Shear Test Assembly update

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Model RJ-3 System Package We offer a Res-Q-Jack™ Model RJ-3 3-point stabilization package system which includes: Qty. of (1) Jack Stand Kit with pins,
Connecting to industry. Fittings for Steam Hose Remember Steam is……… minimum 212 F.
Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
Design of Tension Members
Vacuum Vessel Production Readiness Review
Design of Tension Members
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Toshiba high pressure turbine casing for 600 MW power station, showing unusually long clamping bolts with very narrow flanges 1 Bolts in Tension pt 2 Andrei.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
Vbine Energy Generator Assembly Pictures and Info Slide Show.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Front Suspension Greg Habiak, Nicole Simon, Joe Vuto.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Weld Study Continued Filet weld on both sides Deflection (top flange removed) Stress Intensity (top flange removed)
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
Stycast Insertion Part 3 and preliminary glue picture on samples
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
UPDATED Notes from the June 22 Conf. Call on Weld Details, Bushing Details, and C-C Bolts.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Moment Connection Requires Bolts Outside the Flanges
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
Summary of first round of testing of shim concept for modular coil assembly
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
Analyses of Bolted Joint for Bolt Preload and Shear Load
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Peer Review NSTX TF Hub Assembly Friction Coating C Neumeyer 10/27/04 Requirements Testing Calculation Update Implementation.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
Update: TF Outer Ring and Clevis Design TF Outer Ring – Implemented recommendations from P. Rogoff. Modified Bolted Joint. Modified weldment to reduce.
BoltJoin ppt P. Rogoff 3/24/2011. NSTX Supported by P. R. 3/9/2011 Update Ring Bolted Joint Design and Recommend the Joint Geometry using bolts.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
(a) (b) A325-N or A325-X or A490-N A490-X Shear plane
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
NCSX Friction Coating Peer Review March 16, 2007 NCSX.
A View of NCSX Structural System and Load Path for the Base Support Structure.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Pins in Holes Shear Panels Rev 0 Stress Analysis By Leonard Myatt & ORNL Myatt Consulting, Inc.
NCSX June 29,2007GJG1 Supporting Slides for D. Williamson & K. Freudenberg Modular Coil Outboard Shims Testing.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Hao Guo LINAC Department Institute of Modern Physics.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Macromizer Wheelbase Design EJL
GLAST Large Area Telescope:
Crab Cavity HOM Coupler Specification Drawings & Tolerances
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Tube Heater, 3,000 Watt 240V Top + Back Front 1”Hole For Mixer Shaft
LARP Phase II Secondary Collimator RC-1
CONNECTION Prepared by : Shamilah
McMaster linear bearing #6709K180 with guide rail suppressed
LARP Phase II Secondary Collimator RC-1
SNS PPU Cryomodule Vacuum Vessel
Presentation transcript:

Shear Test Assembly update 3-9-07

Design of Pull Fixture history Single shear through bolt approach abandoned due to potential bending effects entering into test. Double shear (two tapped joints) adopted. Design calls for two tapped joints to be assembled into test fixture in a prototypic manner using all washers, bushings and frictional coatings used in the real assembly (140-190-2).

Use 4-post MTS testing Machine in 4508 50 Kip Loadcell (50 kip max load) Linear Alignment coupler (provided by Rick) [1.5-12 threaded internal and external] LVDT Rack (LVDT’s are 0.25 in max range) McMaster Carr tank [18” X 12” x 18”: 18 gauge) [3763K131] 2” Styrofoam enclosure either purchase or assemble panels with RTB. Tank base – 4.5 OD (2” ID) conflats and bellows Linear Alignment coupler Threaded Adaptor to go from grip to linear alignment coupler

This allows a maximum load of 25,000 lbs/joint in double shear. Machine Specs Max loading on machine in current configuration with loadcell, Grips, spherical bearings is 50 Kips. This allows a maximum load of 25,000 lbs/joint in double shear. Machine Maximum loading is 110 Kips.

Testing of Joint Static 1. Compression preload of 68,000 lbs on NCSX Bolts. (25 pulls) 2. Compressed preload of 25,000 lbs on NCSX bolts. (25 pulls) 3. no preload on joint (25 pulls) Cyclic loading on joint will be performed at 0.5 Hz to 100,000 cycles for case 1 and 2. (approx 55 hrs each of testing to get this) Thermal Float switch for LN2 being developed.

Cryo Containment for tank 4.5 OD half nipple 401004 (Clearance)  REF# 250-1 18 gauge SS can insulation MDC Bellows 400005 (clearance) REF# 250-X 2.00” Bellows ID welded Blank CF flange 110018 (through) REF# F450000 1.5”- 12 1.5”-12 Female Adaptor 1.5” pull rod stainless steel All items shown on this page have been received

Fabrication Status of Load-train All parts for tank-cryo system (including tank, insulation, bellows conflats etc) have been ordered and have arrived Pull rods have been ordered should be received by this week. Couplings, adapters, pull rods to be machined within two weeks. LVDT’s (0.25” max range) to be ordered this week. DWG’s of the pull specimen that PPPL will be assembling will be complete by 3-12-07.

Layout of Pull Fixture 1.5 -12 threaded Alignment between bottom and top pull rods must be maintained. 1.375 – 6 Class 3 tapped holes 140-190-2 bolt Assembly (2X) Tapped for ¾”-10 bolts Four ¾”bolts (2 per side) with slightly oversized holes in bottom plate to allow for alignment. Bottom plate can be made at ORNL if needed 1.5 -12 threaded

LVDT locations Pull Fixture iso view

Quick FEA Model Model has bonded interfaces at all connections. No slipping or sliding G10 bushings and middle shim. Model is locked at one end of rod. 50,000 lbs applied to one end of rod

Global Deflection (scaled)

Bolt assembly Deflection (obviously scaled)

Quick Check; How much length to dissipate LN2 in a 1 Quick Check; How much length to dissipate LN2 in a 1.5” rod in room air. LN2 Tb = 77K, x = 0 Kss = 14 W/m-K, L→∞, D = 1.5” Air: T= 25 C h = 15 W/m^2K Infinitely long rod Need 6 inches before hitting the MTS machine