1 6. T IME -C OST O PTIMIZATION Objective: The optimization of project duration and cost by an appropriate crashing of activities. Summary: 6.1 Finding.

Slides:



Advertisements
Similar presentations
© Tarek Hegazy – 1 Efficient Scheduling of Repetitive Projects Prof. Tarek Hegazy Computer-Aided Construction Project Management,
Advertisements

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
Project Management - Part 2
Developing a Project Plan
Chapter 10 Resource Management. Objectives Human Resource Management Capital Resource Management Managing the Resource Profile.
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Critical Path and Gantt
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 4. C RITICAL P ATH B ASED T IME A NALYSIS Objective: To learn the principles of activity network based preliminary time analysis, calculating: –project.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Supplement Advanced Methods for Project Scheduling McGraw-Hill/Irwin.
Chapter 9: Reducing Project Duration
Reducing Project Duration
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
Reducing Project Duration
■ Project duration can be reduced by assigning more resources to project activities. ■ However, doing this increases project cost. ■ Decision is based.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
MANAGING PROJECT RESOURCES
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
MANAGING PROJECT RESOURCES
Time/Cost Trade-off Analysis
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
Chapter 9: Reducing Project Duration
© The McGraw-Hill Companies, Software Project Management 4th Edition Resource allocation Chapter 8.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)
Human Resources n How do we compete with everybody else who needs resources? n Where do we find people when we can’t hire new employees? n What does time.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
1 8.0 Definition of Project Management Project  Series of related jobs or tasks focused on the completion of an overall objective. Project Management.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Strategic Project Management1SPM PERT/CPM Technical Issues - Part 2 PERT/CPM Technical Issues zPERT & CPM Technical Issues: yResource Loading & Leveling.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
TOPIC-6- TIME-COST TRADE OFF
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Time-Cost Trade-off Models
PERT / CPM – Time-Cost Tradeoffs BSAD 30 Dave Novak Source: Anderson et al., 2015 Quantitative Methods for Business 13 th edition – some slides are directly.
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management Operations -- Prof. Juran.
UNIT II Scheduling Procedures & Techniques FLOAT
ACTIVITY PLANNING AND RISK MANAGEMENT
Reducing Project Duration
Project Planning & Scheduling
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
ENGINEERING MANAGEMENT (GE 404)
ENM448-Project Planning and Management
Project Scheduling Basics Activity on Node Precedence Diagrams
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Lecture 6: Time-Cost Trade-Offs
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

1 6. T IME -C OST O PTIMIZATION Objective: The optimization of project duration and cost by an appropriate crashing of activities. Summary: 6.1 Finding the Minimum Project Duration and Corresponding Minimum Cost. 6.2 Sensitivity Analysis to Determine the Minimum Project Cost. 6.3Determining the Minimum Project Cost for a Target Project Duration.

2 6.1 F INDING THE M INIMUM P ROJECT D URATION AND C ORRESPONDING M INIMUM C OST Find the minimum practicable project duration that can be achieved, and then find the corresponding minimum project cost. –Eg: highway construction, reduce project duration to minimize inconvenience to road users.

3 Can control the duration of an activity by varying the type and numbers of resources used, and the number of hours they are employed. To reduce activity duration, or bring forward its completion date: –can add resources; –change to higher performance resources; –employ more hours per day (overtime); –increase the number of shifts; –increase the number of working days; this is termed Activity Crashing.

4 Typically there is a time-cost trade-off in that reducing the duration of a task tends to: –increase direct costs (labor, equipment, materials, subcontractors). Why? However, reducing the project duration will tend to: –reduce indirect costs (site staff, head-office expenses, and penalty clauses). Also, increasing the duration of a task can: –increase direct costs by introducing idle time. There is a practical limit on how far an activity can be crashed. Why?

5 In reducing the project duration, there is no point in crashing an activity to a point where it is no longer critical. Why? –Will not reduce project duration. –Likely to add to the costs. Also, where there is a choice, crash the activities that give rise to the least increase in costs.

6 Fig. 6-1: Affect of Crashing an Activity on its Direct Costs (a) activity 1-2 time direct costs $ normal duration crash duration (b) activity 2-3 time direct costs $ crash cost normal cost direct costs $ (c) activity 2-4 time (d) activity 3-5 time direct costs $ (e) activity 4-6 time direct costs $ direct costs $ (f) activity 5-7 & 6-7 time act 5-7 act 6-7

7 Fig. 6-2: Initial Attempt at Reducing Project Duration (a) progress using normal activities for foundation operation continued TF = 0 TF = 3 TF = 0 TF = 9 TF = 3 TF = 0 TF = 2 TF = 0 Normal Duration = 32 Normal cost = = $2,400

8 Fig. 6-2: Initial Attempt at Reducing Project Duration (b) progress with all activities crashed TF = 0 TF = 2 TF = 0 TF = 4 TF = 2 TF = 0 TF = 1 TF = 0 Note, activities use crashed durations Crashed Duration = 19 (down 13) Crashed cost = = $4,700 (an increase of $2,300)

9 Fig. 6-3: Optimization of Cost by Relaxing Non-Critical Activities (a) first step in relaxing non-critical activities continued... Save costs by relaxing non-critical activities Start where the great- est savings can be made TF = 0 TF = 2 TF = 0 TF = 3 TF = 2 TF = 0 TF = 1 TF = 0 relaxed by 1 Crashed Duration = 19 (unchanged) Crashed cost = = $4,300 (a saving of $400)

10 Fig. 6-3: Optimization of Cost by Relaxing Non-Critical Activities (b) second step in relaxing non-critical activities continued... Select activity with next best cost savings TF = 0 TF = 1 TF = 0 TF = 1 TF = 0 relaxed by 2 Crashed Duration = 19 (unchanged) Crashed cost = = $3,700 (a saving of $1,000 from complete crash)

11 Fig. 6-3: Optimization of Cost by Relaxing Non-Critical Activities (c) third step in relaxing non-critical activities Select activity with next best cost savings TF = 0 relaxed by 1 Crashed Duration = 19 (unchanged) Crashed cost = = $3,600 (a saving of $1,100 from complete crash) Note, increase in number of critical activities

S ENSITIVITY A NALYSIS TO D ETERMINE M INIMUM P ROJECT C OST Find the minimum project cost, and then find the corresponding minimum project duration. Two methods: –Start with normal activity network and gradually crash: Crash critical activities with smallest rate of change in cost. –Start with crashed activity network (after optimized for cost) and gradually relax: Relax activities with largest rate of change in cost.

13 Fig. 6-4: Cost Senstivity Analysis by Relaxing Critical Activities (a) first step in cost sensitivity analysis continued... Start with crashed activity network optimized for cost P RIMAVERA BCN Mouse C rashing a ctivities !!! CRASH !!! TF = 0 Project Duration = 19 days Direct Cost = = $3,600 Relax activities, slowly extending project duration (for all parallel paths). Which activity(ies) give the greatest cost reduction rate ? There are six alternatives ! 1) Relaxing activity 1-2 gives what rate ? $200/day 2) Relaxing activities 2-3 & 2-4 gives ? =$325/day 3) Relaxing activities 3-5 & 2-4 gives ? 0+25=$25/day activity 3-5 is already at its normal duration 4) Relaxing activities 3-5 & 4-6 gives ? 0+50=$50/day 5) Relaxing activities 3-5 & 6-7 gives ? =$33.3/day 6) Relaxing activities 5-7 & 6-7 gives ? =$133.3/day So, relax activities 2-3 & 2-4 by 1 day saving =$ TF = 0 Project Duration = 20 days Direct Cost = = $3,275

14 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Indirect $75/day = Direct Costs = Combined Costs

15 Fig. 6-4: Cost Senstivity Analysis by Relaxing Critical Activities (b) second step in cost sensitivity analysis continued TF = Project Duration = 20 days Direct Cost = = $3,275 Relax activity 1-2 by 2 days saving 2x200=$ TF = Project Duration = 22 days Direct Cost = = $2,875

16 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Indirect $75/day = Direct Costs = Combined Costs

17 Fig. 6-4: Cost Senstivity Analysis by Relaxing Critical Activities (c) third step in cost sensitivity analysis continued TF = Project Duration = 22 days Direct Cost = = $2,875 Relax activities 5-7 & 6-7 by 1 day saving =$ TF = Project Duration = 23 days Direct Cost = = $2,741.7

18 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Indirect $75/day = Direct Costs = Combined Costs

19 Fig. 6-4: Cost Senstivity Analysis by Relaxing Critical Activities (d) fourth step in cost sensitivity analysis continued TF = Project Duration = 23 days Direct Cost = = $2,741.7 Relax activity 4-6 by 4 days saving 4x50 = $ TF = 0 TF = 4 TF = Project Duration = 27 days Direct Cost = = $2,541.7

20 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Indirect $75/day = Direct Costs = Combined Costs

21 Fig. 6-4: Cost Senstivity Analysis by Relaxing Critical Activities (e) fifth step in cost sensitivity analysis TF = 0 TF = 4 TF = Project Duration = 27 days Direct Cost = = $2,541.7 Relax activity 6-7 by 2 days saving 2x33.3 = $ TF = 0 TF = 6 TF = 0 TF = 2 TF = Project Duration = 29 days Direct Cost = = $2,475

22 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Indirect $75/day = Direct Costs = Combined Costs Finally, relaxing activity 2-4 by 3 days takes us back to the normal network. Optimum combined 23 days

D ETERMINING M INIMUM P ROJECT C OST FOR A T ARGET D URATION Find the minimum project cost for a given target project duration. –Eg: speed-up of the project to meet the contractual target date.

24 Fig. 6-5: Senstivity of Costs to Varying the Project Duration project duration (days) cost ($) = Combined Costs If target project duration = 20 days; use network in Fig. 6-4a. If target project duration = 21 days; use network in Fig 6-4b, relaxing act 1-2 by 1 day only to 6 days If target project duration = 27 days; might use network relaxed to 23 days (Fig. 6-4c)