SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
ILC Electronics Manufacturing Opportunities ILC Industrial Forum at Fermilab September 21-22, 2005 Ray Larsen for SLAC ILC Electronics Group.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Tunnel Electronics Baseline Issues Snowmass Workshop August 25, 2005 Ray Larsen for SLAC ILC Group.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Request for Proposal (RFP)
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
Camera PDR/CD1 Planning 19 September 2008
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
Advanced Research Electron Accelerator Laboratory
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Electron Beam Systems ETC and Methodology
X-Ray Endstations Update
Linac LLP Outline LINAC Long Lead Procurements
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006

January 30, 2006ILC Cost Modeling R.S. Larsen2 Outline  Review of Lehman 1999 NLC Cost Effort Organization of Effort, Definitions, Teams, Responsibilities Conceptual Design Cost Modeling, Guidelines Example Summary Cost Chart Documenting, Costing R&D Plans Configuration Control, Loaded Schedules, R&D Phase Cost Charts  ILC Modeling Example Cryo Section Instrumentation  Appendix 1: NLC Cost Rules, Guidance, Definitions

January 30, 2006ILC Cost Modeling R.S. Larsen3 NLC Cost Organization

January 30, 2006ILC Cost Modeling R.S. Larsen4 Technical System Definitions  Technical Systems include generic systems and activities (e.g.. Installation) not specific to one area of the NLC, but apply over many areas. Systems include: Sources: Electron and positron source systems RF: Klystrons, modulators, low level rf, rf structures and waveguide delivery systems Magnet Systems: Magnets, power supplies, cable plants, cooling Movers, Supports, Optical Anchor: Motors and controls for magnets and structures, structures, optical anchor Vacuum: Manifolds, pumps, electronics and cabling Collimators, Beam Dumps: Mechanics, instruments Instrumentation: Source lasers, laser wire scanners, synchrotron light monitors, profile monitors, toroid current monitors, etc.

January 30, 2006ILC Cost Modeling R.S. Larsen5 Definitions - Continued Global Timing: Master oscillators, stabilization, fiducial distribution, imbedded timing control chips Global Controls & Protection: Controls architecture, networks, distributed controls, feedback, software systems, machine protection, beam containment, personnel protection, racks Systems Installation: Installing beamline devices & systems Manufacturing facilities: Factories, shops, preassembly, testing Conventional Facilities: Sites, buildings, tunnels, utilities, environmentals, etc.) Project Planning & Management: Tools, methods, costs, schedules, engineering standards, etc.

January 30, 2006ILC Cost Modeling R.S. Larsen6 Technical Systems Engineering Teams  TSETs responsibilities include: Planning, cost analysis and scheduling for WBS1 (design and construction) and WBS2 (conceptual design and R&D) Reliability engineering and risk analysis applied to design, manufacturing, installation, checkout phases Optimization and standardization of system designs across all areas of the machine Design reviews, vendor development, documentation standards  TSETs combine Mechanical, Electrical and Facilities engineering disciplines as appropriate to each system. Each TSET is led by 1-2 Team Coordinators.

January 30, 2006ILC Cost Modeling R.S. Larsen7 TSET Personnel

January 30, 2006ILC Cost Modeling R.S. Larsen8 Global Systems & Planning

January 30, 2006ILC Cost Modeling R.S. Larsen9 TSET Reporting Responsibilities  Area Managers and Coordinators are responsible for major machine areas: Injection, Main Linacs, Beam Delivery. TSETs are responsible to Area Managers.  TSETs: Receive system requirements from and generate responses to each Area Manager. Area Coordinators are liaisons and members of the TSET. Work with Area Managers & Coordinators to achieve integrated, optimal, cost effective system solutions. Collaborate with Area Managers & Coordinators to define appropriate Conceptual Design and R&D goals for the CDR project.

January 30, 2006ILC Cost Modeling R.S. Larsen10 CD R&D, Construction Cost Modeling  TSET Functions (typical) Choose model for basis of estimate Develop Definitions, Descriptions, Specifications Perform scaling, parametric or bottoms up estimates Follow standard checklist to estimate activities, materials, labor, equipment Evaluate risk factors for contingency calculation (Note1) Produce top level cost summaries in Excel Coordinate data transfer to Planning Group for WBS Collect subsystem documentation into Cost Book (1) Later changed to adding global contingency to 50% confidence cost model

January 30, 2006ILC Cost Modeling R.S. Larsen11 NLC Cost Guidelines & Standards  Detailed guidelines for cost estimating posted on Website  Subsystem/Component Top Level Cost Summaries - 2/99  Note: Lehman Review task was to develop R&D budget for next 2 years PLUS construction cost estimate. Construction included ED&I as well as some R&D overlap. Abbreviated Checklist:  Design  Reliability engineering (HA)  Design reviews  Prototyping  Developing multiple vendors  Contracting test quantities and QC  Testing early designs and QA  Preparing bid packages  Awarding contracts  Manufacturing and QC  Acceptance testing and QA  System assembly  Installation, systems integration  System testing  Commissioning

January 30, 2006ILC Cost Modeling R.S. Larsen12 Standard Checklist - Sample

January 30, 2006ILC Cost Modeling R.S. Larsen13 Summary Global Systems (230 $M)

January 30, 2006ILC Cost Modeling R.S. Larsen14 CD & R&D Planning  Conceptual Design includes: Iteration/finalization of Requirements, Specifications, Descriptions Design, modeling, simulations, reliability studies, cost and risk analysis, documentation, CDR preparation  R&D Programs include: Reducing technical risk- proof of principle of new designs Improving reliability and efficiency, reducing operations costs Reducing cost risk- back cost estimates with industry proposals, prototype designs or quotations.  Task: Develop WBS2 Cost & Schedule Identify critical tasks CD-1 to CD-2, generate costs & manpower loaded schedule, integrate with Primavera WBS2

January 30, 2006ILC Cost Modeling R.S. Larsen15 Conceptual Design Key Goals DateMilestoneDeliverables MayNLC CD-1 ModelDOE “Lehman” Review NovemberCDR 0.4 ProgressCDR Outline Functional Requirements 2000 MayCDR 0.4 Design ReviewTechnical Specifications Designs/Component Lists; Risk/FMEA Analysis; Costs/Schedules; Priorities for NLC CDR 0.8 NovemberCDR 0.8 Progress 2001 MayCDR 0.8 Design ReviewAccelerator Design Complete Designs/Component Lists; Risk/FMEA; Cost/Schedules; Priorities for NLC CDR 1.0 NovemberCDR 1.0 ProgressDesigns/Components Complete Technical Specifications Complete 2002 MayCDR 1.0 Design ReviewCosts and Schedules Complete; Final Risk Analysis; Continuing R&D Plans Complete; Draft CDR Complete JulyCDR Complete Supporting R&D is mapped, costed, and loaded into Primavera.

January 30, 2006ILC Cost Modeling R.S. Larsen16 Engineering Configuration Control  Conceptual Design Key Goals Complete iteration of functional requirements & technical specifications within one year Complete final technical specifications by November  Machine Configuration will be defined and formalized as goals are completed.  Configuration Control (CC) must begin during CD phase prior to approval to start Engineering Design.  CC implementation a significant milestone demonstrating Design Phase readiness by formal handoff of firm specs from Physics to Engineering.

January 30, 2006ILC Cost Modeling R.S. Larsen17 CD R&D Plans

January 30, 2006ILC Cost Modeling R.S. Larsen18 CD R&D Plans-2

January 30, 2006ILC Cost Modeling R.S. Larsen19 Potential Cost Reduction Radiation-Hard Tunnel Electronics  BPMs, Movers, Vacuum electronics may lower costs 30-40% by cable plant reductions  Radiation Physics(*) calculates 7 R/hr at 1 m from linac beamlines. Sensitive (non-rad hard) electronics can be shielded with 4 in. lead. Shielding non-trivial.  Radiation hardened electronics w/o shielding tolerates 500 krad-1 MRad total dose, >10 yr. lifetime. Newer <0.35 µm processes tolerate ~ 10 MRad without degradation.  Potential advantages must be weighed vs. reliability/repair implications.  (*)Preliminary estimates of the radiation levels inside the Next Linear Collider Linac Tunnel, S. Rokni, J.C.Liu, S.Mao, SLAC Radiation Physics Note, September 25, 1998

January 30, 2006ILC Cost Modeling R.S. Larsen20 R&D Schedules  Detailed schedules for each TSET CDR Project in development, using MS Project, for ultimate integration into the Primavera Project master schedule.  Resource loaded FY99- FY02 for CD and R&D activities.  Schedules completed for: Mechanical Systems, Global Controls, Timing, BPMs, Mover Systems, Magnet Systems, Vacuum Systems, Modulators, Low Level RF, Instrumentation, and Machine Protection.  Others are in process.  All schedules will migrate to Primavera when completed.

January 30, 2006ILC Cost Modeling R.S. Larsen21 Resource Loaded Schedule - Movers

January 30, 2006ILC Cost Modeling R.S. Larsen22 Task Usage Cost Report - Movers

January 30, 2006ILC Cost Modeling R.S. Larsen23 CDR Project Resources  Budget Plan for each TSET CD/R&D program developed and integrated into Primavera for: Conceptual Design R&D Labor and M&S categories  Budgets profiled by Quarters (FY99-02)  Budget breakdowns for Technical Systems shown in the following graphs. Note: Costs for RF, Modulators and LLRF not included. Refer to Main Linacs section.

January 30, 2006ILC Cost Modeling R.S. Larsen24 R&D Budgets (- Global) $7M

January 30, 2006ILC Cost Modeling R.S. Larsen25 R&D Global Systems $5.5M

January 30, 2006ILC Cost Modeling R.S. Larsen26 R&D TSET Engineering FTE’s

January 30, 2006ILC Cost Modeling R.S. Larsen27 CD Phase R&D Budgets ($12.5M)

January 30, 2006ILC Cost Modeling R.S. Larsen28 Manpower Planning  CD Phase plans show strong rampup FY01-02  Additional Engineering manpower from Collaborating Institutions indicated  Current plan in operation with LBNL, and LLNL & Bechtel-Nevada (latter for Modulator R&D).  Future collaboration with LBNL planned in chip design and Controls.  Future collaboration with Fermilab desired in Controls, Software and other areas of need.

January 30, 2006ILC Cost Modeling R.S. Larsen29 Lehman Questions for Readiness for CD1 1. Are Technical Status, Planning and Management Tools ready? 2. Are R&D Phase cost, schedule and resources adequate? 3. Is the Management Structure adequate? 4. Is the NLC CD-1 description complete? 5. Are preliminary (WBS1) costs and schedules adequate starting points?

January 30, 2006ILC Cost Modeling R.S. Larsen30 ILC Cost Exercise Example  Conceptual Design Tunnel Instrumentation Topology Installation Model Cable plant Instrument Packaging Space Model Rack Profiles Tunnel Systems Integration

January 30, 2006ILC Cost Modeling R.S. Larsen31 RF Sub-System Design Development - DRAFT RF Support Tunnel Layout – BCD Model By C. Corvin, SLAC per data from S. Choroba, DESY

January 30, 2006ILC Cost Modeling R.S. Larsen32 RF Sub-System Design Development BCD-ACD Tunnel RF Penetration Layout

January 30, 2006ILC Cost Modeling R.S. Larsen33 Waveguide Distribution Detail Courtesy DESY

January 30, 2006ILC Cost Modeling R.S. Larsen34 Cryo Section Block Diagram ~ 30m

January 30, 2006ILC Cost Modeling R.S. Larsen35 Instrumentation Cables per CM

January 30, 2006ILC Cost Modeling R.S. Larsen36 Assumptions  Assume 3-Penetration Model per Klystron (~30m) Need to keep diameter small for radiation Each penetration has one WG and 2-3 cable conduits Racks located near each penetration in support tunnel No electronics in tunnel for this model All electronics in racks packaged in ATCA modules, crates  Example: BPM Model In PEP, 2 channels per CAMAC module In ILC, one channel per ATCA Mezzanine Card, 4 cards per Carrier Module (conservative)

January 30, 2006ILC Cost Modeling R.S. Larsen37 Model & Cost Tasks  Develop total system model for a Cryo module for all local instruments BPM, LLRF, Vacuum, Movers, Temperature etc.  Scale for different Areas Main Linacs, Damping Rings, Injectors etc.  Create cost spread sheets in Excel including ED&I, B&H, Installation, System Testing  Send to Cost group to integrate into WBS  Documents full model, assumptions in Cost Book for each subsystem

January 30, 2006ILC Cost Modeling R.S. Larsen38 Appendix 1 NLC Cost Rules, Guidance & Definitions

January 30, 2006ILC Cost Modeling R.S. Larsen39 Cost Rules (J.Cornuelle 3/25/00)

January 30, 2006ILC Cost Modeling R.S. Larsen40 Cost Rules – 2 (J.Cornuelle 3/25/00)

January 30, 2006ILC Cost Modeling R.S. Larsen41 Cost Guidance (R. Larsen, 3/30/00)

January 30, 2006ILC Cost Modeling R.S. Larsen42 Cost Definitions

January 30, 2006ILC Cost Modeling R.S. Larsen43 General Definitions

January 30, 2006ILC Cost Modeling R.S. Larsen44 Definitions Labor, M&S, B&H

January 30, 2006ILC Cost Modeling R.S. Larsen45 General Definitions -2

January 30, 2006ILC Cost Modeling R.S. Larsen46 Guidelines for Applying Labor Rates

January 30, 2006ILC Cost Modeling R.S. Larsen47 Rates & Codes Table 4.1: Labor Rates and Personnel Codes