Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.

Slides:



Advertisements
Similar presentations
Introduction to Hydraulic Engineering – CEE3420
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
The Benefits of Modeling with Bentley’s Haestad Methods Solutions.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Water Management Options for Surface Drainage RED RIVER BASIN TECHNICAL AND SCIENTIFIC ADVISORY COMMITTEE (BTSAC) BRIEFING PAPER #3 September, 2014 BTSAC.
Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
City Manager Priorities Fire Stations City Council April 25, 2011.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Chehalis River Basin Flood District Formation February 17, 2010.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
City of Appleton Stormwater Management Update Presented to the January 22, 2013 Utilities Committee.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.
1 Using WinSLAMM For Stormwater Retrofit in Urban Environments August 22, 2011 StormCon 2011, Anaheim, CA Presented by: James Bachhuber PH Caroline Burger.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
1437 SOUTH BOULDER AVE., SUITE 1080  TULSA, OKLAHOMA  (P) (F)  Garnett Regional Detention Facility:
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
PA-1 Surface Water Control Structure Replacement Final Payment.
Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Ruben Gonzalez-Baird, EIT Engineering Associate, Bureau of Environmental Services (BES) Portland, OR Ruben Gonzalez-Baird, EIT Engineering Associate, Bureau.
City of Appleton Stormwater Management Update Presented to the June 11, 2013 Utilities Committee.
April 26, 2016 PRESENTER: Doug Green, Vice President.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
(Your high resolution photo will go here.) Arthur Hirsch Principal Owner-TerraLogic–Boulder Colorado Colorado-ASCE Member ENVISION- Management Utilization.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.
English Bayou Basin Storm Water Master Plan Presentation to Calcasieu Parish Police Jury Lake Charles April 29, 2010.
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
12-31 EMC Approval of Broad River Basin Hydrologic Model November 8, 2012 Division of Water Resources NC Department of Environment and Natural Resources.
Heritage Park Area Construction Update July 28, 2015
2nd Street Drainage and Paving Improvements
City of Appleton Stormwater Management Update Presented to the
CE 3372 Water Systems Design
WEST & EAST DISTRICT PROJECTS PRESENTATION
City Council Meeting December 20, 2016
Town of Melbourne Beach
Babcock Basin-Design Phase
Land Use and Zoning Committee Special Workshop
Tulsa's Risk MAP Program Goals
Water Resources Engineering Hydrological Analysis and Simulation Model HEC-HMS Prof. Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering.
Site Design •Project Site context Module 3: •Site Analysis
Applied Hydrology Hydrological Analysis and Simulation Model HEC-HMS
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Application for Zoning Amendment
2.3.2b Watersheds and River Systems
Welcome to the Stormwater & Sustainability Branch
MS4 OVERVIEW 2015.
Update to Loxahatchee River Coordinating Council
Public Works Standard Drawings Subcommittee Meeting
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville Common Council Presented by: Caroline Burger, P.E. Theran Jacobson, E.I.T. AECOM Madison, WI

Outline  Existing Conditions  Fire Station Impacts  Alternatives  Cost Estimates  Conclusions  Recommendations

Existing Conditions

Fire Station Location #1 and #2 were modeled separately Fire Station Location #1 and #2 were modeled separately Purpose was to determine the individual impact from each Purpose was to determine the individual impact from each Modeling indicates neither location will “adversely impact” the Water Street Basin Modeling indicates neither location will “adversely impact” the Water Street Basin “Adversely impact” means increasing water surface elevations Fire Station Impacts Location #1 Location #2

1.Regrade Open Channel 2.Replace Open Channel with Box Culvert 3.Construct Stormwater Pond 4.Combination of Alternatives

Regrade open channel Regrade open channel Reconstruct junction Reconstruct junction Results in no adverse impacts Results in no adverse impacts Location #1 Alternatives - Scenario 1

Replace open channel with box culvert Replace open channel with box culvert Reconstruct junction Reconstruct junction Results in no adverse impacts Results in no adverse impacts Location #1 Alternatives - Scenario 2

Alternatives – Scenario 3 Location #2 Replace open channel with box culvert Replace open channel with box culvert Results in adverse impacts Results in adverse impacts

Alternatives – Scenario 4 Location #1 Location #2 Construct stormwater pond by high school Construct stormwater pond by high school Results in no adverse impacts Results in no adverse impacts

Alternatives – Scenarios 5-7 Location #1 Location #2 Scenario 5: Combination of Open Channel at Location 1 and pond Scenario 6: Combination of Box Culvert at Location 1 and pond Scenario 7: Combination of Box Culvert at Location 2 and pond All result in no adverse impacts

Cost Estimates Location #1 Location #2

A Fire Station at either location will not adversely impact the basin A Fire Station at either location will not adversely impact the basin Improvements to Location 1 will not adversely impact the basin Improvements to Location 1 will not adversely impact the basin Improvements to Location 2 will adversely impact the basin Improvements to Location 2 will adversely impact the basin If Location 2 is chosen, the stormwater pond must also be constructed If Location 2 is chosen, the stormwater pond must also be constructed The stormwater pond will reduce water surface elevations in the basin The stormwater pond will reduce water surface elevations in the basin Conclusions Location #1 Location #2

Proceed with the selection of the Fire Station location Proceed with the selection of the Fire Station location The junction box downstream of location 1 and the sanitary main adjacent to location 1 should be addressed The junction box downstream of location 1 and the sanitary main adjacent to location 1 should be addressed Conveyance improvements will likely require permitting – meet with WDNR staff early during design Conveyance improvements will likely require permitting – meet with WDNR staff early during design Recommendations Location #1 Location #2

Questions?