salt Lake City, UT.
Edition Vitale and Giglierano Chapter 3 Organizational Buying and Buyer Behavior Prepared by John T. Drea, Western Illinois University.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Transmission Planning at the California ISO September 10, 2015.
ENVIRONMENTAL DATA IN TRANSMISSION PLANNING AUGUST 3, 2015 Carl Zichella DIRECTOR OF WESTERN TRANSMISSION.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Draft 2015 WECC Budget Standing Committee Meetings March 25-27, 2014.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Peter Larsen and J.P. Carvallo Lawrence Berkeley National Laboratory Data Working Group ■ August 4, 2015.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Technical Advisory Subcommittee Quarterly Meeting August 15-16, 2016
TEPPC Review Task Force Meeting February 4-5, 2016
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Reliability Assessment Committee Proposal TSS Meeting
Nick Hatton Associate Engineer March 9, 2017
Reliability Assessment Committee
Massachusetts Electric Restructuring Roundtable
MIC Committee Discussion
Reliability Assessment Committee Reliability Workshop Priorities
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Duke Energy Carolinas Quarterly Stakeholder Meeting
Comments on Regional State Committee Proposal
ADS and WPR Seed Case Background
Context: Scenario Studies
ADSTF Update: Resource Mapping and Proposed Solution
Context: Scenario Studies
Reliability Assessment Committee Reliability Workshop Priorities
Andrew Christensen, SRWG Chair
ADSTF Update: Resource Mapping and Proposed Solution
ADS and WPR Seed Case Background
ADS Update: Resource Reconciliation
WECC – NERC Standards Update
MIC Committee Discussion
Document Categorization Policy
MAC Input on Section 4.9 Review
Standing Committee Meetings March 25-27, 2014
Task Force on GNB 14 – 15 November
Presentation transcript:

Western Planning Regions Discussion Needs/Expectations Relative to TEPPC TEPPC Review Task Force Meeting January 11, /8/20161

Western Planning Regions (“WPR”): Legal Obligations Established and well defined Order 1000 regional processes Transparent and comparable With healthy regional stakeholder input Regional processes used to coordinate planning data and information with Planning Regions Interregional transmission solutions considered through interregional coordination Annual interregional stakeholder meetings and provisions for interregional transmission proposals 1/8/20162

Regional Objectives: WPR and TEPPC Drivers WPR: planning to meet Regional and Interregional FERC 890 and 1000 transmission planning requirements TEPPC: informs WECC management and WECC stakeholders Study area WPR: WECC region; planning regions TEPPC: WECC region 1/8/20163

Regional Objectives: WPR and TEPPC Basic study data needs determined WPR through regional processes TEPPC through WECC processes TEPPC scenario analysis WPR: planning regions not considered based on TEPPC scenario need TEPPC: WECC stakeholder input drives scenario definition 1/8/20164

Regional Objectives: WPR and TEPPC TEPPC scenario results WPR: may have a broader different view/objectives than WPR needs; generally not used TEPPC: information used by other stakeholders Models used WPR and TEPPC: Production Cost Model ("PCM") and Power Flow ("PF") Current situational relationship WPR: TEPPC (and WECC) data user; transmission provider/owner involvement in TEPPC (and WECC) activities TEPPC: WECC data user/provider WPR & TEPPC: a stakeholder in each other’s process 1/8/20165

WPR Short-Term Needs: Oriented Around Data 2026 Common Case completed by March 31, 2016 The assumptions in the common case are acceptable to WPR or require minimum effort to modify for WPR studies Round trip process (PF-PCM-PF) functional and complete by March 31, 2016 Power flow dynamic data complete by WECC and functional no later than June 30, 2016 In the long-term a data management system for common PCM and PF data 1/8/20166

WPR Long-Term Needs: Oriented Around Data and Shared Value TEPPC (and WECC) PCM data set (and PF base case) development process and procedures WPR will coordinate their base case needs WECC provide some level of deference to these needs TEPPC studies/results must be relevant to WPR before they can be considered in WPR regional processes TEPPC studies/results must be based on PCM data sets that reflect WPR ten-year plans For TEPPC studies/results to be considered TEPPC must submit their information into the relevant regional planning processes 1/8/20167

WPR Long-Term Needs: Oriented Around Data and Shared Value Improve data coordination so WPR can continue to rely on PCM data TEPPC PCM data reflect planning region’s ten-year transmission plans TEPPC develops using current method/processes and produces change files WPR provide appropriate assumptions Non-WPR related projects/sensitivities/scenarios should be reflected by TEPPC in separate PCM data sets Development justified on the merits of the proposal Restructure RPCG under WPR to manage With WECC support Migrating WECC to a data management system (e.g., a BCCS like process) for PCM data set and PF base case development 1/8/20168

Questions? 1/8/20169