AAE450 Senior Spacecraft Design Project Aquarius 2.15.2007 Jonathan Kubiak Jonathan Kubiak Week 5: February 15th, 2007 Human Factors: Manned Rover, Martian.

Slides:



Advertisements
Similar presentations
Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Advertisements

18-OCT-2005 Lyndon B. Johnson Space Center space radiation analysis group 1 Operational Aspects of Space Radiation Analysis October 18, 2005 Mark Weyland.
Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: Team Member Stephen Hu.
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 10*: March 22 th, 2007 Human Factors/Integration/APM Mars Taxi Emergency Airbag Update Final.
NNJ09BH0123RAppendix L A-Crew, Robotics, Avionics, and Vehicle Equipment (CRAVE)- Unrestricted Data Attachment L-2-A-1.
AAE450 Senior Spacecraft Design Poliskie - 1 T.J. Poliskie Week 5: February 15, 2007 Propulsion Earth Taxi, Mars Taxi Group Zero Boil-Off Cryogenic Propulsion.
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
AAE 450 Spring 2008 Dana Lattibeaudiere February 7, 2008 New Code Developments.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
AAE 450 Spring 2008 Justin M. Rhodes Avionics – Telecommunications Analysis Code Integration and Automation Webmaster Sample Design and Failure.
AAE450 Spring 2009 X 0 Power System Solar - Battery Solar arrays Tony Cofer- Power System.
AAE450 Senior Spacecraft Design Catherine Frey Week 2: January 25 th, 2007 Propulsion Team Leader Liquid Propellant Tank Sizing.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 8: March 8 th, 2007 Power Group TV Nuclear Power System – with Shielding!
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 4: February 8 th 2007 Project Aquarius Power Engineering Habitat.
AAE450 Senior Spacecraft Design Catherine Frey Week 8: March 8 th, 2007 Propulsion Group, Transfer Vehicle Group, Mars Launch Vehicle Group, aM/aE/dM/dE.
AAE450 Senior Spacecraft Design Ben Jamison Week 5: February 15th, 2007 Aeronautics Group Taxi Capsule Vehicle Group ET/MT Group Integration Group.
AAE450 Senior Spacecraft Design 3/1/2007 Ryan 1 Ryan Scott Week 7: March 1st, 2007 Power Group Leader TC, TV, dE, aM, dM, aE, CS1-2, CSM *This Week* Power.
AAE450 Senior Spacecraft Design 2/15/2007 Scott 1 Ryan Scott Week 5: February 15th, 2007 Power Group Leader TC, TV, dE, aM, dM, aM, CS1, CS2, CS3 *WITH.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 11: April 5 th 2007 Project Aquarius Final Presentation Storyboard.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 10: March 29 th, 2007 Power Group Earth Taxi, Mars Taxi, Electric Propulsion.
AAE450 Senior Spacecraft Design Catherine Frey Week 4: February 8 th, 2007 Propulsion Group, Transfer Vehicle Group Transfer Vehicle Combustion Chamber.
AAE450 Senior Spacecraft Design Project Aquarius high-tech measurement system Mars Launch Vehicle: 20 people tall Mars Taxi: 3 people tall Earth Taxi:
AAE450 Senior Spacecraft Design Dan Maguire Week 2: January 25 th, 2007 Structures Group Group Leader, Ares 1, Earth Taxi, Mars Taxi, Depart Mars, Arrive.
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 8: March 8 th, 2007 Human Factors/Integration/APM Taxi Capsule Crew Compartment Final Update.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 10: March 27 th 2007 Project Aquarius Power Engineering Group Surface.
AAE450 Senior Spacecraft Design Atul Kumar Presentation Week 3: February 1 st, 2007 Aerodynamics Team Re-Entry vehicle analysis - Lifting body 1.
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 6: February 22 th, 2007 Human Factors/Integration/APM Human Limitations Update/Mars Taxi Escape.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 6: February 22 nd, 2007 Human Factors – Group Lead HAB & TV Vehicle Groups This Week:
AAE450 Senior Spacecraft Design Rick Hutchings Week 2: January 25 th, 2007 Thermal Control Thermal Control Systems for TV.
AAE450 Senior Spacecraft Design Brandon Anderson Week 3: February 1st, 2007 Structures Group Taxi Capsule, Electric Propulsion System.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 8*: March 1 st, 2007 Human Factors – Group Lead HAB & TV Vehicle Groups This Week:
AAE450 Senior Spacecraft Design Project Aquarius Kirk Akaydin Week 3: Feb. 1 st, 2007 Project Manager Cost/Schedule/Risk Analysis This Week: Cost Scheduling.
Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: 98 1 Team Member Stephen Hu.
AAE450 Spring 2009 Kelly Leffel 3/0509 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control Kelly Leffel Structures and.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 4: February 8 th, 2007 Human Factors – Group Lead HAB, TV, Integration Group This.
Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: Team Member Stephen Hu.
ARTEMIS Advanced Rover Technology for Exploration on the Moon using In Situ utilization Jesse Hecht Sean Fierman Cedrick Ngalande.
AAE450 Senior Spacecraft Design Crystal Wilcox Week 3: February 1st, 2007 Structures Group Mars Habitat, Transfer Vehicle (Crew Hab)
AAE450 Senior Spacecraft Design Project Aquarius Mike Kowalkowski Week 2: January 25 th, 2007 Project Aquarius Power Engineering Habitat, Battery, and.
AAE450 Senior Spacecraft Design Matthew Fox Week 4: February 8th, 2007 Structures Group, Integration Group Transfer Vehicle Truss CAD Transfer Vehicle,
AAE450 Senior Spacecraft Design Rick Hutchings Week 10: March 29 th, 2007 Thermal Control Final Presentation Slides 1 st Draft Hutchings, 1.
AAE450 Senior Spacecraft Design Anderson (1) Brandon Anderson Week 7: March 1st, 2007 Structures Group EP Vehicle, TC Landing Gear.
AAE450 Senior Spacecraft Design Ryan Scott Week 3: February 1st, 2007 Power Group Leader TC, TV, dE, aM, dM, aM, CS1, CS2, CS3.
MinMars Update Telecon October, 25 th Mars Design Reference Architecture 5.0 New reference document as of July 2009 – NASA-SP – Uploaded.
1 Sarah Shoemaker Feb Structures Group Internal Structures, CAD Balloon Gondola CAD and analysis AAE 450 Spring 2008 Structures.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
AAE450 Senior Spacecraft Design Rick Hutchings Week 8: March 8 th, 2007 Thermal Control Insulation and COM Sat Thermal Control.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 6: February 22 nd, 2007 Power Group Nuclear Power Capabilities TV Nuclear.
AAE450 Senior Spacecraft Design Ryan Scott Week 1: January 18 th, 2007 Power Group Leader Solar Panels / Transfer Vehicle / Capsule.
AAE450 Senior Spacecraft Design Matthew Guyon Week 5: February 15 th, 2007 Thermal Control/Team Leader Mars Rover Thermal Control System/ Ablative Thermal.
AAE450 Senior Spacecraft Design Breanne Wooten Week 2: January 25 th, 2007 Human Factors/APM Human Limitations/Taxi Capsule.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 2\22\2007 Mike Kowalkowski Week 6: February 22 nd 2007 Project Aquarius Power Engineering.
AAE450 Senior Spacecraft Design Maguire,1 Dan Maguire Week 4: February 8th, 2007 Structures Group Group Leader, Ares 1, Earth Taxi, Mars Taxi, Depart Mars,
AAE450 Senior Spacecraft Design Dorrie Byford Dorrie Byford Week 7: March 1 st, 2007 Communications Group Leader / Autonomous Rendezvous / Integration.
AAE450 Senior Spacecraft Design Mark Cunningham Mark Cunningham Week 10: March 29 th, 2007 Communications Team Final Presentation Slides – First Draft.
AAE450 Senior Spacecraft Design Atul Kumar Week 1: January 18 th, 2007 Aerodynamics Team Entry vehicle analysis 1.
A&AE 450 – Senior Design Un-pressurized Surface Vehicles, Local Science Issues and Robotic Exploration February 13, 2000 Christopher Burnside.
AAE 450 Spring 2008 Vince Teixeira 7 February 2008 Structures Nose Cone Design/Heating Analysis.
AAE450 Senior Spacecraft Design Mark Cunningham Week 6: February 22 nd, 2007 Communications Team, Comm. SATs CAD, TV/ET/MT Groups Communication Satellites.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 8: March 8 th 2007 Project Aquarius Power Engineering Group Surface.
AAE450 Senior Spacecraft Design Kate Mitchell Week 2: January 25 th, 2007 Human Factors – Team Lead Habitat (HAB), Crew Transfer Vehicle (CTV) This Week:
AAE450 Senior Spacecraft Design Matthew Fox Week 2: January 25 th, 2007 Structures Group Material Selection / CAD Transfer Vehicle, Mars Crawler, Construction.
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
AAE450 Senior Spacecraft Design Jonathan Kubiak Week 1: January 18 th, 2007 Human Factors.
June 3, 2008 Slide 1 Lunar/Mars Surface Power Architecture Analysis Follow-up Chase Cooper August 7, 2008.
NASA Design Team January 31, 2003
Week 4 Presentation Thursday, Feb 5, 2009
Team A, Power Group Presentation
Embraer ERJ 135 VIP PHOTOS SPECIFICATIONS AIRCRAFT SPECIFICATIONS
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Jonathan Kubiak Week 5: February 15th, 2007 Human Factors: Manned Rover, Martian Crawler, CAD Modeler & Concept Sketch Artist Manned Rover Concept V2.0 “Desert Rat”

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Manned Rover V2.0 Design Modifications Increased Volume to Accommodate 4 Crew Members Centered Cylindrical Main Compartment Spherical Airlock/Crew Transfer Compartment –Facilitates Crew Transfer Between Crew Capsule and Rover as well as Hab and Surface Radiation Shielding – 20 kg/m^2 Estimates of Structure Included

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Conclusions Human Factors Total Vehicle MassPowerVolume 6.5 mt58 kW27 m^3 MassPowerVolume 1.5 mt7.8 kW19.8 m^3 Vehicle Dimensions Crew Compartments –Length: 6.6m –Height: 2m –Width: 2m Totals –Length: 6.6 m –Height: ~3m –Width :~3-4m

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak References 1.] Stilwell, Don, Ramzy Boutros, and Janis H. Connolly. "Crew Accomodations." Human Spaceflight: Mission Analysis and Design. Ed. Wiley J. Larson and Linda K. Pranke. New York: McGraw-Hill ] Hanford, Anthony J., ed. NASA Johnson Space Center. Advanced Life Support Baseline Values and Assumptions Document. Aug Feb pdfhttp://ston.jsc.nasa.gov/collections/TRS/_techrep/CR pdf 3.] Man-Systems Integration Standards. NASA-STD Revision B. NASA- Lyndon B. Johnson Space Center. July Last updated: 6/15/ ] Hanford, Anthony J. Ph.D. Advanced Life Support Baseline Values and Assumptions Document. NASA-Lyndon B. Johnson Space Center. Houston, Texas ] Wade, Mark. Encyclopedia Astronautica. Dec

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak References 6.] Machinists – Materials Plastics Comparison Table. 7.] Cengel, Yunus A. Michael A. Boles Thermodynamics An Engineering Approach. 4 th Ed. New York: McGraw-Hill. p.829.

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Back Up Slides Revised WorkSheet *See end pages for Full Print-Out

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Revised Worksheet

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Vehicle Dimensions Basic Vehicle Dimensions - Side View by Jonathan Kubiak 2.0m 3.6m 2.0m Proposed Interior Layout - Top View by Jonathan Kubiak Airlock/Crew Transfer Compartment Hatch To HAB/ Surface Crew Transfer Hatch - Underside Storage Open Interior Hatch Head Driver/Manipulator Operator View Bubble Pass 1 Driver Man. Op.Pass 2

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Motors

AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Rover Power Requirements Care of: Mike Kowalkowski Mars Rover (Manned) Power System: –Mass: 1000 kg –Volume: 1.7 m^3 –Peak Power: 48 kWe –Idle Power: 10 kWe –See attached MATLAB code to size power for all vehicles –Total mass: 5 mt.9 mt – Human Factors 2.5 mt – Structures.6 mt – Towing / Storage 1 mt – Fuel Cells & Battery Backup Capabilities and Sizing: –Max level velocity: 40 km/hr –Max range: 50 km 1-way (25 km reserve) –Max incline: 30 o –Max speed at incline: 3 km/hr –Time at incline: 10 minutes –12 hour autonomous operation –Utilizes in-situ fueling station