K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.

Slides:



Advertisements
Similar presentations
XFEL C+C HARDWARE : REQUIREMENTS 1) To receive, process and store Timing Signals from TR ( Timing Receiver ) in same crate : - 5 MHz Bunch CLOCK - Bunch.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Kuno-Group B4 Yuuki Matsumoto A report for Graduation research Development of Trigger Board for MPPC (for MuSIC experiment) A report for Graduation research.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Beam Position Monitors MICE CM Harbin January, 2009.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
Radphi Analysis at I.U. Dan Krop 9/06/02. Overview BGV Callibration Using Gradphi Monte Carlo PWA Formalism for Spin 1 Beam Moments of the Angular Distribution.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Calibration of the calorimeter by punch-through muons and cosmic muons Doroshenko M. E391 collaboration.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
S-2S memo WC Toshiyuki Gogami 24Apr2015.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
Testing of Latch-TDC Da-Shung Su Jia-Ye Chen, Hsi-Hung Yao, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2011/07/13.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Beam Studies December 2014 Runs: 7820 – 7860 December 27, 2014.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
ICT Module 4 Revision. ICT Attenuation and cable type What is attenuation What cable should be used between buildings and why?
X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
TRIGGER & T0 for RUN 2016 V. Yurevich meeting CAEN digitizer T0.
2009/06/08 NKS group Okuyama Akira
Jean-Sebastien Graulich, Geneva
AHCAL Beam Interface (BIF)
Preparation for CERN test beam
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
The PrimEx-I Experiment
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Sun Mon Tue Wed Thu Fri Sat
RPC Front End Electronics
Sun Mon Tue Wed Thu Fri Sat
BUCKEYE has internal shift register which controls calibration
Sun Mon Tue Wed Thu Fri Sat
Compton Run Liping Gan June 18, 2004.
ASD-TDC joint test with MDT-CSM
Presentation transcript:

K0 meeting 2007/10/17 Taito Kawasaki

~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31 runs, 2768 spills | tagger : 16.1×1010 event | accept : 31.6×106 event 10/15 (Wed) : Beam on (1.2 GeV mode) Decided to stop Date

Target system during beam time

Problems Masked SDC wire IH was not fixed to SDC (upside) ASD card changed : 30 -> 109 Didn’t use “clean ground” OHVR7U, R8U, L12U was fixed with optical cement IHL2,R2 booster didn’t work Input line of TUL : 32ch cable -> 64ch cable (extra 32ch was dummy) Network sometime broke (caused Target control system trouble) PM AMP caused noise (IH trigger and TDC line) -> Changed channel BPM : Veto counter was broken, a trigger counter was moved Trouble on Radcon (“Delayed signal” used ?) HV down happened (CDC ch 7) 5-6 times.-> Module ? Data Logger TDC calibration is... z