Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Line Efficiency     Percentage Month Today’s Date
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Facility instruments User (P.I.) Instruments Clean Room.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Fast Internet Connection Publications (A. Uomoto)
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
Telescope Integration and Tests Tuesday Afternoon.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
LBT Q Engineering and Software Review ENGG Engineering General.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Magellan technical updates, Pasadena April 2006 – September 2006.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
SAC Report Povilas Palunas 2/23/ Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
Personnel Marc Leroy, asst. telescope engineer Instrument specialist search.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
4m. Blanco TCS Upgrade: Signals and Interfaces
Jan 2016 Solar Lunar Data.
4m. Blanco TCS Upgrade: Electronic Status at March/2010
Magellan Status Report March 19, 2016 Carnegie Observatories
Magellan Telescopes Observatory Report
Baltimore.
4m. Blanco TCS Upgrade: Signals and Interfaces
2017 Safety Group 1 – 5 Year Program Timeline Guide
2019 Safety Group 1 – 5 Year Program Timeline Guide
2018 Advantage Program Timeline Guide
Safety Group Program Timeline
2014 Advantage Program Timeline Guide *** Progress Visits ***
2014 Advantage Program Timeline Guide *** Progress Visits ***
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2017 Advantage Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Teleconference ACS – FREIA 19th June 2017
Safety Group Program Timeline
2012 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
MAPUTO PORT DEVELOPMENT COMPANY IT Projects Update Order to Cash - Completion of system development - User Training - Go Live (July 2018) - Post.
2016 Advantage Program Timeline Guide
Presentation transcript:

Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress

Personnel Jorge Bravo has been hired as a new Instrument Specialist Victor Meriño Has been promoted to Instrument Specialist. He will begin working in the new position as soon as the new telescope Operator is trained Mauricio Martinez has been hired as a new Telescope Operator and will begin working on September 27 Jorge Araya has been hired as a new Telescope operator and is now in training Felipe Sanchez has been promoted to Programmer and will begin in his new position after training the new telescope operator

Accomplishments Three M1 cell Hard-Points in Clay were removed and serviced Work continues on the actuator air cylinder repairs Complete service of Enclosure Trucks and Drives Both Enclosures Designed, built and installed the LDSS-3 cable wrap and designed and install the Guider cable wrap Installed IRMA, U of A 225 GHz and Ohio State PWV sensors

The new LDSS-3 and guider wraps

Accomplishments (cont.) Iodine cell for MIKE installed on retractable arm (Dec) Software control was implemented in July S-H tests carried out at NASE and NASW ports to characterize collimation of M1, M2, and M3 (Dec, Jan, Mar) Adjustments of M3 tilt made in March and later have significantly decreased focal plane tilt Testing continues as weather and time permit

Accomplishments (cont.) Plan developed for long-term systems administration Internet access will be through CTIO (instead of the Chilean telephone company) The transition to CTIO system administration is underway El Pino and LCO network and fiber backbone upgrades are underway All new computer installations are being done by CTIO

Baade Telescope Instrumentation Usage: 21 Sep Apr Sep 2005 IMACS63% PANIC37% Observing Statistics

Clay Telescope Instrumentation Usage: 21 Sep Apr Apr Sep 2005 MIKE51%60% MIKE fibers7%3% LDSS-214%-- LDSS-313%23% MagIC + CCD7%9% B&C8%-- Other5% Observing Statistics

Baade + Clay Telescopes Instrumentation Usage: 21 Sep Apr Sep 2005 IMACS31%32% MIKE26%29% MIKE fibers3%1% PANIC18%19% LDSS-27%-- LDSS-37%12% B&C4%-- MagIC4% Other--3% Observing Statistics

May 2001 through Apr 2005 Long-Term Trends: Instrument Usage May 01- Oct 01 Nov 01- Apr 02 May 02- Oct 02 Nov 02- Apr 03 May 03- Oct 03 Nov 03- Apr 04 Apr 04- Sep 04 Sep 04- Apr 05 Apr 05- Sep 05 MagIC+CCD20%31%13%18%15%8% 4% B&C44%17%34%18%20%6%9%4%-- LDSS-228%40%31%19%10%6%2%7%-- LDSS-3-- 7%12% MIRAC8%3%13%4%-- Classic Cam--9% 8%-- MIKE-- 31%34%30% 26%29% MIKE fibers-- 3%1% PANIC-- 2%17%21%15%18%19% IMACS-- 4%29%36%31%32% Other--3%

12 Apr-14 Sep 2005: Observing Statistics BaadeClay % Open66.8%70.0% % Lost to Weather31.1%28.7% % Lost to Telescope1.1%0.6% % Lost to Instrument0.9%0.1% % Lost to Computer0.1%0.6% % Total Downtime2.1%1.3%

Instrument Downtime: 21 Sep Apr Apr Sep 2005 MIKE0.2% MIKE fibers4.6%*0.0% MagIC0.0%0.1% LDSS-20.5%-- LDSS-30.0% B&C0.0%-- IMACS0.5%1.4% PANIC1.1%0.2% Other--0.0% Observing Statistics

Long-Term Trends Baade May 01- Oct 01 Nov 01- Apr 02 May 02- Oct 02 Nov 02- Apr 03 May 03- Oct 03 Nov 03- Apr 04 Apr 04- Sep 04 Sep 04- Apr 05 Apr 05- Sep 05 % Open % % Lost to Weather % % Lost to Telescope % % Lost to Instrument % % Lost to Computer % % Total Downtime % Clay May 01- Oct 01 Nov 01- Apr 02 May 02- Oct 02 Nov 02- Apr 03 May 03- Oct 03 Nov 03- Apr 04 Apr 04- Sep 04 Sep 04- Apr 05 Apr 05- Sep 05 % Open % % Lost to Weather % % Lost to Telescope % % Lost to Instrument % % Lost to Computer % % Total Downtime %

Most Common Problems: Telescopes Primary mirror support (mirror panics, faulty actuators, hard point actuators) Campaign underway to seal air cylinders in actuators; redesign of actuator electronics cards in progress; ~50% of all time lost on both telescopes is due to these problems (but improvement is being seen) Leaking hard point breakaway seals cause primary mirror crashes Faulty connector on Hard Point #2 LVDT sensor

Hard Point #6 in Clay cell

Hard-point Breakaway Assembly Hard Point Breakaway Cylinder

Problems and Failures Enclosures Shutter structure on Clay is scheduled for the October and November Engineering runs Enclosure Truck Bearing failures Louver seals Wind Screen & Moon Roof drives Rotating interface seal

Bearing failure on Baade enclosure truck

Work in Progress Telescopes –Actuator leak repair –Hard-point breakaway leak repairs –New actuator control cards –New PWM amps on rotators (on hold) –M1 thermal control mixing valves

Work in Progress Enclosures –Louver seals –Enclosure Truck bearing failures –Rotating interface seals –Windscreen & Moon roof drives –Rotating seal (Baade)

Work In Progress Software –M3 Tip-Tilt automation –Code normalization, ini files –Translate Fortran to C++ (enclosure) –Windscreen & Moon roof automation –EDS query tools –PWM Amps, Rotator guiding, servos –M1 thermo control servo

Gemini Silver and Aluminum Coatings

LLNL Protected Silver