Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Elena.Litvinenko CBM Collaboration Meeting Dubna 17 Oct Dipole magnet for CBM: current status P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov,
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Sergey Belogurov, ITEP, Moscow STS CAD model. GSI, STS mechanics: Conceptual CAD model development Sergey Belogurov ITEP, Moscow Engineer: Sergey.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
CBM Superconducting Dipole Magnet
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
1 J.M. Heuser et al. CBM Silicon Tracker Requirements for the Silicon Tracking System of CBM Johann M. Heuser, M. Deveaux (GSI) C. Müntz, J. Stroth (University.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 16 October 2008 CBMCBM Status.
Mechanics and Cooling Systems for the CBM STS SAINT-PETERSBURG STATE UNIVERSITY S.Igolkin, CONTENT.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI, 15 April 2010 Status of the CBM Silicon Tracking.
1 Compressed Baryonic Matter at FAIR:JINR participation Hadron Structure 15, 29 th June- 3 th July, 2015 P. Kurilkin on behalf of CBM JINR group VBLHEP,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
SC dipole magnet for CBM E.A.Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Ivanov, E.I. Litvinenko, A.I. Malakhov JINR, Dubna CBM Collaboration.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
RESEARCH and DEVELOPMENT for CBM (at LHE JINR) Yu.V. Zanevsky Laboratory of High Energies JINR, Dubna - NEW INFRASTRUCTURE - FAST GAS DETECTORS - DIPOLE.
Infrastructure for CO 2 cooling in the CBM experiment at FAIR Wolfgang Niebur and Johann M. Heuser GSI, Darmstadt, Germany for the CBM collaboration 18-Mar-2013Work.
Summary STS working group Design optimization STS (Strip) layout R&D (MAPS) Working packages.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
1 A Digitizer for Monolithic Active Pixel Sensors Christina Dritsa 1,2,3, Michael Deveaux 3 1 IPHC, Strasbourg, France 2 GSI, Darmstadt, Germany 2 GSI,
Dmitri Ossetski Obninsk State University Department of Applied Mathematics
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
1 J.M. Heuser − STS Development Microstrip detector GSI-CIS Johann M. Heuser, GSI Li Long, CIS CBM Collaboration Meeting, GSI, Update on.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Global Tracking for CBM Andrey Lebedev 1,2 Ivan Kisel 1 Gennady Ososkov 2 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany 2 Laboratory.
1 Participation of the Joint Institute for Nuclear Research (Dubna) in PANDA experiment at Future GSI Facility Nuclear Structure Physics Physics with Antiprotons.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI Darmstadt, 12 March 2009 Status of the CBM Silicon.
Monday, January 24 TimeTitleSpeaker 10:00 – 10:30The CBM experimentV. Friese (GSI) 10:30 – 11:00CBM Silicon Pixel Vertex DetectorM. Deveaux (GSI/IReS)
HERMES dipole magnet model for CBM CBM Collaboration Meeting September 25-28,2006 Pavel Akishin Elena Litvinenko Victor Ivanov LIT JINR, Dubna
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
Ring finding efficiencies and RICH event display Semeon Lebedev GSI, Darmstadt and LIT JINR, Dubna Gennady Ososkov LIT JINR, Dubna X CBM collaboration.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
LIT participation LIT participation Ivanov V.V. Laboratory of Information Technologies Meeting on proposal of the setup preparation for external beams.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
RIKEN/CERN pixel electronics/bus R&D plans Johann M. Heuser RIKEN - Radiation Laboratory PHENIX Silicon Upgrades Meeting 10 April 2003.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Superconducting dipole magnet for CBM. The status of the SC dipole magnet for project CBM. E.A. Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev,
The STS-module-assembly:
The Status of the CBM Experiment
– a CBM full system test-setup at GSI
n-XYTER Hybrid Developments
GSI, for the CBM Collaboration
Progress with System Integration of the CBM Silicon Tracking Detector
The workflow of module assembly for the CBM Silicon Tracking System
Oleg Vasylyev, GSI Helmholtz Center, Darmstadt, Germany
Study of some aspects of straw tube detectors
Strangeness Prospects with the CBM Experiment
Finalizing the CBM-MVD Geometry: CAD and Simulation
Status of the PANDA Magnet
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
L H C A T L A S International Collaboration on the LHC Project
Presentation transcript:

Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering

Johann M. Heuser – The CBM Experiment at FAIR 2 Silicon Tracking System STS: 8 detectors stations in thermal enclosure Stations: carbon enforced ladder structures with peripheral read-out. 2 Ladders: sensors, bonded to ultra-thin long micro-cables, read-out electronics at periphery S. Belogurov et al., S. Igolkin et al, E.A. Matyushevskiy et al.

Johann M. Heuser – The CBM Experiment at FAIR 3 Superconducting dipole magnet CAD design study Field profile along the beam axis B[T] E.A. Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov, V.V. Ivanov, E.I. Litvinenko, and A.I. Malakhov JINR, Dubna, Russia

Johann M. Heuser – The CBM Experiment at FAIR 4 Long-term engineering project We must have long-term available engineering capabilities at GSI to ensure system integration of STS-MVD-Beam pipe-Magnet Contact person:Wolfgang Niebur, GSI who will collect the different inputs from CBM institutes and will be in contact with the GSI construction group under discussion/planning now: how to transfer the work and effort done so far by S. Belogurov et al. to GSI in 2009.